Document 7ROZ3REBwkZwBzQ9pDV7KZmY6
Central m
E NGINEERING
De PARTM ENT
) CCA NO.
1430 PRODUCT
PROGRESS REPORT
AR NO. ------
DATE Feb.
Aroclors
23,
TITLE
Increase Aroclor Capacity
1968
DISTRIBUTION
CEO SECTION MANAOER CED PROJECT MANAOER
R. P. SteVenS R. W. PeteTSOn
DIVISION Organic
PUANT Anniston
division representative______W. F. Taffee
O. R. Bailey J. M. Depp i- M. Dmytryszyn R. E. Emling P. W. Enoch F. J. Holzapfel R. W. Kaltenrieder (2) F. P. LaBelle R. E. Lenz Russell L. Miller E. Negro C. I>. Parish A. B. Terry
ORGANIC DIVISION
H. C. Carder
R. J. Stratmeyer A. L. Klemm H. L. Williams
a 1
W. J. Burkett R. R. Cook/R.,C. Herman R. E. Howard
SCOPE
Aroclor production facilities at Anniston will be expanded by the addition of tankage for storage and for the preparation of blends, drumming facilities in a new building (to be expanded on another project, CEA 1452, into a product warehouse), new and larger flakers for solid Aroclors and for biphenyl in the same building, and packaging equipment for flaked products. Tank truck loading and a new track spur with tank car loading and unloading facil ities are included.
0057135
confidential
information
THIS DOCUMENT IS THE PROPERTY OF MONSANTO COMPANY AND THE RECIPIENT IS RESPONSIBLE FOR ITS SAFEKEEPING AND DE
POSITION. IT CONTAINS CONFIDENTIAL INFORMATION WHICH MUST NOT BE REPRODUCED. REVEALED TO UNAUTHORIZED PERSONS OR SENT OUTSIDE THE COMPANY WITHOUT PROPER AUTHORIZATION.
ce- i4 TOWOLDMONOQ43960
Product____
Aroclors
Titl
Increase Aroclor Capacity
-2-
Location.
Anniston
Appropriation Currant Estimate
Date of Estimate Expended t Committed Spent This Month Scheduled Completion On Schedule?
MS 1.400 US 1,307*
December 1967
MS 336 us 29
August and October
NO (Sewer Delays)
1968
Process Desi0i, % Complete Mechanical Design, % Complete
Construction, * Complete % Expended & Committed Design Manpower Construction Manpower
* $93,000 being handled under CEA 1452
Last Month This Mo.
74 80 50 60
19 26 12 12
SUMMARY:
Corrective sewer work is underway. Tank farm start-up will be August instead of July, and flaker-packaging probably mid-October. Detail definition of the flaker area is now underway.
Field Work:
The 24" process sewer is now being relocated. Gunnite repairs to the 36" storm sewer are well along, and promise to be successful. A new sanitary sewer has been tied in permitting excavation of septic tank fields. Power poles have been relocated to clear the site. We now plan setting tanks 5/6/68. About seven weeks were lost: two may be regained before start-up.
Tank Farm;
Design is well along. Plant ammendments to the blending process will require modifications at blend tank auxiliaries. A few in strument details remain to be resolved.
Flaker-Packaging:
A workable layout has been developed on the study model and is be
ing discussed with the plant. The flaker vendor's strike has not
been settled. Quotations have been requested on solids handling
equipment. Tests are planned at selected vendors.
'
R. W. Peterson Acting Project Manager
vo
oo*.1
TOWOLDMONOQ43961