Document 7ROXz62Y4GMmom7DxexQbvLE6

INDUSTRIAL HYGIENE REPORT TEXAS OPERATIONS DOW CHEMICAL USA AN OPERATING UNIT OF THE DOW CHEMICAL COMPANY DOW-835 DATE ISSUED: PLANT CODE: January 4, 1989 TT2U0b---------- TITLE: ASBESTOS MONITORING DURING TRAH8ITE MODIFICATION AT MACHZME SHOP, B-105, DECEMBER, 1988 BY THE PLAHT B CASPEMTES8 AUTHOR(S) R. Li WOOSTER ^ REVIEWSR(S) C. L. SANDLIH (7 SUMMARY /- 5- g ? JLcMw /-f-8J On December 7, 1988 short term personal and eight-hour area monitoring for asbestos was conducted during a transite modification job at the B-105 Machine Shop by the Plant B Carpenters. The monitoring was done to ensure that the approved asbestos handling procedures would result in acceptable airborne concentrations of asbestos. All measured asbestos concentrations were well below the OSHA STEL of 1.0 fiber per cubic centimeter (30 minute period) for employees performing the job and below the Permissible Exposure Limit (PEL) of 0.2 fibers per cubic centimeter for area sample taken during the job. The highest personal short-term level found was .01 fibers/cc. The area sample was .005 fibers/cc. CO --I CD CD cn CO CO --J DISTRIBUTION D. E. Cragar, B-101 C. K. Browdy, M.D., B-101 H. C. Hewett, B-3501 S. L. Smith, B-108 J. E. Oswalt, B--106 F. H. Koppe, B-106 T. Easley, B-105 D. F. Gonzales, B-105 M. G. Swank, 1803, Midland G. W. Engdahl, 1803, Midland *L. W. Rampy, 1803, Midland *J. E. LeBeau, 1803, Midland Cover Sheet Only RESTRICTED FOR USE WITHIN THE DOW CHEMICAL COMPANY ONLY IHS File Bl-3425 2 STOOI 5388 ASBESTOS MONITORING DURING TRANSITS MODIFICATION AT MACHINE SHOP, B-105, DECEMBER, 1988 BY THE PLANT B CARPENTERS INTRODUCTION Personal and area monitoring for asbestos was done during the modification of transite siding at B-105 by the Plant B Carpenters. The job consisted of cutting two 2-5/8 inches holes in a transite siding vail. The monitoring was done to ensure that the use of approved job procedures would result in acceptable airborne concentrations of asbestos. CONCLUSIONS AND RECOMMENDATIONS 1. All measured asbestos concentrations were well below the OSHA Permissible Exposure Limit (PEL) of 0.2 fibers per cubic centimeter and the OSHA STEL of 1.0 fiber/cc for a thirty minute period. The highest level found was .01 fibers per cubic centimeter during the thirty minutes that it took to cut the holes in the transite. The area sample obtained was .005 fibers/cc. All exposures were potential since workers within the regulated areas wore half-face respirators with high-efficiency particulate air (HEPA) cartridges. 2. A local exhaust method was used during the cutting and removal of the transite material. The method used is described on Table I of this report. Texas Operations asbestos handling procedures must always be followed. The Texas Operations Asbestos Handbook and Safety Standard T-12 must be reviewed. These procedures are designed to make the transite removal jobs safe. If these procedures are not followed, a potentially serious exposure or safety situation may result. For this reason, the asbestos handling procedures must be reviewed, understood, and enforced by all personnel involved in the asbestos removal jobs. RESULTS AND DISCUSSION Table I shows the results of personnel monitoring during the cutting of holes in transite siding. The highest potential personnel measurement was .01 fibers per cubic centimeter, for the 35 minute job. Results showed that measured short-term concentrations were well below the OSHA STEL of 1.0 fibers per cubic centimeters for a thirty minute period. Table I also shows the result of area monitoring during the cutting and removal of transite. The area measurement was .005 fibers/cc, well below the OSHA PEL of 0.2 fibers/cc. The results clearly show that the potential for harmful exposure to asbestos during the cutting and removal of transite jobs is very low when local exhaust ventilation is used when glove bag or enclosures are not feasible. However, improvement is needed in IHS File Bl-3425 3 ASBESTOS MONITORING DURING TRANSITS MODIFICATION AT MACHZNB SHOP, B-103, DECEMBER, 1988 BT THX PLANT B CARPBNTBR8 RESULTS AND DX8CU88I0N (CONT') the asbestos handling procedures (i.e. pre-job meetings, ensuring job procedures are followed, etc.)* These procedures are designed to make the transite removal jobs safe. For this reason, the asbestos handling procedures must be reviewed, understood, and enforced by all personnel involved in the asbestos removal jobs. METHODOLOGY Asbestos samples were collected using Gilian HFS 513A and 113A air sampling pumps. A known volume of air was pulled through a 25 millimeter mixed cellulose ester membrane filter, 0.8 micron pore size. Samples were collected at a flow rate of approximately 2.0 liters per minute. The pumps were calibrated before and after the sampling, and the samples were counted by McKee Environmental Health Services using phase contrast microscopy. NIOSH method 7400 used. EVALUALTXON CRITERIA The evaluation of exposure levels was based on the following criterion: asm Asbestos EEP08URE GUIDELINE____ 0.2 fibers/cc (8-Hr.TWA) 1.0 fibers/cc (30 minute) SOURCE** OSHA (PEL) OSHA (STEL) ** OSHA (PEL) OSHA (STEL) Occupational Safety and Health Administration, Permissible Exposure Level Occupational Safety and Health Administration, Short Term Exposure Limit The OSHA (PEL) is the time-weighted average concentration for a normal 8-hour workday, 40-hour work week, to which nearly all workers may be repeatedly exposed without adverse health effects. The OSHA (STEL) is the excursion limit averaged over a thirty minute period. STOOI 5389 IHS File Bl-3425 TABXJI Z ASBESTOS MONITORIES DURING TBAHSZTB XODITICATIOH AT MACHXm SHOP, B-105, TBZA8 OPERATIONS DECEMBER 7, 19SS SAMPLE DATE MASTER NUMBER SAMPU TIME (min) VOLUME(L) SAMPU HUMBER CONCENTRATION (f/CC)TWA 12-7-88 202519 12-7-88 118761 35 31 12-7-88 (Area Sample) 44 66.5 62 88 RLW12788-3 RLW12788-4 RLW12788--2 .007 .01 .005 HOTEl 08HA STEL (30 MZM) 08HA PEL 1.0 0.2 The following job procedure was used: Two 2-5/8 inches holes were cut in a transite wall using an electric hand drill motor and cutting tool. The transite material and cutting tool were kept wet during the entire job. The wall was double sided with hallow section in center. One hole was cut on one side then the other. During the entire procedure a HEPA filtered vacuum was used in the immediate area of the cutting tool to remove any contamination. All the requirements in Section XI, tinder Transite and asbestos shingles cutting, drilling, or abrading minimum requirements were followed during the job. ST00I5390 P.'ld 61 9ST 00 I 53 1 JS #350 McKEE ENMRONMENTAL HEALTH SERVICES lUUS|{c|>uk Houston.TX77089 (7Ull48l-8fi0l December IS, 1966 LAB ANALYSIS REPORT Client: Test Performed: Dow Chemical, USA Attn: M.J. Sorrella Texas Division Freeport, TX 77541 B101Y NIOSH Analytical Method #7400 Fiber Counts (Asbestos) Sample Numberfieldsfibers TP-1 TP-2 TP-3 TP-4 TP-S TP-6 TP-7 TP-8 TP-9 TP-10 RLW12788-1 2 3 4 87200-1 2 3 4 B42-7 B42-8 B42-9 lOO lOO lOO 100 55 100 53 100 100 60 100 100 100 100 100 100 100 lOO 100 100 100 LT * less then K> 0 51 IS 0 102.5 10.5 102 5.5 31 100.5 1 2 2 3.5 8.5 6.5 .5 0 2.5 5 LT 0.6 64.97 19.11 LT 0.6 237.4 13.38 245.2 7 39.49 213.4 1.27 ^55 2.55 4.46 10.83 8.28 0.64 LT 0.6 3.18 6.37 37.58 / ,*/ A1(< ,! Iv a.\ Vm Ronald S. McKee Certified Industrial Hygienist c RECORD ess B-/OS- fY)a<a^e C SAMPLING METHODSJ-4, Iflow set uTY/a.a J Row RATE ' '"- /?6&S ***12-*-* TRAPPINC MEDIUM " ......... FLOW FACTOR ON STROKE count TIME TOTAL ,1% START STOP Q/ om c TOTAL LITERS AIR : " 0'A'i ^ . RAPPING HtDIUM ^ FACTR TIME TOTAL m, IO'Ma 3 iP'Zl*, ir: i bti/fe, CuJ~ &xJT ST00I5393 START 9:51 *\ yB? ywr*^ ~V STOP /0:3$*,, Mm TOTAL LITERS A1R1________ V 4.+. .fffcwwbspf /STf/ocr h*loixJjtt> bt>/Aj fW&vtxJ._______I__________ 00 --4 O O cn GO kD ro 9 -02Sf$ START STOP 9:&7a to:3zft. }1--------------------- n ^33m TOTAL LITERS AIR T --Tx------------------------------------------------------------------------------;--------- /yf 4tJO 3/7.* lick*. ^^oWv,AlVi|Ja(s.qkg. iiHv. 51 iG -^VIA flrUigr. VA.1> WepT. }/a. --i--gftMfraii 4? tidr. -rtf J<>ciL -----------huy-I^* <gerapfi;mrtLihftrf< ' DA TE: DATE: 1970 1974 05 FLOW 1973 1979 1986 1986 1987 FLOW 2828 2832 'A36 :8 2026 AVERAGE 1973 1976 1979 1981 1982 AVERAGE 2028 2838 2032 2831 2838 * SAMPLES 01 82 03 84 05 \ # SAMPLES \ 01 82 * 03 & 84 95 6ILI8RftT0* WtRSiOH 1.2 FLOW 12 2b*'/ 2012 AVERAGE 190.3 1095 1401 *"*" 92 83 idfJ FLOW 2003 2005 2805 2807 1999 AVERA6E 2003 2004 2804 2005 2004 1 SAMPLES 91 02 83 04 05 FLOW 1972 1292 -1292 1976 1977 1974 1978 AVERAGE 1972 1632 1972 1974 1975 1975 1975 * SA^F.Z ?! <SL -;3 ** FkJW 2988 2029 2008 2021 2028 AVERAGE 2888 2019 2015 2017 2817 jr. *</* 83 0* 95 flow average # samples ST00 I 5394 :PM 690 , }D - /Yl&-chir%. J\op t: -- K.5S~-f//rmz - bl&nC) Cl/UA~ 49-2.8 oivnu x y-y-ounqquuu______________ * ~ ^ ycc I. '__________________ *203519_________ f3 {as*-t-an) 4385 4Q28 ' (9ooyz5 ' (0(0600 ' . 007i-fL s ~ \*4 [Jf.4l.-iXT) Y38FT i&OO X3! * 'MU J338US' ~ <(,3000 - .Otft 1/ a.------------------------------------------------------------- ------------ -- l| [I STOOI 5395 -4- n ... .*