ALCOA
Engineering Standard
Civil 33.042
LABOR RELATIONS GUIDE FOR OUTSIDE CONTRACTORS AND SUBCONTRACTORS
1988 JANUARY PAGE 1
1. GENERAL
1.1 This is the labor relations guide for outside contractors and subcontractors vhen performing
work on the property of the Owner and its subsidiaries. The Contractor shall employ labor relations
practices which result in cost effectiveness for the Contractor and a decrease in total costs to the
Owner.
This guide does not relieve the Contractor of any responsibility and/or obligation to
conduct labor relations activities.
1.2 Good safety praetiees allow workmen to devote their productive effort to the work in progress.
Institute and
enforce an effective safety program in conformance with Standard 33.051, Accident
Prevention, Fire Protection, and Security Procedures for Outside Contractors and Subcontractors.
1.3 Owner and Contractor have a mutual interest in maintaining good working conditions. Section v (Site Conditions) of the Contract Specifications outline Owner's obligations and Contractor's responsibility in maintaining good working conditions.
1.4 This Standard covers general labor relations for all locations. Section V (Site Conditions) of the Contract Specifications covers modifications and amendments necessary due to local conditions.
1.5 Fill out end submit Form 33.042.1 , "Prequalification Questionnaire - Labor Relations* prior to or with bids for the work.
1.6 Use Form 33.042.2, "Foreman's Delay Survey" during the course of the work. Consult with Owner on the frequency of these surveys and make copies of surveys available to Owner. A supply of these forms is available from Owner.
1.7 Owner will use Form 33.042.3, "Labor Relations Evaluation of Outside Contractors and
Subcontractors," during the progress of the work to evaluate the Contractor's labor relations
performance.
Copies of reports will be sent to the Owner's Construction Management Department.
Cooperate with the Owner in these evaluations.
2. CONTRACT REQUIREMENTS
21 Immediately notify Owner of: (1) demands for collective bargaining (under the provisions of the Labor-Management Relations Act (LMRA), as amended) made on the Contractor or any of his subcontractors by any labor organisation and (2) labor disputes which might affect performance or the cost of the work.
2.2 In the event a labor dispute threatens to affect the performance or cost of the work. Owner reserves the right to restrict Contractor's hiring of employees, to suspend or discontinue Contractor's work, or to terminate this Contract. This may apply whether or not the Contractor or any subcontractor is directly involved in the labor dispute.
2.3 Owner will reimburse the Contractor for reasonable out-of-pocket costs and expenses resulting from the Owner's exercise of rights described in Section 2.2 above. Owner will not compensate for loss of anticipated profits. Termination of Contract as described in Section 2.2 above is termination at the Owner's convenience per the General Conditions.
2.4 Do not, without Owner's consent, invoke any international agreemant against any local construction trade union when that local union's contract with the local Contractors' Association has sxpired or the union has stopped work.
2.5 Abide by labor agreements between the local contractors' association and local construction trade unions which may affect the work or its costs. Contractor should take advantage of special conditions offered in national agreements, local project agreements and ether applicable special agreements for reduced construction costs.
2.6 Make no agreements with local unions independent of those Contractors' Association and the unions without the Owner's approval.
existing
between
the local
2.7 The term "local Contractors' Association" means any association that bargains with the local construction trade unions on behalf of construction contractors concerning terms and conditions of employment for construction labor.
2 . 8 If the vork is delayed by strikes by employees of the Contractor or his subcontractors, the time for completion may be extended per the General Conditions.
o r (.o<** m >i'>lr r.
Any o Ms i o h v r l i . t n r .
fil
'**) it t ilMt
i-tl
M 'prcxliir A lu m in u m
* M u r fm iu m
I
"
l.i '<.*!
^
*f s It h^hatl r* o t^ n
I p iw rri.s v n n
i,n * 'l ,,n
1 iSC<1 o n
\ i n t lA n f H Jl>i*
ARD 007751
3
ALCOA
Engineering Standard
Civil 33.042
Ilf
:s*i
If*!
r <; b BJS|
-.|SS O * ^
i?
ill* *01 C- ?' XC-
1fi?tJsc
SUV 1*1 is?4, 5?
r r *-` oc -i rs. ;-t:'v
;; ;I -9 !:r
LABOR RELATIONS GUIDE FOR OUTSIDE CONTRACTORS AND SUBCONTRACTORS
1988 JANUARY PAGE 3
7. LABOR MOTIVATION
7 . 1 If requested, actively participate in, and provide representation to, any Site Labor Motivation Steering Committee set up by the Owner or other contractors. (Reference Business Roundtable Construction Industry Cost Effectiveness Project --Report A-2)
8. SUPERVISORY TRAINING
6.1 Insure that supervisory personnel take advantage of training, educational, or orientation programs available in the area. Should such programs be developed by Owner for this project, they will be available to the Contractor. (Reference -- Business Roundtable Construction Industry Cost Effectiveness Project - Report A-4)
9. INEFFICIENT WORK PRACTICES
9.1 Form 11.042.3 lists a number of inefficient work practices common to the construction industry. Owner will periodically check whether the Contractor permits these practices. If observed, take steps to insure the practice(s) does not reoccur.
10. USE OF PREFABRICATED MATERIALS
10.1 Install prefabricated or preassembled equipment when specified or purchased by Owner, regardless of the place of fabrication and without unnecessary change or rework. If Contractor prefabricates or preassembles material furnished under the Contract, these materials shall be installed without unnecessary change or rework.
11. PICKETING
11.1 In the event the Contractor's or other contractors' employees picket the site entrance, cooperate with the Owner and other contractors in establishing and operating separate entrances for nonstriking employees.
12. MERIT SHOP
12.1 If required, Owner will arrange for a separate, designated entrance for union contractors on Merit Shop Projects.
ARD 007752
t,i |h*v fnn:r0(.'s nmces^ev poduru o ' procedures d e w -b e d o fecomended he'em
(uiV,V>UfS fp'<vnU liO M . P*MJ O' im plied .v * made M lo the u tilitie s O'
O 'h** lh * n A'CO* No w *n tie v
and t* nr.J ' -.V \1 Id * * feenmm*ndAlM>h l0 r<y
T h u e h C '" * * '* ^ V a n 0 fd I* provided e o le lf fO* IPS pu'f>0 e 0 * (JlCk)iOfl A'eOA't *0 0 *0 * C*
ALCOA
Standard
PREQUALIFICATION QUESTIONNAIRE -- LABOR RELATIONS
REQUISITION/PURCHASE ORDER NO SPECIFICATIONS FOR CONTRACTOR'S NAME
ADDRESS
LABOR RELATIONS
1. What is your currant amploymant laval? Managamant/Enginaaring Ganaral Foranan/Suparintandant Foraman Craftsman Apprantica/Subjournayman Total Hours Workad Last Yaar Total Ovartima Hours Last Yaar
Farmanant
0civil 33.042.1
1988 JANUARY PAGE 1
WORKS
DATE
Temporary
2. List tha subjacts covered in your formal training program for locally hirad foraman and/or ganaral foraman. .
What is your prima sourca of locally hirad foraman and ganaral foraman othar than Union Hall?
3. List tha local training programs for appranticas and/or subjournayman and axplain your support, if othar than financial.
4. Do you maintain racords to allow avaluation of your fiald work forca productivity on your
projacts?
If yas, dascriba
S. Do you hava any formal or informal incantiva program to racognita afficiant work practicas on tha part of your suparvision and/or craftsman? Yas _____________ No ___________ If yas, plaasa axplain.
6. Do you hava a labor motivation program in affact on your projacts? 11 yas, axplain
Yes
No
1 h .* < l< n iU i0 (he P'O0 * H y o ' A lu m in u m C o"npnjr o ' A m rt.c * M m u M M u 'n (J o n *O u M ' M Sh*U nr.1 h * prortu'.<rO O* ropM?1 w ho'O O' m ir t O' y *e *t on b " * * ! ' o ' 0 'h$ Ih a n A tu ^ 'n u rn cn < "|i n y 01 <*v < iib iid *A n r> *
'!'<oui p n ^ iu io n
ARD 007753
0
ALCOA
Engineering Standard
civil 33.042.1
PREQUALIFICATION QUESTIONNAIRE -- LABOR RELATIONS
1988 JANUARY PAGE 2
7. List the construction trade unions with which you and/or your bargaining group have signed local or national agreements.
Union
Location
6. List tha Local and National Contractors' Associations in which you hava membership and dascriba your participation.
Association
Location
Participation
9. List any local Usars Groups in which you maintain associata membership?
10. List tha following information concarning your cosipany labor ralations manager. Name __Title
Telephone Number
ARD 007754
Thu e f^n e e fin fl standard it provided softly lor the purpose Ol disclosing Ateoes approach
and is not -nt acd lo be a recommendation for any recipient other than Alcoa No warranties Guarantees < representations, evpress or impfted sre made as to the utilities or effectiveness ot the me'nodc processes, products or procedures described Or recomended herein
0
ALCOA
Engineering Standard
FOREMAN'S DELAY SURVEY
i
Civil 33.042.2
1988 JANUARY PAGE 1
CONTRACTOR:
CRATT:
NAME OF FOREMAN:
GENERAL FOREMAN:
(DATE) DAILY EVALUATION:
NUMBER IN CREW:
l.o.
PROBLEMS CAUSING DELAY
_____________________MAN-HOURS LOST
Number
Of Number
Hours x
of Mon
Waiting for materials (warehouse)
_____________
_____________
1. b. Waiting for matariala (not rocoivad or not ordered
_____________
_____________
2. Waiting for tools or tools not available
_____________
_____________
3. Waiting for equipment
_____________
_____________
4. Equipment breakdowns
_____________
_____________
5. a.
Changas/radoing work (design errors)
_____________
_____________
5.b.
Changas/radoing work (profabrication errors)
_____________
_____________
5. c. Changas/radoing work (field errors)
_____________
_____________
6. Move to other work area
_____________
_____________
7. Waiting for information
_____________
_____________
8. Intarfaranca with other craws
_____________
_____________
9. Overcrowded working araas
_____________
_____________
10.
Plant coordination/authorizations
_____________
_____________
11.
Other ______________________________________________
COMMENTS:
_____
_____________
Man-Hours
I h t j s u n o a 'ti is the property o Alum inum Company ot Am t..a and m ul
be relum ed on ico o csi It shall not b' reproduced or copied m whole or n part or used on behalf of others than Alum inum company or its subsidiaries. without permission