Document 7O5rqQEGE559mRxMr5gOvRDvj
HYDRAULIC GOVIRNORS TM.t,w
i
out, raising pilot-valve plunger. Fig. 5. Raising the plunger opens control porta so oU under pressure con flow through port to upper side ol power piston. Oil pressure forces piston down to reduce fuel supply. OU under piston escape* through the lower port to the sump.
As power piston moves down It pulls the speed-droop lever down, Increasing the ipeeder-spring force. Larger force pushes the ball arms in, lowering the pilot-valve plunger ond slowing the fur ther downward motion of power piston. When ball arras reach the vertical posi tion, control ports are closed and power piston has stopped moving. \V
Sinee speeder-spring force Ms in creased ss load is reduced, it requires more weight foree-khai is. a higher engine speed--to balance the spring force. Increase of engine steady speed caused by load decrease ia the speed droop. It prevents hunting by stopping the corrective movement of the power piston 6e/or the engine returns to Its previous speed..
Advantages of this type bydreaticgovernor Include-. (1) relatively inex pensive (2) sccurate and sensitive, giv ing good speed control (3)' simple (or a hydraulic governor, has few parts (4) more powerful than a mechanical gov ernor of similar dimensions.
Disadvantages include: (1) not Isochronous (2) speed-droop adjustment la inconvenient because It Is made in side the governor.
Fig. <5 shows the Internal construc tion of a commercial hydraulic governor employing permanent speed droop to obtain liability. Its pant are labeled to
correspond with those in Fig. 3, 4 and 5. In addition. Fig, 1$ shows the pump that supplies oil, at 120 psl and the ac cumulator or reservoir that keeps the oil at constant pressure.
Beil head is rotated by the governor drive shaft through the pilot-valve hush ing. Amount of speed droop may be changed by adjusting the length of the 2-part speed-droop lever. Speed adjust ment is provided by a knob (not shown), which raises or lowers the upper seat of the speeder spring.
Oar next article toili discuss isochro nous hydraulic governors and how they work in modern dittel engines.
Governor, Below, Has Adjustable-Speed Droop
Spted-tfroep tom SfitfO-Omopterer oOjvitoOttl
Cross section through o hydraulic governor hoving permanent speed droopoil pump maintains o pressure of 120 psl for tho operation of the servo"**.
>00
ENOINCEIINO AND MANAGEMENT SECTION
sown
ft, largail pumped-tlor(k j,0 protect in Austria Stever 4100-fl head from ijvoin 6700 h above sea K; (, will have two of the ifpowerful pollen turbines Sfhlgheit-powered pumps
L'iaMMA JEAH T',m MiCof**AMden
Mountainous terrain wh.ro thoro o', no root), required uie ol eh
"
handle men ond material,. Llmberg Dorn eon be eeen ocrm, volley In bockqround
ISttle Rivers Plus Pumped Storage and
|gh Head Make Big Peak-Load Power
S^it thi Katrun Rivrb In Austria, liiU's largest and most outstanding ( *4-storage hydroelectrio power
450,000 hp--la under construeMost of the flow in Austria'! rivers w bam .high mountains where ternRtoea drop to SO F below xero, and f*aod ke pile up 30 to 40 ft deep. Wi} result, runoff In winter ia only ftL? ^ of the summer flow. Dut, in [jW*Ujud winter months the base and ^k'Wada are highest, when runoff to
>! the lowest. ftf^osr-Koprvn Protect. Hydroelec*
IPfrUnta on the power system require |jfeqon|e capacity (or the high sum-
K">v from melting mountain now luyj** so water will be avelleble for Iff-fflTy winter load when runoff is Qfli.ihii la not done, the power de*
ficiency tram hydro plants must be sup plemented by burning expensive fuel in
steaio or dleael plants. It ia to compensate for the lock oi
water for winter power generation that the Glockner-Kaprun development is being made. Melting snow from the Groasgloekner Mountains, two miles above sea level, will be stored in a series of reservoirs end used to generate power for all Austria.
When this projeet is completed and pumping plants ere operating in 1955. it will supply more than 000 million kwhr per year, over 10% of Austria's total power use. Of this, 75% (600 mil lion kwhr) will be available In winter, 25% (200 million kwhr) in summer. The letter is power generated from wafer for which reservoir capacity Is not
available. With Marshall Plan economic aid the largest pen of the main power project has been oompleted.
Pro|at Outline. Tho projeet includes 15.6 miles of tunnels, three storage res ervoirs witb 142,000 acre-ft storage ca pacity. two power-generating stations and two pumping plants. 'By pumped storage a maximum static head of over 4100 ft is made available in the two power plants. Even if the water quan tities are comparatively small and col lected from several small drainage areas, they are valuable for power production because of the high head. Further, about 75% of the lotol power will be
generated in the alt winter months to suppty high-cost peak toads, when water
flow to other plants is low. Fig. 2 allows a profile of the project;
Rmtss
CNGINEEtlNG ANt> MANAOEMENt SECTION
I
I