Summery
AUGUST 1970
cootident^al'
ad^and de strov
X----
South Second St.
Other Locations 7. Macdonald -
Newport T. V. Dalton -
WGX
Raoul story Action
In early August, the Alabama Watar Improvement Commission informed the plant that EDA had fuxnishsd than with fish flash analyses from samples taken in tha Chocoolocco-Coosa River Watershed, Indicating appreciable lavala of Aroclor as wall as DDT metabolite*. Mercury va* also prasant at low levels. Tha plant's pravioua informational contacts with AKIC had praparad than for receiving this naws. Due to a high level of public concern about a ban on fishing in scsoa stats stream* having high narcury lavsl, an intansiva program vu started irsoediately to correct ronaining major Aroclor discharges. This program will be discussed with iMZC in September,
Current Laval
Aroclor losses during August increased to a level of 7280 ppb in plane affluent, equal to 68_ l/day. This increase corresponds to high turbidity of tha affluent from linestona inert utarial aa tha settling capacity of the final acid treatment pit has datarioratad since last clean-out. Process raaaarch studies indicate that removal of aolida will result in removal of Aroclor.
Plant Effluent Suspended Aroclor Control
Tha Aroclor department amap was put into service on August 12, three weeks ahead of target, and is controlling at the 100 ppb level in department effluent waters. Second phase is being separated and a high-Aroclor scum is being col lected on sump surface. An experimental mechanical skimmer will be installed in Saptaaber for evaluation in removal of this scumj tests with polyalactrolltas in agglomerating this scum wars not productive.
HONS 033880
TUi jastiasH <*ss*eUe <*W14eM*f
4a>s
w4 ( awe
CONE)GENITAL INFORMATION
etlU U IW ^m**< MseilWa
Oeig W*K
(me Wms. Tie i spa i **se awt is (H
He
*4 N* 4ea*aK( F*e*e* 1* erStfca4 ae{<am e<vei mm4
*^a SslWNit^ lansUal is iis*e<ws lw N| ufe teas'**. nssre'lM ** illwelu 4mJsUh
It*
4~4 W tts |nss> 4<***~* Tie Ve<*
w~tU. M. m^eeewet s
Ce^saas
i-M,N *
*|)Wla M swlis I* t*a *etU. MS*fl * ** ssta>(M<i* ** ad
' i*1s< nr^ "
HARTOLDMONO017910
2.
final Effluent Trotntnt
July end Aug-uet samples from Aroclor saurcti indicated that the final neutralization pit i now a major remaining aourca of plant effluent levels. Previous practice in pit cleanout has not been adequate to reccve accumulated material, and limestone inert aollda apparently arB an effective adsorbent in the pit environment. A two phase program baled on theie facta i* undarwayi 1) a second, uncontaminated pit will be put into service by nid-Ssptenber to permit shutdown and decontamina tion of the permanent pit and to develop procedure* for alternate operation al anrmfar without loss of nsutralliatioh or solids-settling capability. Concurrently, gross introductions of Aroclor into the sewer system are being stopped with the Aroclor department sump, now operating and house keeping procedures, and cleanout of potential collection points in the sewer system. Thi* program i* targeted for mid-September completion end should reduce plant effluent to the 200-300 ppb level that is seen in source point water phase analyses. An initial reduction in water use loo gpra out of 700 ypm has been accomplished through a checkoff list.
2) Longer term, insnediate steps are being taken to develop feasibility a.-.d costs of effluent solids-Aroclor reduction through continuous coagulation and clarification. Major vandors in the watar treating field are being consulted with a final proposal targeted for December 1. Sim projects for water reduction and improved housekeeping are underway and are being ex pedited.
1. Installation of concrete pads and curbs in major spill areas to replace chat.
2. Reuse water in Aroclor department still jets and blow-tank scrubbers (reduce water-ArOelor contact target - 100 gpo) .
3. Reuse water in Muriatic Acid department fume scrubbers and absorber final scrubber and divert acid sever through Aroclor department sump. (Reduce watsr-Arocior contact target - 100 gpm) .
4. Upgrade HC1 off-gas organics removal system to improve efficiency.
5. Provide a collection system for carbon tower apent carbon to
prevent spills to sewer.
6. Further watar reductions by rerouting Parechion phosphoric acid wastes
Bulk Waste Disposal
Data has been gathered on all eolid materials to be collected and disposed of. This data has been reviewed and will serve as the basis for scoping a col lection ays tern and incinerator. A report will bo Issued in September on the use of fuel oil to dilute Hon tax for improvements in handling and pumping for incineration.