17--Building Construction and Maintenance
design and installation prevents the direct application of radiant heat on to the con tainer Blower type or radiant heaters should not be directed toward any LP-gas container within 20 ft If two or more heater-container units (of either the integral or nonmtegrated type) are located in an unpartitioned area on the same floor, the container (s) of each unit should be separated by at least 20 ft The total water capacity of contamers manifolded together m an unpartiboned area should not be greater than 735 lb (nominal 300 lb LPgas capacity) These containers should also be separated by at least 20 ft
On floors on which heaters are not con nected together for use, containers may be manifolded together for connection to heaters on another floor, provided that (a) the total water capacity of the containers connected to any one manifold is not greater than 2450 lb (nominal 1000 lb LP-gas capacity), and (b) where more than one manifold having a total water capacity greater than 735 lb (nommal 300 lb LP-gas capacity) is located m the same unpartitioned area, the manifolds should be separated by at least 50 ft
LP-gas cylinders should not be refilled in side buildings or structures Cylinders should be stored outside of buildings, should stand on a firm and substantially level surface, and should be secured m an upright position
Demolition o! structures
Only minor demolition should be done by plant personnel Specialists in the field should be employed if structures to be removed look as though they will present a problem, such as being over 25 ft high, being of steel or re inforced concrete construction, or adjoining other structures that are not to be damaged
Wrecking specialists are familiar with the procedures and precautions necessary to do the work safely, to protect the public and adjacent property, and to comply with ap plicable federal, state, and municipal codes and regulations
Following are some fundamental safety pro cedures and suggestions for mmor demolition operations to guide the inexperienced in safe removal of unwanted structures
1. Make provision to keep the public and unauthorized plant employees at least 15 ft away from the structure
2 Make an engineering survey, by a compe tent person, of the structure This is to determine the condition of the framing, floors and walls and check for any un anticipated conditions Check for haz ardous chemicals, gases, explosives or flammable materials
3 Disconnect utility services (gas, steam, electricity) outside the building Main tain water lines as long as possible In stall a temporary water source for fire protection and for wetting down the site to reduce dust
4 Remove all glass doors and windows throughout the structure
5 Strip off lath and plaster to eliminate ex cessive dust during succeeding operations
6 Remove chimneys and extensions of walls above the roof down to roof level while working from the roof
7 Remove the roof
8 Remove walls by picking them apart, either by machine or by hand tools Work from scaffolds supported independ ently outside of the walls
9 Remove all debris promptly, using chutes or thru internal holes
10 Avoid subjecting walls to lateral pressure from stored matenal or to lateral impact from falling matenal
11 Barncade any area where matenal is be ing dumped, and place bamcades where necessary to protect workmen from flying pieces
12 Permit no employee to work below others
13 Require safety hats, goggles, safety shoes, respirators, and gloves if needed for all workers (See Chapter 19, "Personal Protective Equipment ")
When the conventional methods for altering or removing concrete installations are infeasi ble or undesirable, sometimes "{>owder cut ting," a process that substitutes penetration by intense heat for concussion breakage, can be employed, or demolition by explosives may also be utilized For a description of powder cutting, see Chapter 34, "Welding and Cut ting," in this Manual