Document 7Q9zEeNoxdndqRpm5Db89VE6
Inspection and Control Procedures
c) Records, d) Packing and shipping, e) Employee training, /) Labeling, advertising, and sales litera
ture, and g) Product liability claims-handlmg pro
cedures
To give the proper degree of importance to this management decision, the philosophy on reliability should be written out and adopted as a policy for guidance
It naturally follows that communications must play a very important part in a product safety program and it must be recognized early in the program that everyone in the plant must be brought into the act Some companies have started such a program by means of a kick-off meeting so that all em ployees can be told of the importance of turn ing out a quality product that is safe
All employees must be informed and sold on the purpose of the program, which is to reduce to a minimum the number of rejects and to turn out a safe product
Zero defects programs.
In the early 1960's defense industries origi nated a number of programs called "zero de fects" (ZD) programs, with such interesting names as Pnde, Aware, Esky, Project Ster ling, Error-Free Performance, and others These are primarily quality control programs aimed at motivating greater attention to product quality They are not systems safety analysis programs m the strict sense Safety naturally should be improved but this is a secondary rather than a primary objective of these programs ZD programs are a conse
quence of the extremely high specifications now set for aerospace products
But regardless of the chosen name, the program should be widely publicized and continually promoted under the chosen name All should know that management is behind the program, not merely giving it lip service
Alerting management to product safety
In line with a comprehensive loss control program, the "all-around" safety director should be concerned about his company's making a safe product (at a satisfactory profit) This can be done by
1 Communicating to management, at staff meetings, the latest developments in adopting voluntary safety standards
2 Presenting evidence of suits won by users, and judgments paid by similar companies
3 Co-operating with company's design and process engineers, securing photos, draw ings, and other information
4 Working with other safety professionals and the National Safety Council to see what other companies and the industry are doing
The alert safetyman assists his firm's tech nical and engineering staff m every way to help avoid "tunnel vision" with respect to design safety, as well as manufacturing safety There have been many incredible errors and oversights in design, resulting in incalculable suffering and needless injury
The effective safety director or safetyman watches for opportunities to apply his knowl edge to product safety, as an important part of total loss prevention
References
Baxter, J D "Make It Safe or Be Sued," Iron Age (July 28, 1966) Bethlehem Steel Co , Bethlehem, Pa Our Next Step to Zero, "Instructor's Guide to Supervisors
Safetv Program," 1964 pp 122-133 Bird, Frank E and George L Germain Damage Control New York, N Y , American Manage
ment Assn , 1966 Heinnch, H W Industrial Accident Prevention, 4th ed New York, N Y , McGraw-Hill Book
Co,1959 Hopkins, Stuart K "Voluntary Standards at the Crossroads," National Safety News (April 1967) Johnson, W G System Development Chicago, National Safety Council, 1965
82