ABERDEEN MONTHLY PROGRESS REPORT MAY, 1990
A
*
V
Safety
There was one first aid case reported in May. At month's end, Aberdeen plant employees had worked 3988 days (5,298,464 manhours) since the last lost time injury.
FY 1990 Kev Statistical Information
PVC Production, MM Lbs. Reactor Stream Factor, % Resin Quality, % Prime VCM Efficiency, Lbs./Lb. Flexible Compound Production, MM Lbs. Flexible Compound Quality, % Prime Rigid Compound Production, MM Lbs. Rigid Compound Quality, % Prime Plasticizer Production, MM Lbs. Plasticizer Quality, % Prime Energy Use, (EUI, %) Fixed Cost Variance, $M Variable Cost Efficiency Variance, $M
Caoacitv Utilization Factors
May
39.2 92.9 98.4 1.0097
6.1 99.0
5.4 99.8
1.5 81.3 < 4.0> < 82.4> 18.0
Y.T.D.
299.0 88.0 97.1
1.0019 48.6 98.2 39.5 99.6 12.2 88.7
229.2 553.6
Resin Flexible Compound Rigid Compound Plasticizer
Operations
103.7 78.8 90.9 63.9
100.9 77.9 82.7 71.5
The latest clean wall test was successful keeping the clean through a ninety batch run of 5305. Resin contamination numbers were good throughout the run. A successful test batch of 5325 was made for Premiere Polymers.
Flexible compound inventory dropped about 600M pounds in May with
packaged shipments exceeding April by 500M pounds.
Line V
operated only 3.5 days. PLENEX polymer trials consumed fifty-
nine hours on Line I producing new jacket formulations for UL
Rigid compound demand remained strong through May.
VAB.0001190067
T. H. Huffman 6/27/90 Aberdeen Monthly Progress Report Page 2
- May,
1990
The overall efficiency variance for the month was favorable by $18.0M. The resin and flexible compound groups continue successful off-grade reduction programs with resin off-grade 56% below budget and flexible compound mill scrap 36% below budget.
Fixed costs were essentially at budget except for the $83M payroll correction for April.
1. Roy Richards, the Southwire Company's CEO, travelled to Aberdeen on May 24 with other Southwire management personnel to present Vista a plaque for achieving the "Certified Quality Vendor" rating. This award was for performance in Southwire's Vendor Excellence Program for the six-month period November 1, 1989 to April 30, 1990.
Vista signed a new one-year Vendor Excellence Quality Agreement with Southwire beginning May 1, 1990.
3. This month 94.9% of the plant's natural teams met and the average number of meetings per natural team was 1.15.
4. R. W. Seymour made an MBVA visit with Eric Strouder to Intex in Corinth, Mississippi.
R. W. Seymour Plant Manager
VAB.0001190068
DISTRIBUTION
Hous ton
J. D. Burns
X
R. T. Ferrell
X
T. H. Huffman
C. J. Matson
D. F. Harman
H. R. Flammer
R. R. Smith
B. J. Bean
R. H. Gerlach
R. D. Gamblin
W. L. McClain
J. P. Stokes
Austin
R. L. Poe
X
H. J. Hall
Oklahoma City LCVCM Plant LCCP Plant
H. D. Garrison R. A. Conrad J. Friend
LCLAB Plant
J. W. Ware
X
Baltimore Hammond Blane
L. R. Bauer J. Pavao C. R. Miller
X X
Premiere
P. L. Foote
Aberdeen
RWS/DCS (File Copy), TJA, JBA, JEB, JHE, SCH, MRK, JEL, DAM, RBN, JEN, JDO, REP, BLT
X X X X X X X X X X
X X X X
X X
mmmmmmmmmm
VAB.0001190069
wmm
m mmmrn
r
SAFETY - B. L. Trego
First Aid OSHA Recordable
Total Injuries
Number of Restricted Workday Cases Number of Lost Workday Cases
1 0 1
0 0
Fiscal
Fiscal Y.T.D. 1989
12
_6 18
2
0
Vinyl Operations Compound Operations Maintenance Laboratory Receiving/Warehouse Office
Totals
Injuries bv Tvoe
Cuts and Abrasions Eye Injuries Burns Bruises Strains/Sprains Stings Other
Totals
Injuries
Lost Workday Cases Days Lost
0 0 1 0 0 0 1
16
01
30
20
0
1
20
0
1
6
119
2
4 10
1
0
_1 18
3 0
6
4 3
0
Last lost time injury - 7/5/79
Days since -
3988
Employee hours since - 5,298,464
On May 31, 1990, the employees of the Aberdeen plant completed 3988 days with no lost time injury.
The Drill Planning Team held four chlorine emergency response drills in May; one for each shift. Following each drill, response training was held for
ral chlorine emergency situations.
mmmmmrnmf T W
VAB.0001190070
Ml mmm
SAFETY - Continued
Routine dosimetry results for the month were:
Chemical
VCM Lead Total Particulates
Monthly Injury Summarv
<____________________________
80 100.0 16 100.0
6 100.0
_______> pel
Ntimhar
Percent
0 0.0 0 0.0 0 0.0
Injury Class
Description
Maintenance
Cut, right forearm.
VAB.0001190071
MMMMWPPPM
T. J. Arbeiter
Vista signed a new one-year Vendor Excellence Quality Agreement with Southwire Company, our largest customer at the Aberdeen plant. The agreement covers all 5415 resin sold to Southwire. The agreement clarifies in detail the mutually agreed upon requirements relating to product quality, service and delivery, wire and cable commitment, technical support and exemplary service. This last category takes into account Vista's attitude and commitment towards a long-term partnership with Southwire and our willingness to support Southwire's quality improvement efforts.
Our previous quality agreement with Southwire was six months in duration (November 1, 1989 - April 30, 1990). During these six months of our first agreement, Vista achieved a rating of 99.7 out of a possible 108 points. This score earned Vista a "Certified Quality Vendor" rating. A score of 100 points or more earns the highest rating of "Excellent Vendor". As of this time, no one has achieved this highest rating.
Southwire's top management, including Roy Richards, Southwire's CEO, travelled to Aberdeen May 25 to present Vista with a plaque in honor of our achieving the "Certified Quality Vendor" rating. Approxi mately 110 Vista employees attended presentations in the plant auditorium and the Vinyl Department control room.
R. W. Seymour made one customer MBWA visit during May with Eric Strouder to Intex in Corinth, Mississippi.
D. G. Mouldings of Marion, Virginia, visited the plant for a general information exchange and tour.
94.9% of the plant's natural teams met during May. meetings per natural team were 1.15.
The average
VAB.0001190072
i '
COST VARIANCES - D. C. Skokna
Product
PVC Flexible Compound Rigid Compound Plasticizer
$10.0
73.3
< 36.1)
(-2.9,2)
$ 18.0
($163.2) 39.1 78.9 39.6
($ 5.6)
($153.2) 112.4 42.8 10.4
$ 12.4
PVC -
Operations were essentially at budget. Off-grade production was 56% below budget.
Flexible Compound - Raw material usage was $22.4M favorable; product mix variance was $45.OM favorable; and the variance due to off-grade was $12.2M favorable. Scrap rates were 36% below budget.
Rigid
Compound
- The unfavorable variance was due to an unfavorable product mix variance of $96.8M offset by a favorable raw material variance of $60.3M. Most of the raw material variance was due to a favorable TiOa variance that was caused by difficulties in accurately gauging the Ti02 hopper.
Plasticizer - Raw material consumption was over budget.
Price Variances
- Resin to Rigid Compound - Resin to Flexible Compound - Natural Gas
- Alfol 610R Alcohols
- VCM
- Other Price Variances
Fixed Cost Variances
Total
69.5 23.6 20.0 30.9 (188.1) 38.5 ($ 5.6)
- Payroll and Benefits - MM&C - Miscellaneous - TI&D - Clearances
SM
Total
($ 97.5) 34.2
( 28.4) ( 5.1)
14.4 ($ 82.4)
#
VAB.0001190073
Continued - The accounting error made in May ($83M of May payroll rates were not accrued) was corrected.
M. M. & C. - Activity was below budgeted levels. Miscellaneous:
Packaging supplies were $26.8M favorable. Moving, home assistance was $25.OM unfavorable due to John Olson's move. Processing supplies were $10.8M unfavorable. Contract costs - operating were $31.1M unfavorable due to changes related to preparing for a potential work stoppage. Clearances - The $14.4M favorable variance was due to the sale of some
surplus equipment.
VAB.0001190074
VINYL - J. D. Olson, J. M. Vinoski
Safety
The Vinyl Department had no first aid or OSHA recordable injuries during the month of Hay.
The monthly safety meeting topic was "Lockout and Tagout Procedures". General
1. The latest BUS-80 test was successful.
The temporary
injection system on D745 kept the reactor clean through
ninety batches of 5305 resin. Resin contamination numbers
were good throughout the run.
2. A test batch of 5325 resin was made for Premiere Polymers. Specifications for the resin produced were very close to those targeted. Further results are expected next month.
The res in raw aterials in the 744 account were valued at $419.9M.
- Production, MM Lbs. - Daily Rate, M Lbs./C.D. - Capacity Utilization Factor, % - Total Reactor Charges - Charges/C.D.
- Reactor Stream Factor, %
- Rotary Dryer Stream Factor (#4 #8),
- Fluid Bed Dryer Stream Factor, % - Resin Quality, % Prime
%
Reactor Downtime
39.; 1264.!
103.: 934. (
30.: 92.!
88.:
98.: 98.^
Operational downtime (recovery scheduling conflicts, New Module rinse/charge water conflicts, waiting for Q.C. data before charging, 0-ring leaks, no place to dump, rinsing chem wash tanks).
YTD
299.0 1230.5
100.9 7028.0
28.9
88.0
79.4 91.6 97.1
Hours
341
Maintenance downtime (condenser drilling on D744 and D400, reactor cleaning on D700, hydroblasting and drilling on D745, dump valve change on D300, and miscellaneous valve and instrument repairs).
184
VAB.0001190075
VINYL - Continued
Drver
Reactor limited production.
Operational downtime (centrifuge plugs, dryer cleaning, and flameouts).
Maintenance downtime (exhauster, centrifuge, baghouse and activator maintenance, and screw conveyor repairs).
49.2 25.8
25.0
J. B. Autrey, J. B. Hegwood
Reactors 400 and 744 were shut down during the month for condenser drilling because of cooling control problems.
Reactor 745 was shut down during the month for condenser drilling and hydroblasting as part of the contamination control program.
The reactor agitator gearbox on during the month because of an The fluid coupling was replaced realigned.
reactor 745 was shut down vibration problem,
and the gearbox and motor
Reactor 700 was shut down during the month for hydroblasting as part of the contamination control program.
The chem wash pumps in the old reactor unit were shut down during the month for repairs to their bases. The bases were leveled and grouted in place. The pumps were then realigned and put back in service.
There were two Corken VC unloading compressors rebuilt during the month. The 690 compressor had bad rings and a bad bearing on the crank shaft. The 490 compressor was leaking around the packing.
There were two major valves changed out in the reactor area during the month.
VAB.0001190076
J w* mmm mmmmm
COMPOUND - J. E. Nickerson, K. G. Akins
A
The Compound Department worked without injury during
meetings.
The
General
Flexible compound inventories fell from 7.54MM pounds to 6.97MM pounds during the month. Packaged compound shipments were up 500M pounds from April. Line V only operated 3.5 days during this month for inventory control. Line I was down for fifty-nine hours for PLENEX polymer testing and production. This month several new jacket formulations were produced for extrusion onto wire and submittal to UL for testing.
Demand for rigid compound remained strong in May. Current orders have the unit on an extremely tight production schedule into July.
Operating
Comoound Production
Days
Month
Avsc. /Dav
Fiscal Y.T.D.
Line I
30
Line III
31
Line V
3.5
Total
% Prime
Capacity Utilization Factor
1884
63
4066
131
180 6130
_51 245
99.0
.788
15937 27648
5019 48604
98.2 .779
Downtime
Hours
Line I
- Product: Changes PLENEX Polymer Testing Miscellaneous Maintenance Quality Problems & Control Dicer Problems & Maintenance
85 59
25
12 12
- Product Changes - Miscellaneous Maintenance - Quality Problems & Control - Dicer Problems & Maintenance
Line V
- Product Changes - Miscellaneous Maintenance
52 17 13
8
15 15
mm
WM
VAB.0001190077
COMPOUND - Continued
Operating Days
Rigid Compound
30.5
% Prime
Capacity Utilization Factor
5412 99.8 .909
177
Downtime
- Product Changes - Miscellaneous Maintenance - Quality Problems & Control - Scales Maintenance
Hours
73 73 42 22
Operating Davs
Month
Plasticizer
31
% Prime
Capacity Utilization Factor
1479 81.3 .639
39493 99.6 .827
Fiscal Y.T.D. 12166 88.7 .715
Maintenance Work - J. B. Autrey, J. B. Hegwood
The Line I Banbury was shut down during the month for a seal replacement. The lubrication return lines for the mill were also cleaned during the month because of plugging.
The middle compound cooling tower pump was put back in service during the month. The pump had been sent out for reconditioning.
The control panel on the #1 dicer was repaired during
the month.
The ground sensor, contact, and two
resistors were changed out on the panel.
VAB.0001190078
ENGINEERING - R. E. Polk, S. C. Hillman, M. R. Kane
PROJECTS IN DEVELOPMENT - GENERAL
EVC Cleanwall Technology
The D745 cleanwall trial was successfully run during the month of May in 5305/5265 service. Reactor jacket modifications to cool the vapor space alleviated the wall buildup problems experienced previously with the low molecular weight formulas. Additional testing with 5415 resin will be conducted in early July.
Initial testing of an alternative reactor cleaning nozzle has been completed out of the reactor. The need for in-reactor testing is being evaluated.
Donnelly Dusting Problem
Steve Hillman and John Levardsen visited Donnelly, a flexible compound customer, to assist them in solving a dusting problem at their compound pellet storage silos. A letter was sent to Donnelly with suggestions as to how to resolve the proble
Patco Antistat Trials
Initial testing of an alternative antistat made by Patco was done on 5415 resin in a rotary dryer. This new antistat has the potential to eliminate fluid bed dusting problems and replace wet calcium stearate in 5385 resin. Q.C. testing at the plant showed no quality problems. Samples will be sent to R&D for evaluation. Additional testing on 5415 resin in the fluid bed dryer and 5385 resin is being planned.
Fourth fiscal Quarter Capital Budget
The fourth quarter budget was sent to Houston on June 8. AFE's for five of the six projects were submitted with the budget.
A
VAB.0001190079
8 3
cn
tn 3
st
8 8
a
m
titt
HU S
Si 3N
niNHt
is
st
tcnn
Usu
E
s
u)
3 cn cn
*8
S c tn o
s
Z Q (A 5
3* si?
3 3 a~ 3
3
u 3 Ui
o
cn
3
3 a cn
at* s
cn
3 2u 3 st
E 3cn cn
3
at S
a
OC
^ UJ O
UJ 81
aS
I
o o 3 53
2
% sS
cn cn
i*i
3;
3
3
aa3
. a s3 cn cn ^
sa 32
cn 3 cn cn
3
3
iii
3
3
33
cn * I-38
3 3
1 rcn
3
3
5
a_
st
cn
cn
ggSS:s:
sa
3
3
Hu
I3S3 ha S8IS
8
3
S3^IS38
u
3 cn
UJ Of
38 3 8
tn u
cn ~ 8
rJ wc W
asia
3
cn 8
, i8
aa 8
3 ctnn tt- ut
cn
cn
ui
cn
5
5
8
s^s
P 3 ||
_ cn 3
c3n cm8n cn 3cn cca j3g c3n c3n cn m1es
cn a 3
gw* EX cn
a n k3uaucMnu-C3j^c5-nk5ccScnk5xS
cn si
3 3 cn
aa
lg
id bJ SSMMMlZIZoStku!
__
S
cn
3 *--
a
S22i!2,n0 5
cn
csn siisi
3i
3 cn
3 5
Illllisssscg^aSdswsSWsisISMl|sCSiHidls|lUdsLlU?si2s*i*i *
3
U UJ u
3
3 3
38
ir>
8 ss
38
cn a
S1
cn w cn 2 cn u cn 5 cn
m a.
S uosi m
sa
s
sa
cn a
*3
8
22 8 8 2 5 2 8 3
8 a * r8 2 832 s S s 2 10 & aa a Ssgss8cn
cn 8
a
8E
8 33
s*
3 5*
3 5
cn cn 3
8
a 8^..
UI
cn
%
* 8
8a 8
32 UJ --
UJ o *
8
M M UI p
3*8 cn -* d s
28
;2 cn uj
eg a 1g
8 3 ex H- 8 32
a
5
|
-* 3 8
8 "
3
S u
cn X
uj
Igj
cn ys
I
a23s
1
8 *S*
23
8
28
883
sssiiii
3 3 sli
cn 3 3 3
8 5 st 8
t
s3 R S
2S
sc s2 2
22
uuuaSaaSSS^xxS
S2
3 VAB.0001190080
tn
333
ENVIRONMENTAL - F. 6. Jeanson
Water
All wastewater discharge parameters were met for the month of May.
The Mississippi Department of Environmental Quality (MDEQ) conducted an inspection of all wastewater outfalls. No problems were found during this inspection.
Waste
Waste shipments for the month included:
One bulk load of separator oil was shipped to M&M in Gadsden. Alabama.
One load of plasticizer filter cake (seventy-seven drums) was shipped to CWM in Emelle, AL.
A letter was written describing the plant recommendations for old pond #1 which is a past landfill site.
Superfund
A visit to Sun Polymers to evaluate pond resin recovery was conducted this month. Conoco and Vista participated in this visit. Sun Polymers is currently recovering two ponds of FVC resin, 40MM pounds, from a B.F. Goodrich plant in Canada.
A meeting was set up with the MDEQ in June to review our sites and any remediation plans. Conoco will be involved in this meeting.
Several meetings were held with employees and city officials to explain the Superfund sites on our property and an EPA study that was done on these sites. The MDEQ was also notified of findings in the EPA study.
Air
The modeling study on VCM emissions from the plant was completed in late May and submitted to the MDEQ. If the MDEQ approves the study, they will issue a public notice for our modified air permit application. Thirty days later if there are no objections from the public, the MDEQ permit board will review and hopefully approve the application.
Miscellaneous
I attended a MISTAP regulation review conference during the month.
An environmental training seminar was held for plant operations and engineering personnel.
I attended the annual environmental meeting in Austin, TX.
A
VAB.0001190081
ENERGY CONSERVATION - D. A. Moore
A. Unadjusted EUI
<4.0%>
B. Adjusted EUI
<3.9%>
C. BTU/Lb. Product
2554.0
D. Total Energy Consumption MMM BTU 132.44
< 7.7%> < 7.9%>
2644.0 1053.20
There were sixteen energy related items completed in May, 1990. Fifteen of these items were steam leak repairs. The remaining one was steam trap repairs.
III. Boiler Operation
Boiler
No. 1 No. 2 No. 3
83.3% 83.0<o 82.9%
83.4% 83.3% 83.0%
(1) Boiler number two was operated one day during the month.
11 <ieim
mm
wmm/m
VAB.0001190082
*
A
IMP
J Beall
Allen Bodron - Rehire Berlin Genetti - New Hire Anthoney Deanes - New Hire
Proaetlo"/Tr"^-
Robert "Bud" Stone - promoted from General Mechanic "B" to General Mechanic "A*#
Timothy Arbeiter - transferred from Senior Analyst Houston, Tx. to Quality Management Coordinator -
None
Brian Aftergut To/Trom Leave of Absence None
*'
fHNMW
UNiMB
wrnmmmmmmmmm
mm m
VAB.0001190083
m mm
Salaried Employees Hourly Employees Total Employees
ABERDEEN, MISSISSIPPI
MAY , 1990
mm mmmaimm
MONTHLY PERSONNEL EXPORT
79* Minority Employees #, %
m
Salaried
Z
251
Hourly
66
Total
73
New Employees T erminat ions
0 0
Hourly Min. Hired % Min. Hired
0 0
Hourly Min. Term.
0
% Min. Term
0
DEPARTMENTS PAR EMPLOTEES MTM. EMP. %MIN. MEN HIRES YTP TERM. YTP TTffiflflyEE YIP.
Warehouse 16 Gen. Plant 13 Maintenance 41 Laboratory 24 Compound 40 Vinyl Plasticizer 5
41
24
5
a a
10 A 5A
26 67 A 30
40
0A 00
00 0 00
00 0
00
Number of Applicants:
Month
0 Year To Date
APPLICANT BREAKDOWN
# Minority
A % Minority __0
# Female
0 % Female
0
Hires (Hourly):
Month A
Year To Date
Terminations (Hourly)
A
Month 0 Year To Date 0
Overall Turnover
Projected Annual Turnover __q
VAB.0001190084
CO Ul
x
c_
too
i-o
1^3
ir*i i i !** !** 1i 1-0 !
m
ni 4
i
*!
z. i /k-J"ll X t
* J
4 -TO I *
JL^ |
I
IOi o
-
:I
i *_ L j
t
:lo! -z?
I **-X I O
`O;0 I! O<c-
-O
l
in CO
1I
i
Il
1PjJ t
KICjOO |
*f <E I
--------
)uO I K ! >0 -O
I
II
IJ
i r-
-o i
rC-Mj * t i '*r-4
3iI
r-
i
CD It**
I
r-
io J4
i
i 1 C*> 1
i "O 1
4
4
1 1
'3 -
1 1
1 ;-4-j 1 1 4* 41 41
4
14 1i ro i CM 1 1 1 o
(CO IO* 14
1
i 1 -o i 'X* 1 i + !
i i i
1
p
1 1
<^14
i t i i
CM 4
l>*
1 ! 1 1
4
i i i
m
1 1 1 1
4
i1 i1i 1
i 1 i1i 1
i1 i1i 1
m Px*
i i i
4
1 1 1
1sSS
4
i i i
4
f 1 1
r^4
i i i
*
1 I 1
4
1 1 i
CM
1 1 1
00
i i i
in CO
1 1 1
INr--
i * i
<N
1 1 1
1 1 i1i f
ICM ICO 14 trO 1 I 1 1 i tin i^
ICO l-^c !~0
CM
m 4
CM
ro
in CM
4 m
J CM r*j cm
4 4 4
1 1 in i t
1 11
in4 CO
1 1 I
CM 4
P-
i i t
4
n
1 1 1
4
i 1 i 1* -r--
4 J
CO
1
CM
i
1
4 -o 1 p- i
1
1
1
1
*
!
iin !CM !4
o-1 !> 1 im
<X LU
CO CO CO
HVMI
nmw
V mmmmmmrnm
VAB.0001190085
I r"
CO
CO CJ o
co
m n ra co
o.
cm
co
of
\o
:r co i i
I
*$ f
CO I
t
<i f C*J t cm
riO* I in t cm
<r
ii
4
*i
o
+_ '
!oI
f 4
fo r 'O
3>
i f
v
in i n
cm ! CM i
1
t CO 1 uT*< I *0
1 -- | in cm i
j" -
i
>o i ^~i I IT*
S4
1i * t
i
1 -*3 1 I4 1
t i i
r--- tt
ij t
f 0i
ri
\ CM 4
"*.1 1 <-> 1
1 I
4
1i
in Ifl
1 CM
4
V<
n
i1
X* ( CO
<n
-O
*:E f I
v*
co i
i-- i 4 *i
o
>
I-
1 14
1 T
o
O I CK 1
t
|
i *X
\d - * i -O 1 1 ^
1
r mi
^ O
1 i
O1 <4- 1
in >o
I 1
CD 1 in 1
CK CM
!<JC 1 1m i
^f -f
* -i
*-- 1 O 1 o i O 1
1 m1 D> 1 O f
f jjJ i+
<r i
t1
1 J*
I
I r t 14
1O 1
U'l t* -i-- tH 1 *
in 4
i t
<o *
1 1
4
1 1
-*
O1f t
iCJ
is: iUJ
icn
;co
i 1
1
i
i
w; Cj I tri
u- 1 4 i
\ j*
ii ii
ig t
1} ii 11
f
1 1
co
1
rrs
!
D*
00
1
I
rHT--i ro
Iiit
--r'TO--j*
1ifi
oo -3>
*111
*+-- o ro
iiit
fCOM O
1111
rmo <X>
1111
in
i
M3
4 m
t
i i
i
m m
4
O
1 1 1
1
CO oo
4
1 1
1 1
o 4
i
<1 C-J
i
Qi
O
i i
Ii
O!
Si
inUJ CO
i oi
1 1
U->4
i t
o
1 1 1
o1 1
41
in r^-
1
1 l
O o
4
1
1 1
in CM
i i i
O o
4
t i i
m
i n i co iCO CO
1 1 1
CK 1 i
CM i
CM tn CM
I 1
1
o
1 1
I
ro KO
1
1 1
CM
l
1 1
in in
i i
i
ro
i
in
o i^
11*1 1 tn 1
M 1 r^-- 1 I1 4r
4
1 o t
<D 1 CK i
CD 1
i
Wi
>i!
b
I h3|
<1 os
COi Wf
Pn I
ICO I COK I <*!
OMX I XU ll IUJ i II )*-* I
UJ t
LO !O
*
I
I
rrt
*
i r i
>
i
in
i
cm
*
*
i
in
in i CM 1 in i oo i m i
cm r
i
i
!
in CM
i CM
I I
00 1 I i
I
CD
o i in ii in t
i
in i in in t inin-4
i
i(
r-
co4
i
fi
* 00
i i
I
inor*-ni
i%>0
ti
in K>
i I
*n*
i
I I
i inin i
i
4i
I CM i in 1 * i < i
i in i o I CM
i CD i ro I
IM
I
^i i CM
CM I
ii
J I CM
ii
II
* 1I
i ii in ii
i i
Ii
OI
I <l
I C4 1
CM I CK I m
ro t
rn i in i
it
ti
it
ii
sii
in
i i
i ini i * t 00
i o*
i
i
4
CinM
"o
m i IM ro i ro
i4 r-4 i M3
t
rin- 7i in "i
oino if D"
r- i CM i i
s
00
4
OC CO
CO
in t in i
i
o i CM
i*
i
I m i in
inJ >
Mi I 4--' |
I CM I CD
CN ro
in
i ro
CM I oo
i r*j
i
ti
in
1i
in
i i
tn
4
i i
CMm
oo in
oi o
O
\
ro i
ck
CM 1 CO o
In
i
in iI
CM I in
*I 4 *> I in CM t ^4liw
in i m
in i
ir;
to
Ul
<D CJ CK
min
ro
^ *^7
i rt ro l^ i
1 1 OO 1 CM 1* 1 ..M
1 rn ^ ic^j f fin
f CM ICK 14
I
ii tn
I CM I*
1^*
i I CM I CM
f
iin
1CM
i
1CK
IM 10^
iiro
i
I
Ijin
! IC-J 1
I
i I 1
I
I (
i UJ i i i--i i
--* ii *--* i
<-L.
CO I
I I I
j
i UJ i
\i
I
co I
t t
1i
Ii
Ii
I Ul I
Ul I Q I Q I rj
i r*^
iU i t
! CO
I I i a.
UJ I
c-
00 .` J C i o ro
^ C*J
tu CO CO CO
*M|W
PiPMIMMiiVMli
VAB.0001190086
ADMINISTRATIVE SERVICES - J. E. Little
There were no safety instances this month.
Cflgt Saving?
Savings due to competitive bidding were $16,475 for May, and $91,419 for FY1990.
Savings due to prompt payment discounts were $2257 for May, and $16,332 for FY1990.
Savings due to using excess materials (AFE and work order stores) were $561 for May, and $17,090 for FY1990.
Warehouse - Finished Goods Inventory
Slow moving and off-grade inventories are still a major concern approximately 35% of total packaged inventories.
Strategic Initiatives
Darrel Peterson, U.E.&C., conducted VMS overview training May 15-17. Pre-implementation work is progressing well.
I met with Price-Waterhouse to discuss activity based cost accounting.
Employee Development
Mike Swierc and Tommy Cummings attended IPSM May 16 & 17.
Tommy Cummings and Amy Vaughn attended Mississippi State Tax Seminar in Tupelo, MS, on May 10.
Ruth Morris, Data Processing, was in Aberdeen May 25-28 to make additional revisions to the payroll management system.
Meetings
5/02 5/09
5/09
Price-Waterhouse - activity based cost accounting.
Gold Bond visit - discussed raw material coordination.
Mike Swierc met with Motion Industries concerning quality progra *
A
VAB.0001190087
T mm VMPNpMM
Meetings
5/11
5/16
5/24
5/25 5/31
continued
Continued
The Stores Team made a presentation to Bob Seymour's Natural Team.
Southwire meeting OASIS ~ task review
Mike Swierc visited Halstab (Hammond, Ind.) for the supplier recognition presentation.
Southwire presentation
The Stores Team made a presentation to Engineering.
VAB.0001190088
osmi
mmmm
fPi
mum ciuicu pun surriK iiutiis
ui tm
-SIlNIItl IT PtOHCTI-
P991IC
HOfTI 1PT/ITC
noun
PHI 1C
7TD lPf/lTC
ileum
IISII-90LI IU1l-ttCUfiKi
29,947,36a 442,331
11,271,111 392,181
387,290 9
159,983,172 2,523,919
76,635,359 1,754,999
1,151,411 9
IUUIU COHMU-NU
1,in,219
nuiiu coamo-ricuin 3,912,313
121,111 81,171
9 9
11,712,511 25,199,975
7,648,291 1,254,237
9 9
IN MSIIKS
lltll CMPtHI-HU
inn comou-ncum mine - ini
TOUIK - MCIMII
pumcmi
TOTAL
-utrum n mi-
13,199
MiMii
411,142
9
1,231,989 9
9
6 8
0 0 597,399 9 90
213,869
171,989
384,869
n,in, in 14,151,151 1,259,369
37,970
00
25,946,219 1,735,325
1,113,411 219.723
9 9
9 9 5,255,171 9 9 128,265
1,133.411
1.132.111 1.471.819
226,429,822 96,424,959 8,611,545
B9LI:
*UI* IIS1I iiiiim comm tun mnni runieiin
mill in W9
IIS1I fUIlKItWHU
mu comm runmw
mu m
MUCM
164
13 24
3
294
CVST0IK1 new
COHKHI
ClRlIII
19 65 99 0 13 97
27 95
l.iti 291 462 97 11 35 111 15 129 19 9 29
1,477 227 175
TOTH
249 21
37
11
316
1,163 143 325 46
2.379
HCIHH: *111*a.ui Ha
mu nniHi cnnhi inn cmmi PUItIClIII
Tomut
casnmi conn new cinin me comma
............................... 5 19 9 931 72
0 9
0 16 9 9
9 9 00
I1I/9PS
5 14
0
8
36 196 9 0
19
mu 21
117 16 9
161
TT9*
mFuuinu comm inn comm runiciw
mu in
0 039 101
173 579 4 0 19 70 9 1
9 3 99
213 753 4 1
69 31
1 1
93
191 787
92 4
1,964
A
LABORATORY - J. H. Edwards, Jr.
A. Safety - There were no safety incidents in the Laboratory during May. The monthly safety meeting topic was the new "Lockout/Tagout Procedure" taught by Bruce Trego.
There were five customer contacts during May.
1. Jim Edwards, accompanied by Justyn Miller, visited Gold Bond in Sardis, Mississippi. The target specifications for color in RP-28 WHT 122 were discussed. The call was made on 5/23.
2. D. G. Mouldings made a plant visit and a lab tour was given on 5/11.
3. Representatives from Gold Bond made a plant visit on 5/9 and a lab tour was given.
4. Southwire made a plant visit on 5/25 to present the Certified Quality Vendor award to Vista. A lab tour was given.
5. A representative from Intex visited the plant on 5/29/90 and was given a lab tour.
Customer Q.C.
km
PVC C<
PVC Compounders reported high moisture content in a 5415 railcar. Samples of the car were sent to Aberdeen and were confirmed to be high moisture content. The railcar had been loaded from silos filled while the fluid bed dryer was experiencing high moisture problems. The car was returned to Vista.
AT&T sent the Aberdeen lab a sample of con
tamination from a screen pak running 34862
GRY 546. The contamination sample was iden
tified by AT&T as brownish granular material
and metal pieces. The sample was sent to
R&D Austin for analysis.
The metal was
determined to be stainless steel.
The
granular material was mostly chlorine with
small amounts of aluminum, silicone and lead.
A formal response will be written and sent to
AT&T.
LABORATORY - Continued Customer O.C.
Flexible Technologies reported bad dicing and stringers in 18031 WAT C, lot 10Q13. Boxes with the same lot number in Aberdeen were inspected. Four of the twenty-four boxes on the floor were found to have bad dicing. Seven were down-graded as a precaution.
5/29 & 6/2
Gold Bond returned two railcars of RP-28 on 5/29 and on 6/2. The complaint was that the dry blend was too dark. Quality control records show a definite shift lower in L value for that production run. The reason for that shift is still under investigation.
5/21
Vytron complained that 17462 BLK (lot 59L12) and 17462 NAT (lot 50R15) will not produce acceptable extrusions. A review of produc tion records show high hard particle problems during the production of both lots of material.
D. Requests for Corrective Action
There were no requests for corrective action during the month of May.
E. Product Waivers
Customer
Product
Reason
No.
Vulcan Plastics
5385-3P
Bulk Density Range
1 R/C
The following is a summary of residual VCM results on in-
process samples.
None of the reactor daily averages
exceeded 400 ppm RVCM during the month of May, 1990.
Number of Samples Average RVCM, ppm
Reactor Slurries
931 134
Drier
5265
5305
36 0.417
70 0.294
I
PRMMMf
V vppmm
Continued
The following Is a summary of the residual VCM analysis of shipment samples for the month of May, 1990.
Product
Average RVCM. ppm
5265 5305 5385 5395 5415 Dry Blend Debox Pond
39 106
59 11 67 47 12
1
0.101 0.157 0.539 0.116 0.053 0.047 0.336 0.530
Resin Process Capabilities (based on dryer regular s" )
525
Bulk Density Inherent Viscosity
(vs. 0.715 - 0.744) L Color A Color B Color % on Pan
(vs. 2%, max.) % thru 140 Mesh Drytlme Mets I.R.
(vs. 95% of control) Hard Particles, (% > 10) Average particle size,
microns
1.50 2.17
--
8.11 3.17 2.83 1.29
--
1.07 -----
--
-------
138
12fi5
0.78 0.60 0.33 2.92 8.67 2.67 1.18 ---0.63 --------
--
134
5385
2.75 0.67
3.00
2.50 1.56
-----------
1.45 2.00
-- -----------
19.4
160
5395
0 0.90
6.67
2.67 0.94
--
0.84 2.33 4.13
--
4.6
139
5415
1.40 0.77
4.44
6.33 2.75 0.25 2.54 2.00 2.22 1.52 0.9
174
Hardness Color Hard Particles Heat Stability Contamination Dicing
Totals
M Lbs. XU
26.0 52.0 -*--
7.0 --
----
85.0
<0.42> <0.84>
------<0.11>
--
--
<1.37>
M Lbs. XU
7.5 1.4 11.7 - - - 14.8
44.5
<0.12> <0.02> <0.19>
----
<0.24>
<015> <0.72>
WPMPNMtfp
m
VAB.0001190092
LABORATORY - Continued
Quality Summary
Torque Rheometry Color
Total
6.3 44.8 51.1
<0.12> <Q.82> <0.94>
J. Miscellaneous
1. Software is being written for the Q.C. Supervisor to review, add customers and print out a certificate of analysis for customer shipments.
2. Dave Cox assisted Blane with setting up their G.C. for plasticizer analysis. Methods were tested and samples were sent.
3. The lab re-issued six compound formulas with added BFA due to removing BFA from the 108P plasticizer.
4. Billy Paul Sizemore attended two days of IPSM training.
5. Jim Edwards attended two days of rigid formulations and testing training in Austin.
6. All six natural teams met once during the month.
7. The National Sanitation Foundation (NSF) made its annual
inspection this month.
They found no violations in
production, facilities, quality records or procedures.
A
mmmmp
V
VAB.0001190093
m
RESIN Ship Date 5/02/90 5/02/90 5/02/90 5/08/90 5/08/90 5/07/90 5/07/90 5/16/90
5/16/90 5/18/90 5/21/90 5/22/90 5/22/90 5/25/90 5/30/90 5/31/90
SAMPLE SHIPMENTS MAY 1990
Product Pond Resin Pond Resin Pond Resin Pond Resin 5385 5385 5265 5265 5305 5385 5385 5385 5385 Pond Resin 5415 5415 5465
Amount 5 lbs. 50 lbs. 50 lbs. 50 lbs. 2 lbs. 200 lbs. 500 lbs. 2 lbs 2 lbs. 100 lbs. 5 lbs. 2X2 lbs. 5 lbs. 50 lbs. 50 lbs. 5 lbs. 50 lbs.
Customer
W. K. Merriman Inc. V. P. I. American Trading Shawnee Chemical CONNIE NAKAMURA Solem Industries Arlington Mills Procter & Gamble
D. G. Moulding KOHKOKU, USA Dayton Extruded Plastics Uniroyal Chemical Co. American Trading KOHKOKU, USA Uniroyal Chemical KOHKOKU, USA
COMPOUND Ship Date 5/02/90 5/09/90
5/18/90 5/22/90
Product
18031 WAT CL
48451 BLK 48562 BLK
34643 NAT
419-67B BLK 419-68 BLK
Amount 1500 lbs. 50 lbs.
Customer Furon/Synflex LOF Tech
50 lbs.
1500 lbs. 1500 lbs.
CABLEBOL Times Fiber
VAB.0001190094
COMPOUND (Cont.)
5/22/90
38601 BLK
5/23/90
1220-106X NAT
5/24/90
27121 NAT
5/25/90
15072 NAT 18961 NAT
5/30/90
16841 NAT OG 17462 WHT OG 18162 BLK OG 18031 WAT CL OG
5/31/90
38601 NAT
PLASTICIZER Ship Date 5/09/90
Product 610P
Sample Shipments/May 1990 Page 2
200 lbs.
ELECTROCONDUCTORES
4500 lbs. Inovative Plastics
50 lbs.
ABC Plastics
100 lbs. 100 lbs.
Macklanburg-Duncan
30 lbs.
Ron Walker
30 lbs.
30 lbs.
2 X 30 lbs.
200 lbs.
ELECTROCONDUCTORES
Amount 1 gal.
Customer Blane Polymers
A
VAB.0001190095
NUMBER OF N J DRIES
ABERDEEN CHEMICAL PLANT INJURIES
d
P
'
''1
''
f>I
I
1
J`87F M AM J JASON CU'BBF MAMJ JASON QJ'BSF MAMJJASON DJ*9CF MAM
TOTAL INJURIES
O OSHA RECORDABLE
VAB.0001190096
mtqmmmmrnm
T
oi/ruo
PWPMniiiimHN
VAB.0001190097