Document 7RYKLR58oDgE9gdmxbVGv0bJB

1o -Name Uoi'ii'hneni i.. L. Suter____.Plant Manager From - U.ime 4 Uep.wimeni A. C. liar bag lia Industrial Hygiene <JD1,,1 PERIODIC ASBESTOS SURVEY Inter Company Correspondence Phone No. Dote Pile Cod# Division December 7, 1982 Piant/Oflice CIMS Number Power Train ___Division Toledo Machining____ 474-00-00 Division Pisni/Ofhco CIMS Number Personnel & Admin. Office Chrysler Center 417-05-19 Summary An Industrial Hygiene investigation was conducted at the Toledo Machining Plant on November 17, 1982 for employee expo sure to asbestos on the west brake assembly operation. Results from the survey indicated all employee exposures to be below the permissible exposure limit (PEL) of 2 fibers/cc of air. At the time of the survey the east brake assembly line was not operating and will have to be monitored at some future date. Discussion The asbestos survey at the Toledo Machining Plant was com pleted on November 17, 1982. Results from the survey indicated that the employees associated with unloading the brake pads from the shipping container and loading onto the line, and those employees located just down the line from these operations have measurable exposures to asbestos, but not exceeding the PEL of 2 fibers/cc of air. As a result of these exposures the employees are required to have an annual medical exam under General Industry Standard 29CFR 1910.1001 (j). Further monitoring at this time is not required, but care should be exercised at these job stations to avoid creating any excessive asbestos dust. When production resumes on the east brake assembly line, HO-^ contact this office so arrangements can be made to monitor those employees for asbestos exposure. Will flU To CK If you have questions pertaining to this report, contact the writer. l A (Li Ui hm Attachments cc: R. B. Allen F. A. Burnett T. T. Carroll, M. D. T. P. Duross N. McCallum R. D. McIntosh, M.D. G. A. Sattelmeier f 1 1 3 s ^^ ^ I ,.t r i-j .. ul 0 -I , ^ PLAINTIFF'S EXHIBIT CIIR-200 U). Johnson Son*. - Bu*r Not Ei'ceebiN< ?Efcmss^ce: B^os^e. LlHtjS - % ft or ~T h S A"ST HrtvC. j? Ph^SiC^l. k^tAtn, & i-%n-^n 3 Data Sheet Toledo Machining Plant November 17, 1982 Asbestos Permissible Exposure Limit F. Hoffbauer #278-40-8106 West brake assembly line - unload line to CC3container Repeat Time-weighted average B. Rodgers #308-42-6050 West brake assembly line - inspector, transfer assembly to unload station Repeat Time-weighted average Concentration (fibers/cc) 2 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 W. Johnson #413-20-9714 West brake assembly line - unload brake pads and stack on loader's table Repeat Time-weighted average 1.7 1.0 1.3 C. Fuller #278-26-5526 West brake assembly line - place rubber band on adapter and install on assembly 0.1 Area sample adjacent to J. Fleming's #293-36-8373 work station - install brake pads on assembly 0.1 J. Little #275-34-1206 West brake assembly line - install retainers on brake assembly <0.1 C. Barrett #278-20-1348 West brake assembly line - install retainers on brake assembly <0.1 All samples were collected on cellulose ester filters using m:.'A Model G Pumps and analyzed by phase contrast microscopy.