Document 7O7r6NDqG5R4Q8pn6neD4EX36

..-ysler Cor;on. m CbMdoe. Division Trenicn, Michigan DATA 5I!ST EXHIBIT CHR-75 5anr>le Ho.____ Location and remarks Millions of Particles .or cu. ft. of air finraSUKlL______ _____ 5*o_ 1 Breathing cone - loading press for 5.7 disc brake pud 2 Breathing sene - weighing asbestoe 4.0 six for the dlso brake pad 3 Breathing zone - operator of the 4.1 machine grinder disc brake pad - Beejley double grinder 4 Breathing sene - Inspector at the 4.0 Beasley double grinder for the dlso pad 5 Breathing sons - operator of the 3.0 brake lining grinder at AI>-6 6 Breathing zone of the forming 4.6 operator before curing of the brake lining at Boy 5C 7 Breathing sone - Inspector on the 1.7 brake lining et Bay D-7 8 Breathing sone - grinder operator 6.5 on brake lining at Bay B-6 - Ventilation dlsoooneoted 10 Breathing sone - raokars placing 4.3 unoured lining into the recks and dumping cured linings from the rooks at Bay B-6