FRAZER RAILT COMPANY 2475 Hubbard Avenue Detroit, Michigan
SCHEDULE I
TRADE NAME: CATEGORY: COLOR: QUALITY:
Ace Flat Wall Faint Flat Wall Finish White Th ird
Pigment : 71% Lithopone Asbestine Calcium Carbonate Calcium Linoleste Aluminum Stearate '
r
Vehicle*: 23% Varnish Heavy Bodied Linseed Oil Stainless Raw Linseed Oil Mineral Spirits Drier
Lbs.
845 300
50 4
C
:
10
145
20 700
12
Yield in Gallons
Unit Cost
Total Cost
7/eight
.045
38.03
per .01 3.00
gallon
.01
.50
finished
.075
.30
product,
.245
2.21
Laboratory Storage & handling cost
record through loss - 1%
15.4 lbs.
44.04 .44
.18 ,1.80
1U3 20.74
135
2.70
.015
4.50
.07 ____ t$k Storage & handling cost through loss - 3%
30.58 .92
Calculated Yield Ifanufacturing Loss - 2\% Actual Yield
1695
110.1 2.8
107.3
Cost Analysis: Ifeterial cost per gellon Direct labor cost per gallon Factory overhead per gallon Bulk cost per gallon Complete package cost per gallon, inc Factory cost in package per gallon
ing filling charge
PRICES
(a) To a company owned or controlled outlet (b) To ar. independent wholesaler (c) By company owned or controlled outlet to retail customer (8) To an independent retailer (Dealer) C) To other (Industrial)
(Contractor)
75-98
.71
,S1.13
-- .89 .19
1.08
None None 2.10 None 1.79 1.75