Document 7NQNamknEkD9gaLD7gZ8x57E

* SURPLUS PROPERTY DECLARATION LOCATION: 0515 OJMTCOOtl 067 (LOCMOJ Solvents and Coatings Division (aviso* nauci Texas City (CITY) Texas (STATE) TO BE COMPLETED AT ORIGINATING LOCATION #34 Gas Turbine/Generator/Boiler Facility------------------ ---------------------------- OUUblb;---------------- Riiilriing Numher iou Dept /Sys 000433. Owning Division $&CM Profit Canter 634 Estimated Location Costa: Shutdown and cleaning; preparation tor removal (Show procedures on the back) Engineering _.$ 3,000 1ahnr 5 36,000 Date Availahla Ctober 1987 Materiel $ 2,000 . ,ro Fixrjrl Investment Net Rnnk Value 0 3 695,273 as of 12-31-86 <o*m Overhead $ 10,000 Tntal $ 30,000 Est By-----SfiCfl'chran/KWkiyng GENERAL DESCRIPTION OF FACILITY: (Attach additional sheet If needed) HAZARDOUS MATERIALS PRODUCED OR HANDLEO Westinghouse 191 Gas Turbine/15 MW Generator with 75 M/Lb/Hr Waste Heat Boiler and Auxiliary Equipment (Flash Tank, Deaerator Feed Pump). Boiler does have auxiliary firing for total capacity of 180 M/Lb/Hr. (List by Name) Asbestos REASON FOR SHUTOOWN: Not required after startup of Cogeneration Plant. ESTIMATEO BY INVESTMENT RECOVERY DEPARTMENT: Equipment Reuse (NBV) Equipment Income Other Income Dismantlement Proceeds Total Recovery Value ot Associated Stores (e g.. 701, 703, 704, 720. 723, 740) (See back of form) ROUTE FOR APPROVAL AS SHOWN BELOW: 1. Originator 2. Plant Surplus Equipment Coordinator Decontamination Cost Dismantlement Cost Invest Recovery Dept. Total Costs By . Date DISTRIBUTION: 1. K. W. Klyng/T. 0. B1 urn 2. J. L. G1ass 3. F. S. Provenzano 4. W. R. Yerkey 5. D. B. Smith, II 3. Plant Manager 4. Investment Recovery Dept P.O. Box 8361 So. Charleston, WV 25303 5. Div. Controller obtains Oiv. and other approvals: UCTC 18798 iD 3-lftf0fWew 8r*4> AO ?78 6. Investment Recovery Dept, distributes copies to originating plant and others as needed. SHUTDOWN ANO CLEANING PROCEDURES: Us^ any special conditions: Piping or wiring changes, utility relocations, hazardous materials, cleaning procedures, disposal of cleaning agents. Costs to be included in Location Cost Estimate All asbestos removal will be handled by contractor. Asbestos will be disposed of by UCC at approved landfill. I I I i Location Staff Approvals Health. Safety. Environmental UCTC 18799