Document 7O0dkV32aKm3enE3eDDzQVyj
BIOLOGICAL CONSULTANTS
Water Pollution - Water Quality - Biological Surveys - Fishery Biology
Royal D. Suttkus. Ph. D. 7336 HURST STREET NEW ORLEANS. LOUISIANA 70IIS PHONE: 866*8101
Gerald E. Gunning, Ph. D. 360B 4BTH STREET METAIRIE, LOUISIANA 70001 PHONE: 838*4187
April 2, 197b
Mr. Paul E. Heisler Environmental Manager
W, 0. Krummrich Plant Monsanto Company
Sauget, Illinois 62301
.
Dear Mr, Heisler:
On Friday, March 29, Mr, Edward E, Stewart and I discussed the
possibility of my group conducting a fishery survey of Choccolocco Creek,
Shoal Creek and the Coosa River, Alabama, with respect to P,C,B. residues
in the fishes,
'
Dr. Suttkus and I have done biological consulting for Monsanto Company for many years. Most recently we did a two-year survey of the above men tioned streams which amounted to eight quarterly trips with collections of
fishes at ten different locations on the streams. This study was completed
in December, 1972, although some of the data interpretation extended into
calendar year 1973, What we are proposing at the present time is a single trip to the above streams (locations listed below in detail) to collect fishes that can be turned over to you for residue analysis. In essence the trip would be a follow-up trip for the completed survey and the results
of the 197b trip wruld be compared with past data to determine whether or not the residue levels have decreased in the interim since the final trip to the area which was made in September, 1972. The data obtained from the proposed trip would be used by your company in a predictive way so that you might gain some insight as to what one could expect to happen to P,C.B, residues in the Mississippi River below your plant. Of the eight survey trips we made to the Choccolocco Creek area, seven were made when P.C.B, effluent was still entering the creek to some degree from the Anniston, Alabama plant; only one was made after complete stoppage of effluent into Choccolocco Creek. There was a significant drop in residue levels in the fishes after curtailment of the P,C.B, discharge at Anniston, and we would
hope that the proposed trip will show further decreases.
Consultants agree to conduct the proposed trip according to the methodology employed in the past work. We would collect some 500-1000 fishes at ten stations
in the drainage as follows:
DSW 353102
STLCOPCB4085293
1. Shoal Creek, Tributary to Choccolocco Creek, 2.3 miles east of White
Plains, Alabama*
2* Choccolocco Creek at Highway 9, 1 mile south of White Plains, Alabama,
designated as Fish Station 3 in the completed survey*
3* Choccolocco Creek, Fish Station ? of completed survey, Martha H* Williams
Bridge, Highway 9S>.
It* Choccolocco Creek, designated Fish Station 8 in completed survey, 3 miles
south of Interstate 20, Highway 93
..
*> Choccolocco Creek, designated Fish Station 10 in completed survey, High
way 77 Bridge
6* Cheaha Creek, Tributary to Choccolocco Creek, 3*6 miles south of Interstate
20, Highway 93 '
7* Cane Creek, Tributary to Coosa River, 8*6 miles north of Lincoln, Alabama.
8. Aker Creek, Tributary to Coosa River, 6.6 miles north of Lincoln, Alabama*
9* Coosa River at Stemley Bridge (Logan Martin Reservoir), Highway 3U
10. Clear Creek, Tributary to Coosa River (Logan Martin Reservoir), Highway
hZ
The fishes collected at the 10 stations would be iced down and returned to New Orleans for freezing* After 2-3 days they would be shipped by air to you for P*C*B. analysis. I have discussed the details as to what analyses should be run with Mr. Stewart. Subsequently, you would provide me with
the residue data for biological interpretation of the results. Concomitant with the collection of fishes for residue analysis we would preserve a representative sample of fishes at each of the ten stations for an ichthyological survey of the area so that in the future we could indeed substantiate the presence of the species for which P.C.B. analyses were made. These fishes would be identified, tabulated, catalogued, and placed
into our permanent collection for future use by Monsanto (Krummrich) at your
direction. They would not be made available to anyone else unless specifically
authorized by you personally* After residues had been determined and the fish specimens destroyed, the ichthyological survey would constitute proof of our activities in the drainage as outlined above* This is standard pro
cedure on our part in such surveys*
In summary, the outline of the proposed survey would be as follows:
Phase 1--Consultants collect fishes at ten sites. Fishes are identified and tabulated in the field and packaged in aluminum foil by species and
station location; sub-samples and sample packs for each station are clearly labeled to avoid confusion of the samples. Iced samples are returned to New Orleans for fr|ezing and are then shipped to Mr.
Heisler for analysis for P.C.B 8*
Phase 2--Consultants complete ichthyological survey at the time fishes for
residue analysis are collected. These fishes are fixed in 10j formalin and subsequently preserved permanently in l*0; isopropyl alcohol in individual glass jars. Each species at each station is
kept separately and permanently catalogued into the fish collection.
DSW 353103
STLCOPCB4085294
Phase 3--"Monsanto personnel complete the residue data analyses in succeeding
weeks and turn residue data over to Dr. Gunning and Dr. Suttkus for
further interpretation from the biological point of view. Consultants
will indicate 60-60 lots that should be analyzed for P.C.B 8.
Phase --Dr. Gunning and Dr. Suttkus submit a final report on the residue data
s to Mr. Heisler including comparison with past work done for Monsanto
Company. .
\ #
-
Cost of the survey for biological consultants to do the above work*
A. Billing after completion of Phase 1:
Dr. Gerald E. Gunning, Consulting Fee
Dr. Royal D. Suttkus, Consulting Fee Graduate Student #1 Graduate Student #2 Jar & preservative allowance for fishes
.
Total
$ 1500.00
$ 1500.00 300.00 300.00 200,00
$ 3660.60 Expenses
Expenses Include travel (2 vehicles at 12^/mile), actual motel expenses
for field crew of four men, and air transportation of specimens to
St. Louis for residue analysis.
/
B. Billing after completion of Phases 2, 3 and
Dr. Gerald E. Gunning, Consulting Fee
Dr. Royal D. Suttkus, Consulting Fee .
$ 500.00
500.00
Total
$ lOOO.OO
Total cost of survey--$1*800 expenses
as outlined above.
We are prepared to do this survey either during the months of May or June, 197U. If there are any questions about the proposal, please let us know.
Thank you very much for your consideration.
Very truly yours,
Gornld F.. Gunning, Ph.D. Royol D. Suttkus, Ph.D. Biological Consultants geg
DSW 353104
STLCOPCB4085295