Document 7Orqneb3QY07zYzrL3wXnm2oe

- /) PLANT MANAGER'S SAFETY BOARD MINUTES OF MEETING MAY 17, 1978 Present: G. W. Bostick P. E. Brubaker J. E. Clark G. A. Danner J. Townsend (for Daues) W. C. Fuller J. A. Glass H. Nelson (for Lane) P. Payne (for Martini) G. E. Small C. M. McCullough D. W. Metten G. T. Ryan H. Lacy (for Trafton) W. H. Triplett 1. REVIEW OF STATISTICS TEXAS CITY SAFETY PERFORMANCE SUMMARY APRIL 1978 TOTAL INJURY CASES 1977 1978 MTD YTD MTD YTD 29 184 19 100 RECORDABLE CASES 1977 MTD YTD SC 14074 1978 MTD YTD (a) INJURIES WITHOUT LOST WORK DAYS (medical treatment only) (b) LOST WORKDAYS CASES **B1 RESTRICTED ACTIVITY **b2 days away from work cases (c) FATALITIES 0 0 0 0 0 3 2 1 1 0 28 03 02 01 0 *TOTAL RECORDABLE CASES 0 5 2 11 * A+B+C = TOTAL RECORDABLE INJURIES ** Bi + B2 = (B) TOTAL LOST WORKDAY CASES INJURY RATES PER 200,000 MANHOURS STG 2430919 1977 MTD YTD 1978 MTD YTD April YTD 1978 MCIC TIR - TOTAL INJURY RATE 20.93 RIR - RECORDABLE INJURY RATE 0 TLWR - TOTAL LOST WORKDAY CASE RATE 0 DAWR-DAYS AWAY FROM WORK CASE RATE 0 TLWR TARGET: 1.45 14.82 .88 .35 .18 13.62 1.43 0 0 (1/2 CHEM . IND. 17.52 1.93 .53 .18 AVG.) - 2.35 .96 .43 LAM015863 '1 PMSB Minutes - 5/17/78 Page 2 2. PLANT MANAGER'S COMMENTS Phil Brubaker stated that he had received a memo from Earl Brasfield expressing his concern about the increasing number of incidents at our plants which are resulting in injuries, time lost from work, and other near misses. Phil said that Earl was sending Bob Flint to the major MCI plants for a one-to-two day in-depth discussion of safety performance problems, action plans and corrective actions. Bob's visit will be announced as soon as arrangements have been completed. 3. OLD BUSINESS a. Guards for Smooth Rotating Shafts -- Ryan The Safety Advisory Committee recommended and the Plant Manager's Safety Board approved the safety practice which states that guards should be installed over smooth rotat ing shafts exposed between pump bearing brackets and stuffing boxes. Pump stuffing box splash guards used on hazardous and corrosive chemicals are satisfactory under the policy as guards for smooth rotating shafts. b. Railroad Lighting -- McCullough Work is in progress for defining the project to provide improved lighting at railroad crossings to reduce traffic and pedestrian exposure through improved visibility of railroad switching operations. c. Basic Safety Training for Foremen -- Glass The initial basic safety training session has been held and follow-up additional sessions are scheduled to be resumed in June. d. Job Safety Audits/Job Hazard Analysis -- Glass Several training sessions of unit safety promotion teams have been trained on the job hazard analysis technique. The teams have been trained to provide training and follow up on job safety analysis in their own operating areas. This training will be continuing through the summer and will be utilized in the operating areas as appropriate thereafter. e. Critical Reviews -- Glass STG 2430920 A listing of critical reviews has been prepared by Materials and Mechanical Technology. Some additional manpower has been assigned to the project for defining and scheduling the critical reviews to be made. The Plant Manager requested that each member of the Board submit a memo stating the status of their inspections of tanks and rotating equipment checks. SC 14075 LAW1015864 PMSB Minutes - 5/17/78 Page 3 f. Property Loss Incident Notification and Reporting -- Metten A review of the status of this item showed that the P-Bulletin had been issued and information and training sessions were being developed between Safety and Accounting, scheduling of these meetings pending clarification of the minimum loss value to be reported. Target date for these sessions will be sometime this summer. g. Superhazardous Fluid P-Bulletin -- Trafton The proposed P-Bulletin has been circulated and a number of comments have been received. These are being reviewed and are expected to be resolved prior to the next meeting of the Plant Manager1s Safety Board. 4. REPORT OF SAFETY ADVISORY COMMITTEE (SAC) -- G. T. Ryan Application of Ground Fault Circuit Interrupters The SAC Committee reviewed the recommendations of the committee assigned to study the need for use of Ground Fault Circuit Interrupters (GFCI) in various areas throughout the plant. Mike McCullough reviewed the principles and applications and recommended approval of recommendations submitted by the committee. The PMSB approved the recommendation. A copy of "GFCI Recommen dations" is attached. (Appendix A) In addition Plant Engineering: 1) will review specific applications with each manufacturing area responsibility 2) will work in conjunction with CED in off-site and construc tion requirements 3) will develop outline of total program and review or circu late to PMSB 4) will commence orderly installations after all of the above 5) will develop "P" bulletin after program tests are underway. 5. REPORT OF SAFETY ADVISORY COMMITTEE (SHAC) -- Triplett a. Emergency Procedure Plan Test Emergency procedure proposed date - J. A. Martin The SHAC Committee proposed that a test of the Emergency Procedure Plan be conducted during the month of June and an outline of the procedures to be used was submitted for PMSB review. The Board approved the plan (Appendix B) with the following suggested changes. SC 14076 STG 2430921 LAM015865 'I PMSB Minutes - 5/17//8 Page 4 1) The date of the drill has been set for June 20, 1978. 2) A notice about the drill should be placed in the local newspapers. 3) The Texas City Fire and Police Departments and local press should be notified in advance of our plans to avoid any alarm to the community. b. 1978 Annual Housekeeping Inspection Listed below are the committees, their duties and chairmen for the 1978 annual housekeeping inspection. SHAC will be contacting members of the PMSB for people to serve on these various committees. Subcommittee Duties Chairman Pre-inspections 1. Area Inspections 2. Personnel Involvement 3. 1977 Inspection Followup D. R. Wise Annual Inspection 1. Route 2. Timing 3. Tour Guides 4. Team Structure 5. Personal Needs 6. Transportation during Inspection 7. Inspection Format J. Townsend Inspection Brochure 1. Inspection Publicity 2. Brochures Design, Format, Content 3. Distribution 4. Inspection Booklet J. A. Jones Inspector Arrangements 1. Hotel Accommodations J. A. Martin 2. Travel Arrangements 3. Gifts 4. Inspector Information for Paper 5. Information Packets Theme Entertainment SC 14077 1. Plant Involvement & Promotion 2. Displays and Presentations 3. Data Research 1. Evening Arrangements 2. Guest List 3. Special Recognition 4. Lunch Arrangements J. A. Glass i W. H. Triplett STG 2430922 LA M015866 ) PMSB Minutes - 5/17/78 Page 5 The Plant Manager requested the preparation of a report on their accomplishments and/or status of recommendations made by last year's inspection team. This report should be prepared in advance so it can be received by the inspection team members prior to their visit to the plant. c. Hourly Safety Committee Meeting A question was raised concerning the operation of the newly revised Hourly Safety Committee and the minutes distributed by that group. Joe Clark will meet with the management group that meets representatives to resolve the concerns of the Plant Manager's Safety Board. d. OSHA Inspection for Contractor Asbestos Handling We have had two visits to J. A. Jones Construction from OSHA regarding proper handling of asbestos. The members of PMSB were urged to become particularly alert to the asbestos handling requirements so that we can maintain compliance with the OSHA standard for work being done in the plant. Copies of the asbestos handling procedures developed by Plant Engineering will be distributed by LP&S to members of the PMSB. A contract employee has been terminated for failure to follow instructions necessary to comply with proper asbestos handling procedures. We are monitoring asbestos work closely with our field inspectors as an added measure to insure compliance. 6. REVIEW OF INCIDENTS a. 4/2/78 b. 4/14/78 c. 4/19/78 d. 5/4/78 Benzene Leaking into North Ditch -- Fuller Alkylation Spill -- Fuller Incident - Pipefitter Twisted Right Ankle 1-- McCullough Condensate Contamination Incident -- Ryan 7. PROPOSED P-BULLETIN P-0139 INSPECTION OF STEAM CONDENSATE TANKS (JAG memo May 2, 1978 to PMSB with Second Draft Attached) -- Glass Many comments and questions were raised and these will be resolved as appropriate within the framework fo the OSHA agreement. Target date for completion is prior to next PMSB meeting. 8. EMERGENCY HEADCOUNT ACCOUNTING PROCEDURE -- Bostick A proposal for emergency headcount accounting was described by George Bostick. The PMSB took no action pending further demonstration of justification for the development of such a computerized procedure. A test of the emergency procedure plant personnel accounting may provide some indication of need for this in the future. SC 14078 STG 2430923 LAM015867 PMSB Minutes - 5/17/78 Page 6 9. CIVIL DEFENSE "HURRICANE HELEN" EXERCISE -- Daues Greg Daues reviewed the results of the Gulf Coast Area Civil Defense "Hurricane Helen" preparedness test held on Friday, May 12. This was primarily a communications network test using hurricane conditions. The local IMA network was used for communications, "problem situations" were developed in the EPP Room and submitted to the City for actions they would take if these conditions truly existed. Shutdown actions and release of people were simulated and records of actions were recorded. A summary report of the test was issued to members of PMSB. An additional test may be conducted in July. vf 6/1/68 Attachments J. A. Glass ' SC 14079 STG 2430924 LAM015868 i GFCI RECOMMENDATIONS Appendix A PAGE 1 A. Operating Units and Offsites 1. Continue to maintain present grounding systems. These systems provide the primary protection from electrical shock to personnel. 2. Provide additional personnel protection for the individual at the job s:*e through the use of portable GFCI protected extension cord sets (Hubbell-Spider type). a. These devices will require a fire permit for use because of the standard receptacle used in their construction. Most equip ment using these GFCI devices also require fire permits. b. A Class I Division I GFCI portable is avail able for special application but not general use. 3. All circuits within an operating unit will not be protected because of the number of nuisance trips and extremely high installation costs. GFCI is for personnel protection and can best be handled through portable GFCI devices at the job site. B. Labs, Research, Field and Analyzer Houses 1. Provide additional GFCI protection for receptacles located around sinks, metal bench tops, grounded pipes and other grounded equipment. This will provide protection for in dividuals who could easily be in contact with energized equipment and a ground. The electrical ground for equip ment is still the primary means of protection against electrical shock. A4080 SC a. Present GFCI protection in Research meets this criteria and is being extended to the field labs and cafeteria. b. The control circuits and electrical power for bench units in Research can't be GFCI pro tected because of nuisance trips. STG 2430925 LAM015869 Appendix A Page 2 c. Protected receptacles will be identified with a painted green dot. 2. Receptacles in analyzer house will be protected using the same guidelines as the labs. On-line analyzers should not be protected because of nuisance trips. C. Office Buildings 1. Receptacles around sinks and restrooms should have indi vidual receptacle protection. 2. Janitors using floor cleaning equipment should use port able GFCI protected extension cord sets. 3. Ordinary office machines do not need GFCI protection. D. Maintenance Shops 1. Continue to maintain present grounding system. These systems provide the primary protection from electrical shock to personnel. 2. Provide additional protection by installing GFCI protec tion for receptacles in central and field maintenance shops where electrical equipment is operated in wet conditions. 3. New maintenance shops should use GFCI for all re ceptacles. E. Other Recommendations 1. In addition, the group feels the 20 ma. GFC I devices should not be used for personnel protection, only the 5 ma. GFCI should be used at this location. kb/ 2. Equipment grounding should be checked as a part of a PM procedure. These items are being included as a part of the PM system for rotating equipment and elec trical systems initiated in AN-5, Methanol, Acetic, and P.A, During the first quarter of this year receptacle grounding and polarity was checked plant wide as a pare of an Elecrtical OSHA compliance survey of all opera ting departments. "--------f"/ SC 14081 Paul Saunders i (9 ce LAM015870 2 4 3 q926 Monsanto 4 lOCATIQNI ) J. A. Martin - Texas City, Texas OA-2 I H I UMUA A V Page 1 DAl suiitcr May 17, 1978 " EMERGENCY PROCEDURES PROPOSED DRILL' SHAC Committee TO Plant Manager's Safety Board The attached outline proposes a plantwide drill on the "Major Unwarned Emergency" procedure to provide these desired effects: 1. Increased awareness among plant personnel of the need for emergency action planning. 2. Highlight the "Major Unwarned Emergency" procedures. 3. More communications between supervisors and their subordinates concerning emergency procedures. 4. Develop confidence in our procedures. | 5. Increased knowledge of each individual about their appropriate action. 6. An up-to-date assessment of how well plant personnel understand existing procedures. 7. Discover weaknesses. 8. Communications with contractors about emergency procedures. 9. An "overall" positive result. SC 14082 xP Martin For SHAC Committee tg Attachment STG 2430927 LAM015871 OUTLINE FOR PROPOSED DRILL OK EMERGENCY PROCEDURES Appendix B Page 2 I. PREPARATION A. Develop and issue to all plant personnel a bulletin detailing drill activities. 1. The week that drill will occur. 2. Will use Major Unwarned section of procedures. .3. The Control Center will be activated. 4 All personnel will perform their assigned actions with majority simply reporting to instruction points and signing in. 5. Unit/Craft safety teams in the plant will observe response in their areas and provide followup inputs to their supervisors. B. Develop and issue notice to all contractors alerting them to drill and their assigned action of reporting to the nearest instruction point. C. Wardens and Instruction Point Leaders will be provided copies of the Emergency Procedures pamphlet to hand out as part of sign in. >- D. A hypothetical situation will be developed for presentation to the Control Center Staff for analysis with directives carried out only by Wardens' group for feedback. II. EXECUTION A. Activiate emergency alarm. B. Control Center activated. C. Personnel reporting to instruction points sign in with leaders, receive pamphlet and are dismissed. D. Control Center Staff receives hypothetical situations, decides action needed, directs Wardens to walk through evacuation routes, and feed information back. 5-17-78 SC 14083 STG 2430928 LAM015872 1 Outline for Proposed Drill on Emergency Procedures - cont'd. Appendix B Page 3 Ill. Followup A. Unit/Craft Safety Teams meet and analyze drill actions in their units. B. Instruction Point Leaders analyze response of personnel in their assigned areas. >' C. Summary of above used to assess current preparedness and identify weaknesses. I JAM: tg - 5-17-78 sc 14084 STG 2430929 LAM015873