SUBJECT Exxon Lexington
& SE FIELD REPORT
. REPORT NOPAGE
r.TTST Newport News Shipbuilding & Dry Dock Company________
EQUIP Feed Pump Drive_________________________________;______________
fsr 339M1713
CONTR. NO.
T T. Gusek
o MDTD Fitchburg. Mass.
L,A. Crowell cc:_
I..arrived at Newport News Shipyard Tuesday moring (7/16/74)...for..the continuation of
il and..13 feed pump drive overhaul on the Exxon Lexington. When I arrived aboard the vessel
ft3.. rotor was ready to be lowered into the casing ftl. rotor was on the way back to the yessel
froro....th.O..ftbipyayd shop where it .had. been apparently balanced and had the jonrnals built up. ... The. turbine rotors were awaiting an A.B.S. inspection. The job quarterman, Mr. Cassel contacted the A.B.S, personnel and they declined to in spect the rotors, the same quarterman
then requested I make a visual inspection which I did. I observed no apparent damage on unit. #1 rotor; I did observe that the 1st stage on the rotor of #3 unit had been damaged. ^ After..further investigatipn I found this..had been previously reported..in FSR # 339T299 in.......
May 1966 by Mr, C#A...Driscpli,a..G.E, field engineer.
TURBINE. 1 1 S/N..126191........ ... ...... ............ .................. ............ ...... ...... . ....... I replaced, the..journal bearing inserts on #1..and #2 bearings,..replayed the active thrust,
replaced all carbon packing....... I observed that the intermediate nozzle segments had been y
placed in the machine backwards; we turned them around and assembled them correctly...... I............
then, put... rotor. in .and started taking clearance measurement....I found.. the..thrust.. had excessiye rj.e.a.t^pce approx. ,PI8". The distance between the thrust runout was also excessive Ttv
rotor was removed to the shop, where the active thrust runner was moved approx. *015 towards
the low pressure end of the rotor. At this time both thrust runners were machined to obtain
parraiielism within .000%". The rotor was then brought back to the vessel where it was.................
iti.g.taH.6 Also the spacers on the intermediate nozzle segments were found to be too short,....
(.800) I had new spacers made up that were .825. Final clearance data on this machine is
on page 4... of...this report.... .. ........ ... .... ... .. ...... ..... ... .......... ...... ..................... ................. ........ .... ....... ........................... ......
The upper half turbine casing was..cleaned and stoned along with the lower horizontal
Thomas Dunn
SIGNED
Newport News, Va
LOCATION
8/74
DATE
Af-239 (5 shts) (I -68) rev Printed 9-72
GENERAL
ELECTRIC
PRODUCT DEpT. COPY EXX-MOR-002721
FIELD SERVICE REPORT
(CONTINUATION)
Department
FSR - 339M1713
PAGE NO.
2
--4
joint. The threads in the lower casing in the fwd left hand comer bolt hole had been
stripped, tapped outtoversize on a hexicoil had been placed in this hole I then reassembled
t-he tun easing halves using compltite on the horizontal joint._______________________________________________
I then made up the //2 bearing and the //I bearing bracket cover, I did a coupling alignment
check on the machine and found it to be out of alignment. I recommended to the Chief Eng'r
ef the vessel and the Port Enc*r that the alignment be corrected;, they rejected this reccrmmen- . .
''
V;' '
I'
Tlft&INE #3 S/N 126192 , T replaced the journal bearing inserts on #1 and #2 bearings, replaced the active thrust
and-replaced all carbon packing. The rotor was placed in the lower casing and the clearance
me a anreman 1-b are on page 3of this report. The horizontal joints of the turbine casing were
-
cleaned and nt-nned- Tt ga reassembled using copeltlte on the horizontal joint. I then made -__ _
lip -ft? hear-l ng and' rhe #l~hearlng bracket cover* f did a coupling aligoment ctieck oh thiB
machjne. and found jt to be hut of alignments I recongnehded to the Chief Eng*r that the alifthadflt
he cnrrpei-pH; he aian rejected this recommendation,, .Both .machines had their oil_pumps cleaned
and replaced uT fh near tvll .-------------------------------!---- '------------------------------------------------------------------------------------------------------J--------