Document 7OkaB2Lwwk57Y0Xe7V8x4gRMj

Monsanto T.W. Dalton > H G K. P.B. Hodges - St.Louis sWtUnibor, 1970 ityport Opt'ritlon D.B. Hosmer - St.Louis W.B. Papageorge- " PM/Sfc E.V. Weekes - Brussels TO J.F.Q. H.L.Williams - Anniston D B. Shearn - Newport *--~*iEroova d ArotfTorWfranH-PTgnt ,Eff p,~,(.<..b \Inzsrtaxl:ls~ti5on^=O-f--sump--l-e-v--e-l --ala-rm--s---now--c-o--m-p--le-t-e-T-^')- P.C.B'S in the Newport Plant effluent between 1st September and 5th October ranged from 20 to 932 ppb. There were three high results of 2],998 ppb, 81,039 and 3,095 ppm. The highest of these coincides wi;th leaks from the Santotherm pumps on 4NDPA plant. Excluding the three high results the average figure is 246 ppb. 246 ppb of PCB is equivalent to approximately 2,46 lbs/day. Informal ion has been requested from Anniston on trials using tcarbon tread ent for removal of Aroclors from waste effluent. <3--....... . . ij)s A bundeitt area draining into a closed drum has been installed around the 8antotherm pumps on the 4NDPA plant. Modifications are in hand to iitnprove the drainage from this area. r T.S.D. Progress Report No. 2 on Job No. 27/7139/2392 was issued on 15th Octo!>per giving results obtained to date on sampling of plant atmoapb1eres for P.C.B. contamination. Results arei- ftSSfi- 1. Drumraih'<3 .2 Chloriniat ion (ground floor) 3. Santoluibe 900 4. 4NDPA (Expans ion tank) PCB rog/m air 0.38 0.59 0.13 0.23 0.94 Pract. Nil Comments Indoors. 2 roller doors oper Enclosed area, large roller door open. Indoors, Normal process cond. outdoors. Outdoors - continued - ans 099034 3- Area PCB mc/m3 Air 5. Aroclor control room .6 Chlorirvation (first floor) 7. Airblowing room 0.2B 0.12 0.19 0.12 0.39 Commenta Indoors Chlorinators shutdown. Chlorinators operating Indoors. Normal process conditions. used Drum Disposal Blagdeijs drum reconditioning plant at Barking in Essex visited to see a trial to recondition used Aroclor drums. A full report on this trial will be issued in next few days. F jsM. MOWS 099035