Document 7R3YjzwMGxkYjaegppOgmOXRg

TO: H. C. Gaffney FQtl:~-Gr AT'Ffctersen, M.D. ' _ }. 9 * J"'- 7 * CYWI 3-001129 N15283 tzvMMjimto To: H. C. Gaffney Location: Chicago From- C. A. Petersen, M.D. Location. Wayne Subiect: Reference: Date: Copy to: Nov. 30, 1978 R. M. Clyne, M.D. J. S. Tobin, M.D. Effective immediately the following medical surveillance program will be in effect for the Chicago Plant. Medical examinations are to be made available to all employees consistent with the final occupational exposure to lead standard as issued by OSHA on 11/4/78. Please note that physicals examinations will be given annually regardless of the employees age and blood lead levels will be taken on a monthly basis. The medical surveillance program will follow the requirements of the standard as noted in Paragraph "J", "3", "I" and "ii" Content, as found on page 53010. (A) A detailed work history and a medical history, with particular attention to past lead exposure (occupational and non-occupational), personal habits (smoking,-hygiene), and past gastrointestinal,.hematologic, renal .^cardi'evascular, reproductive and neurological problems; (B) A thorough physical examination, with particular attention to teeth, gums, hematologic, gastrointestinal, renal, cardiovascular, and neurological systems. Pulmonary status should be evaluated if respiratory protection will be used; (C) A blood pressure measurement; (D) A blood sample and analysis which detertni nes: (1) Blood lead level; (2) Hemoglobin'and hematocrit determin ations, red cell indices, and examination of peripheral smear morphology; (3) Zinc protoporphyrin; (4) Blood urea nitrogen, and, (5) Serum creatinine; (E) A routine urinalysis with microscopic examination; and (F) Any laboratory or other test which the examining physician deems' sound medical practice. NA 839 REV. 2-79 CAP/eob 2-79 CYWI 3-001130 L- - . .- -* V ^ ff? r>i 7 To i~ Z )~-H) // sr- 'TT^0 3-ooH31 c^1 N15283.01 Jv ^o V^ '&r ,, 1*7# 3 fo 3? J? 3^ jf /? *^ J? 7 a? JV ^ >7? Zr /< %A?r*' - ?<* ---------- --- ------- ----- L z> 7 ________ J* J' r ..._________ _ C^V. . J>" --......... ........ -- - ._. 2:^ ------- ... .. ..... -- 2/ ?/l) :V CYWI 3-001132 N15283.02 ^T^e- &isyr^' __m*?*&*-1. . *v*/^ *_ .^e^^dfedl ___ C^yu^^r-c^______________________ n__ d!3^i&-^r-^~_*^*-^ - CYWI 3-001133 N15283.03 CYANAMID `fich r To: Dr. M. D. Utidjian Location: Wayne From: H. C. Gaffney Location: Chicago Plant Extension: Subject: Reference: Date: July 24, 1985 Copy to: B. Coopersmith - NA At your plant visit and meeting with Dr. Falk on May 8th, it was agreed that Dr. Carnow would be contacted regarding th^feasability of chelation treatment for shift foreman even tho he shows no symptoms of lead intoxication. Has this matter been resolved yet? The September 1st deadline is rapidly approaching. HCG:ck NA 839 REV. 4-82 4-82 CONFIDENTIAL INFORMATION REDACTED CYWI 3-001134 NI5283.04 CYWI 3-001135 N15283.05 -^24vt^v & ?AyyS~- -~v-^ _*s-eC ___ ^&<L, ?& <riUs~><t4^^L<r >**1-------<sf`? - -----/3 at&^xyy- s~%- --r r,, t ' S' 2-3t44L~z___ ?/2rS& y *C- 3-OOH36 q YWI & CYA/VAM/D To: B. Cooper smith Location: Wayne From: H. C. Gaffney Location: Chicago Plant Extension: Subject: Reference: Blood Lead Date: April 19, 1985 Copy to: J. Caporossi - NA C. Hellings - NA During Cliff Hellings visit this week we discussed the blood lead and ZPP level of (shift supervisor) His six month blood lead level is 52 and his Zinc Protopor phyrin level runs at 600-700. This indicates a very high body, burden and a possible health problem. Cliff and I agreed this matter should be reviewed with J. Caporossi and probably Dr. Utidjian with the possibility of recommendation of medical treatment. We are operating under a temporary variance (in effect until September, 1985) allowing us to keep employees with a six month blood standard at 50 or above in the work place. If we lose t! ce in September we most likely will have to remove from the manufacturing area. HCG:ck NA 839 REV. *-82 4-82 CYWI 3-001137 N15283.06