Document 7MkyNQ7k1pbx7r411qZBXy9Gg

COMPANY CONFIDENTIAL' RESEARCH AND DEVELOPMENT REPORT ANNISTON PLANT OTHER LOCATIONS *W. G. Engman - WGK *P. 0. DeGarmo - So. 2nd *A. E. Leisy - WGK *A. Rasmussen - WGK *E. S. Tucker - So. 2nd GENERAL OFFICE D. Danna (2) \ *P. B. Hodges \ *F. 0. Hoizapfel \ R. M. Kountz \ *W. B. Papageorge \ *W. R. Richard *J. R. Savage Report No. 3 Job No., j Doto-- 44,67.m 8/20/71 ANNISTON PLANT J. T. Bell J. L. Corder J. L. Etheredge V. R. Haupt G. L. Jessee C. Landwehr/W. F. Taffee W. Miller /E. G. Wri ght Tltloi Aroclor Pollution Study Poroonnoli Ishmeal Ransaw (J. L. Brown) Problomi Evaluate the removal of Aroclor from the Anniston Plant effluent by adsorption JuatlfIcatlom Pollution Abatement Summaryi Solids-contact Clarifier Study Using Bentonite Cl ay Powdered bentonite (high silica) clay treatment of 204,430 gal. of plant waste water in a single stage solids-contact clarifier was evaluated in this pilot scale investigation. The efficiency of bentonite clay for removing Aroclor and coagulating inert suspended solids was evaluated at clay dosages of 15, 30, 120, 240 and 480 ppm and flows of 2.5 or 5 gpm. A cationic poly electrolyte dosage of 1.5 ppm was used throughout this phase of the study. Conclusions that can be drawn from this study are as follows: 1. Pilot plant influent averaged 360 ppb^ Aroclor and 55 jjpnr suspended solids during study. Single stage treatment with bentonite clays achieved an 86% reduc tion of Aroclor and an 80% reduction in suspended solids. Average residual Aroclor and solids concentra tions were 50 ppb and 11 ppm, respectively. A coagula tion system consisting of-^.15 ppm bentonite.xlay and Betz cationic polyelectrolyte 1170 was quite effective in removing suspended solids at flows' .of 2.5 and 5 gpm. "I ppb = parts per billion 2 pprrf = parts per millipn Appendix sections not included OS\N 552068 STLCOPCB4090485 Research and Development Report Job No. 446-514, Report No. 3 2. 2. 216,830 gal. of waste water was treated before blowdown. The solids in the overflow did not increase until the sludge pool had risen above the bottom of the center well. Better settling was achieved once the height of the sludge blanket was sufficient to enhance growth of the incoming floe. Steady state conditions for solids removal were generally reached after a 16-24 hour period. 3. Increasing the contact time and/or clay dosages n m A /l l I ^ A /I II A IAK (JI U U U UC U VCI ) small changes in effluent water quality. Soli-ds-contact Clarifier Study Using Powdered Carbon In a similar pilot scale study. Aqua Nuchar A activated powder carbon was used to treat 289,370 gal. of waste water. Test runs were made at carbon dosages of 25 and 50 ppm and flows of 2.5 and 10 gpm. 15-30 ppm bentonite clay and 1.5 ppm of Betz's Polymer 1170 or 3 ppm of Monsanto's RPC 926 `was used as coagulants. Conclusions that can be drawn from this study are as follows: 1. Pilot plant influent averaged 694 ppb Aroclor and 74 ppm sus pended solids during the pilot test. Single stage treatment, at a 2.5 or 10 gpm flow, with a 25 or 50 ppm dosage of powdered carbon achieved a 99% reduction of Aroclor in the filtered effluent. Average residual Aroclor observed for the filtered effluent was 5 ppb. Residual suspended solids concentration was 22 ppm at both carbon dosages (25, 50 ppm) and the 2.5 gpm flow. The average suspended solids level increased to 40 ppm for the same carbon dosages at a 10 gpm flow. 2. Unfiltered effluent averaged 20 ppb Aroclor while the filtered effluents averaged 5 ppb during the study. 3. The efficiency of removing Aroclor from the influent was better at the 2.5 gpm flow and the 50 ppm carbon dosage. 4. Effluent containing^20 ppm solids was obtained in a laboratory jar test using 15 ppm bentonite clay and 1.5 ppm Betz 1170 or 20 ppm clay and 3 ppm of RPC 926. This quality of effluent was not achieved in the pilot test although the rise rate in the clarifier did not exceed 50% of the bulk settling rate in the jar test. Reasons for the bad results is believed to be due to a combination of reduced residence in the reactor mix tanks and the mechanical breaking up of the floe. Recommendations: Based on the work contained in PR&D Report No. 2, Job No. 446-514 and the work contained in this report, I make the following recommendations: DSW 552069 STLCOPCB4090486 Research and Development Report Job No. 446-514, Report No. 3 That Aroclor be removed from waste streams that contain 60 ppm or less solids and Aroclor concentrations not exceeding 10,000 ppb by adsorption in a fixed carbon bed. That cost evaluations be made on the following schemes for removing Aroclor from waste streams that contain greater than 60 ppm of solids:. MO .~ (Tes; , ------- --- Ckr.^, O V4 Re.kc.xor. Cv_KR\fr\eR l?tVAOV lN& S'-uo&e. Wh.nd\.\hg (.KESMQ) ^ \nC\HC^Vt\On p k. `Stream -4 Co /Cv-(VV( ^Cmiohic \ e^e c."r B.o'.yTtb/ Po'^joe.w.'e.xj Cu.v.^oh Anwkhc ^.\_e.c_Tteon.'tt e FXP-'-UtVXT / Gs VAKNON-mG For. "'R.fcwsos KeocuOR & SVEnT C^RboH ^UK\- ^r\\.TeR (b^tt^CuKRCo^O) FXEVvYtWT dSW 552070 STLCOPCB4090487 Research and Development Report Job No. 446-514, Report No. 3 C. 4. 1 Doal PwjyeR (Sano \ Cwa^coal) E*=Fv_ue>*T CLafc\*\ER Pop. ^E^OViViG. kROCA-OR AuO ^OUO*o Future: 1. The sludge samples that were generated in both phases of this study have been sent to Dr. Phil Hayden (Monsanto's Envirochem, Dayton, Ohio) for the following tests: a. Thickening b. Dewatering c. Incineration These test results will be reported upon completion. DSW 552071 STLCOPCB4090488 Research and Development Report Job No. 446-514, Report No. 3 5. 2. The carbon removal phase of this study was not optimized because of vendor (Betz Lab, Eimco*) assurance that sufficient technology does exist for handling this phase of the work. A small amount of work with these vendors will be required for optimizing carbon removal and sizing the clarifier. /dp *Eimco Corp. , under a federal contract, recently completed a successful study at Salt Lake City, Utah using Aqua Nuchar A to treat secondary waste water. Gerry Shell was project manager. DSW 55207.2 STLCOPCB4090489 Research and Development Report Job No. 446-514, Report No. 3 6. Background: Anniston PR&D Report No. 1 (Job No. 446-514, 1/15/71) describes a process in which Aroclor is removed from the waste stream by both filtration of neutralization pit solids (on which Aroclor was adsorbed) and by adsorption of any residual Aroclor on the filtration media (carbon). In this original study, influent concentrations (100-8,000 ppb) were consistently reduced to <10 ppb upon passing through a four /\ 1i Vy ilnliwrhil Hw ii vsilmirwoWtoW pI vrnW lI nwim n ^/nam vrtovri l wtvnm a m hcrl ww m wHew nn thv i nfw 5w R l InV> r hI wewc **w wit>hi granular carbon) at flows of up to 350 cc/min. The presence of 200 1,000 ppm of inert solid particles (size 1.5 - 250^\set a maximum limit on the pressure and flow at which the unit could be operated. It was concluded from this study that 1. An evaluation should be conducted for removing Aroclor in a pilot adsorption unit, and 2. 4 Such a study should not be conducted on the plant stream with out some provision for removing solids. At that point it was determined that a solution to the Aroclor removal problem could be best reached by separating the study into two phases: (1) solids removal and (2) Aroclor removal. The Aroclor removal phase of the problem was resolved in a packed-bed pilot adsorption unit with activated granular carbon. PR&D Report No. 2, issued 4/15/71 under Job No. 446-514, covers this phase of the work. The solids removal phase had essentially a two-fold objective: remove solids and Aroclor simultaneously. As a result, this latest stlidy was divided into two phases : 1. Aroclor removal by adsorption on silica-type adsorbents followed by solids removal by flocculation-clarification. 2. Aroclor removal by adsorption on powdered carbon followed by solids removal by flocculation-clarification. The results' of these studies are contained herein. DSW 552073 STLCOPCB4090490 Research and Development Report Job No. 446-514, Report No. 3 7. Experimental : Part I. Aroclor Removal by Adsorption on Silica-Type Adsorbents Followed by Solids Removal by Flocculation-Clarification A. Flow Diagram B. Equipment . 1. Bentonite clay and/or carbon feed pump -- Hi 11s-McCanna, Model 16 metering pump. Capacity: 6.3 gph 2. Polymer feed pump 3. Mix tanks. The premix tanks for bentonite clay, poly electrolyte and coagulant-waste water were all constructed of carbon steel drums (40 gal. capacity); Each of the mix tanks, with the exception of the polymer tank, was equipped with Lightnin mixers (Model NC-4) turning at 1 ,725 rpm. 55tf*7* OSNN STLCOPCB4090491 Research and Development Report Job No. 446-514, Report No. 3 8. 4. Waste water and clarifier feed pumps. Ingersol1-Rand (Model C55-3222) centrifugal pump. Although this pump proved adequate for this phase of this study, it is not recommended for transferring this type of floe. It physically breaks up the floe. 5. Clarifier. A 2,300 gal. clarifier unit (8 ft. diameter by 4 ft. side) with a 5.5 ft. cone at the bottom. The unit contained a center well (2 ft . diame ter by 4ft.) ur draught tube whose bottom was at the base of the cone. The unit had 3 ports for sampling the sludge underflow. These ports were positioned in the following manner with respect to the draught tube. Port D -- 1 ft. above end of tube Port E -- At bottom of tube Port F -- 1 ft. below tube C. Solids Removal Studies Separate tests were conducted on the plant effluent at different levels (i.e, 100-1,000 ppm) of neutralization pit solids by Betz Lab and Denver Equipment. Their problem was to define a system that would simultaneously reduce solids, total organic carbon (TOC) and hopefully PCB levels. The results of these studies follow. 1. Betz Lab Coagulation Study After screening several coagulant and coagulant aids Betz's Lab concluded that an effluent contai ning ^-20 ppm solids and ^2 ppm TOC was best obtained using 15 ppm Bentonite clay and 1.5 ppm of Betz polyelectrolyte 1170. Most of Betz's tests centered around Bentonite clay be cause of its affinity for the organic carbon. 2. Denver Equipment Company Tests a. Coagulation Studies. The process developed here involved chemical coagulation with 400 ppm CaO and 10 ppm aluminum sulfate followed by the addition of 4 ppm of Dow's Separan M6L to enhance floe growth and settling. Calgon 230, Gamulose W and Nalco 675 all gave simi 1ar results to Separan MGL. OS\N 552.075 i | STLCOPCB4090492 Research and Development Report Job No. 446-514, Report No. 3 9. b. Froth Flotation Study. The best flotation effluent (i.e. containing 34.5 ppm solids) was obtained using 56 ppm of Armac T and 30 ppm of Aerofroth 65. Effluent samples were sent to the Anniston Lab for PCB analysis. As was found in previous batch tests as these, it was difficult to determine how much PGB had actually been removed by the floe. The Betz proposal was utilized in this phase of the pilot study because it was felt that Bentonite clay (AlgfSiO,), would provide surface area for the adsorption of PCB since previous testing had indicated the adsorption of PCB on glass and the silica type solids from the neutralization pit. Further, Monsanto's RPC 926 cationic polymer can be used in conjunction with Bentonite clay based on the work of Dr. Bruce Eley (Central Research) which indicates that similar PCB and solids removal to the Betz system are realized with ` coagulant concentrations of 20 ppm Bentonite clay and 3 ppm RPC 926. D. General Procedure Effluent from the plant stream was pumped at a controlled rate into the first of the two 40 gal. premix tanks equipped with Lightnin mixers. Into the same tank was metered, sub surface, 1.5 ppm of Betz's polyelectrolyte 1170 and "Vi 5 ppm of Bentonite clay. The flocculated slurry was then allowed to overflow into premix tank #2 where it was then pumped at a controlled rate into the clarifier. The flow through the clarifier is indicated by the arrows on the flow diagram. In fluent and effluent samples were caught at intervals at points A and C, respectively, and analyzed for Aroclor and suspended solids. The height of the sludge blanket in the clarifier was determined by taking samples'at points B, E and F (flow diagram). E. Sampling Three sets of influent and effluent samples (24 hour composite of 300 ml each) were taken by catching a 100 ml aliquot every 8 hours. One set of samples was taken for each of the follow ing analyses: 1. Liquid Aroclors (1221 , 1242, 1254 and 1260) 2. Solid Aroclors (5432, 5460) 3. Suspended solids Care was taken to avoid the contact of the sample with the plastic cap (known to adsorb PCB). DSW 552076 STLCOPCB4090493 Research and Development Report Job No. 446-514, Report No. 3 10. Coagulant Feed 1. Bentonite Clay. Powdered Bentonite clay (American Colloid Company, Skokie, 111.) was weighed into 37.9 gal. of city water with the vigorous agitation of a Lightnin mixer (1725 rpm). (A slurry concentration of 3% clay in water should not be exceeded for best pumpabi1ity.) The slurry was metered into the reactor mix tanks by a Hills-McCanna metering pump. Tests were run at 15, 30, 120, 240 and 480 ppm Bentonite clay concentration. These runs are tabulated in Tables I, II, III, IV and V. Final test runs were made at the 240 and 480 ppm clay concentration using one part by weight of American Colloid Bentonite clay and 3 parts by weight of Donoho clay (locally available clay containing 95+% Si0,,) to make up the total clay concentra tion. The Donoho cTay would not flocculate alone in the presence of the polyelectrolyte. The results of the final tests are tabulated in Tables VI and VII. 2. Polyelectrolyte. The desired quantity of Betz Polyelectro lyte 1170 (100% liquid) was weighed into 37.9 gal. of city water. The polyelectrolyte solution was metered into the reactor premix tanks at a controlled rate to maintain a 1.5 ppm polymer concentration. The polymer concentration i s cri ti ca1 . G. Flow Rate Previous adsorption studies with silica type adsorbents had indicated a slow adsorption rate of Aroclor on such adsorbents. So these tests were run at a 2.5 and 5 gpm flow to realize the maximum contact time practical with this system. At the 2.5 and 5 gpm flow this gave residence times of approximately 32 and 16 minutes, respectively, in the reactor premix tanks. H. Analytical Analysis 1. Aroclor. The Aroclor was extracted from the aqueous sample into a hexane solvent. Once extracted, the hexane solution was then dried and analyzed on a EC/GC. The con centration of Aroclors 1221, 1242, 1254 and 1260 was determined by comparing the main peak height of the unknown with the height of the same peak in the chromatographs of known Aroclor solutions of pure 1221, 1242, 1254 and 1260. The analytical results are tabulated in Appendix A. Aroclor concentrations are measured in parts per billion (ppb). An analytical method is presently being -devel oped for analyzing 5432 and 5460 in waste water. Samples of the tests described in this report have been retained for solid Aroclor analysis as this method development is completed. DSW 552077 ' STLCOPCB4090494 Research and Development Report Job No. 446-514, Report No. 3 11. 2. Suspended Solids. The concentration of suspended solids in each sample was determined by filtering a weighed sample of unknown through a filtering crucible of constant weight. The weight of the dried solid was determined and the solid concentration of the sample was calculated thus: , 4 wt. of solids X 106 Solids (ppm) = wt. sample The analytical results are tabulated in Tables I - VII, Appendix A. Discussion: Test Results. The results of the pilot run with respect to the removal of.Aroclor and suspended solids by primary f 1 occul ati on-cl ari f i-cation . are tabulated in Appendix B. During the pilot run, approximately 204,430 gal. of effluent (containing an average Aroclor concentration of 50 ppb and solids concentration of 11 ppm) was produced from influent waste water with average concentrations of 369 ppb Aroclor and 55 ppm suspended solids ' (Tables I - V). Results of tests (Tables VI and VII) in which Bentonite (American Colloid) and Donoho (high silica) clay were used in conjunction are similar to the results recorded for Bentonite clay (American Colloid) alone. Primary clarification with this coagu lation system is adequate for reaching the desired solids level and reducing the PCB level to a somewhat constant level (50 ppb), but it was not sufficient for obtaining the desired PCB quality (i.e.^10 ppb). Process Parameter: A. Influent Water Quality. All the tables in Appendix A show a wide variation in the Aroclor levels of the influent. The Aroclor levels of the effluent show a corresponding relation ship to the Aroclor levels of the influent. B. Clay Concentration, Flow Rate and Contact Time. Varying these parameters during the course of the study produced very small changes in the effluent Aroclor quality. The efficiency of solids removal was adequate (20 ppm) over all clay concentra tions and flows. C. Loading Capacity. The loading capacity of Bentonite clay is very small. For an illustration consider the data in Table I. Here eight (8) pounds of Bentonite clay was used to remove approximately 0.145 pound of Aroclor. This gives a loading of 1.6%. The loading capacity is even less for the data in Table V. This loading factor could be greater if the TOC of the effluent had been considered. DSW 552078 STLCOPCB4090495 Research and Development Report Job No. 446-514, Report No. 3 12. D. Temperature. Temperature was not a big factor in this phase of the study. It was observed, however, that the dissolved solids level increased during periods in which large quantities of acid (HC1) were being sewered. The temperature, which reaches 50C during prolonged periods of sewering acid, could cause a future dissolved solids problem. Part II. Aroclor Removal by Adsorption on Powdered Carbon Followed h \/ 9nlirlc Remov/al by FI rtrrnl a nn- PI a v>i f i ratinn W WWW I U W I S/ll W I U I I I I t* U I WII Experimental: A. Flow Diagram - Same as Part I B. Equipment - Same as Part I C. Carbon, Pit Solids Removal Evaluation by Jar Test 1. Equipment a. Mixer - Variable speed between 20-100 rpm. b. Container - One liter plus cylinder (3 in. I.D. X 12 in. ) c. Sampling apparatus - 100 ml pipette 2. Chemicals a. Waste water with varying levels of solids (1001,000 ppm) b. 500 ppm solutions of: (1) Betz polyelectrolyte 1170 (liquids in free state) (2) RPC 926 (liquid in free state) (3) Hercules Hercufloc 814.2 (solid in free state) c. 500 ppm agitated slurry of Bentonite clay d. Westvaco's Aqua Nuchar A powdered carbon 3. Procedure One liter of the plant effluent (with a solids level be tween 100-1,000 ppm) was added to the cylinder equipped with a variable speed agitator. To this container was DSW 552079 STLCOPCB4090496 Research and Development Report Job No. 446-514, Report No. 3 13. added 0,0500 gm of Aqua Niichar A carbon to make up a solution of 50 ppm carbon. The slurry was then agitated vigorously for 2 minutes. The speed was then reduced to 50 rpm. Then 0.30 or 0.40 ml of clay was added, followed by the addition of 1.0, 3.0 or 6.0 ml of one of the poly electrolyte solutions (Betz 1170, RPC 926 or Hercufloc 814.2). After 4 minutes of agitation at 50 rpm, the agitator was removed and the floe was allowed to settle 6 minutes. Then 100 ml of solution was pipetted from the reaction- mass about 3 inches below the surface of the . 1iquid and analyzed for sol ids. 4. Results These jar tests were run mainly to see what flocculants gave the best results on a comparison basis rather than to actually size a clarifier. The following summary gives some details on how these flocculants compare against . certain properties: ' Betz 1170 -- Critical concentration is 1.5 ppm. Floe is dense and fluffy. Floe grows and settles more rapidly as the Bentonite clay concentration is increased. It will not flocculate without the clay. The floe occupied less than T% of the total volume after 6 minutes settling. Effluent clarity is good after 6 minutes settling (<120 ppm solids). RPC 926 -- Critical concentration is 3 ppm. Floe is fine. Floe growth and settling is improved as the clay concentra tion is increased. It will not flocculate in the absence of clay. The floe occupied 50% of the total volume after 6 minutes settling. Effluent clarity is poor after 6 minutes settling but improves with time. Hercufloc 814.2 -- Critical concentration is 0.5 ppm. Floe is dense and fluffy. Floe grows and settles more rapidly as the clay concentration increases. Flocculates in absence of clay. The floe with or without clay occupies 0% of the total volume after 6 minutes settling. Effluent clarity is good, Hercufloc was superior to RPC 926 and Betz 1170. Bentonite clay and RPC 926 and Betz 1170 were chosen as coagulants for this study because of the handling difficulties ex perienced using the solid polymer Hercufloc 814.2. This compound is difficult to solubilize. DSW 552080 STLCOPCB4090497 Research and Development Report Job No. 446-514, Report No. 3 14. General Procedure: The procedure described in Part I was kept basically the same for this phase with the exceptions of the following changes: T. Carbon and clay feed and concentration. 2, The sampling technique was partially altered. All changes in the general procedure are discussed in more detail below. A. Sampling The sample load was increased to 8 for this study. The two additional samples were effluent samples from the reactor mix tanks (sampling point B, flow diagram) and the clarifier. Both of these samples were filtered with filter paper (What man 1). The filtrates were analyzed for liquid Aroclor. The `sample taken for solid Aroclor (5432 and 5460) analyses was likewise filtered. Influent sampling technique, sample size and rate were not altered from that described in sampling section , Part I. B. Flow Rate Previous experience had indicated a rapid adsorption rate of Aroclor on carbon. Initial plans were to obtain trial data at a 5 gpm flow, then increase the flow to 10 gpm (i.e. hy draulic limit of this system). The solids in the overflow, however, exceeded the set limit of 20 ppm at this flow. Flow was then decreased to 2.5 gpm in an effort to optimize con ditions for removing carbon from the overflow. A better quality of effluent was realized by increasing the clay con centration to 30 ppm (Tables I and IT, Appendix B). After operating at these conditions, the flow was then increased to 10 gpm where the study was completed. C. Carbon-Clay Feed and Concentration The desired carbon 1 and clay 2 quantity was weighed into the same agitated mix tank and metered simultaneously into the reaction zone. Tests were run at a 25 and 50 ppm carbon con centration. The clay concentrations were varied at a 15, 20, or 30 ppm level in an effort to optimize coagulant concentra tions for maximum solids removal. "I Westvaco's Aqua Nuchar A powdered carbon ^ American Colloid Bentonite clay, Skokie, 111. DSW 552081 STLCOPCB4090498 Research and Development Report Job No. 446-514, Report No. 3 15. Polyelec-trolyte feed concentration -- Polyelectrolytes 1170 and RPC 926 -- were fed in the same manner as in Part I. Betz 1170 was fed into the reaction zone at a 1.5 ppm concen tration and RPC 926 at a 3 ppm concentration. The effect of the two polyelectrolytes on solid removal is seen in Tables V and VI. Piscussion: A. Test Results The data recorded in Tables I, II, III, IV, V and VI, Appendix B, describes the performance of a single stage contacting unit for removing Aroclor and solids from the plant waste stream. In each table, there is tabulated the volume of effluent treated and the average suspended solids and Aroclor concentra tions in the influent and effluent after the reactor mix tanks `and the clarifier. Carbon, at both a 25 and 50 ppm concentra tion, was effective in reducing the Aroclor in the filtered effluent to the desired level (10 ppb) at both flows (2.5 and 10 gpm), The desired solids level (20 ppm) was realized at both carbon concentrations at the 2.5 gpm flow (Tables I and II). Solids in the overflow far exceeded the 20 ppm level at the 10 gpm flow for both carbon concentrations (i.e. 25 and 50 ppm). See Tables III, IV, V and VI. B. Process Parameters 1. Influent Water Quality. The average Aroclor level of the waste water fluctuated between 300-1,300 ppb during the pilot test. The solids level was fairly constant except during times of prolonged periods of rainfall and/or when acid was being sewered. High influent Aroclor level generally corresponded to slight increases in Aroclor of the effluent. This fact is more evident (see Table III) at low Aroclor concentration (25 ppm) and high flow (10 gpm). The effect of the influent solids level was not defined at the maximum flow and carbon concentration. There was no apparent effect on the total effluent quality at either carbon concentration (25 or 50 ppm) and the 2.5 gpm flow. 2. Flow Rate, Contact Time. At the 2.5 and 10 gpm flow, the contact time in the reactor mix tanks were 32 and 8 minutes, respectively. The effect of contact time is not apparent at the high carbon concentration (50 ppm) and flow (10 gpm). The effect of contact becomes more apparent when the effluent Aroclor quality (after the reactor mix tanks) is compared at the 25 ppm carbon level for both the high and low flow. (See Tables II and III.) oSVM S5*>W STLCOPCB4090499 Research and Development Report Job No.< 446-514, Report No. 3 16. 3. Carbon Concentration. The comparison of the results of Tables III and IV indicates that the Aroclor is better adsorbed at the 50 ppm carbon level. Results contained in Tables I and II suggest the Aroclor can be effectively removed at both carbon concentrations with ample contact time. The 50 ppm concentration is more effective in this system because a slight excess of carbon is necessary to overcome the factors which affect the kinetics and equilibrium of adsorption as solids and other organics in the plant stream. 4. Solids in the Overflow. By comparing the Aroclor levels of the filtered and unfiltered effluents in Tables III and IV, it is evident that Aroclor is being carried over with the solids in the overflow. Aroclor removal can only be optimized where the solids level is less than 20 ppm (Tables I and II). The solids in the overflow exceeded the 20 ppm level at the high flow rate (10 gpm) and any carbon level. The following changes were made, without significant improve ment, in an effort to improve the settling in the clari fier: a. The clay concentration was increased to 30 ppm to weight the floe. b. The clarifier was operated with essentially no sludge blanket and with the blanket at the bottom or slightly above the bottom of the center well (see Tables V and VI) . In Table VI the solids level in overflow gradually increased as the height of the sludge blanket increased. Even after blowdown, the sludge blanket quickly rose and remained in the free clarification zone. This observa tion suggested that the floe was very light. In an effort to determine the cause for the very fine floe being produced, a sludge sample was taken, slowly agitated 4 minutes and allowed to settle. The floe settling rate was comparable to that observed in the lab jar test. Since the rise rate (0.3 gpm/ft2) in the clarifier did not exceed 50% of the bu1K settling rate, it was concluded that the floe was being mechanically broken up (not sheared) by the high speed agitator and centrifugal pump, and that there was not enough agitation or time in the center well for the floe to reform. ~ 5. Carbon Loading Capacity. During the pilot test 289,370 gal. waste water was treated with 114 pounds of carbon to remove an average of 2 pounds of Aroclor. This gives a carbon DSW 552083 STLCOPCB4090500 Research and Development Report Job No. 446-514, Report No. 3 17. loading of 2%. This does not take into consideration the other TOC also being adsorbed by the carbon. 6. Blowdown Rate. This parameter was not defined. /dp Ai , _u . .. .j ji v. i a/ 1L Ishmeal Ransaw ACKNOWLEDGEMENT -- I wish to thank Mr. Don Turner, Analytical Lab Technician, who conducted all Aroclor analyses for this study. Further, I wish to extend gratitude to all the personnel of the Analytical Lab who helped to monitor the pilot operation during off-shift and run the suspended solids samples. OS\N 5628A STLCOPCB4090501 APPENDIX A AROCLOR REMOVAL FROM WASTE WATER BY ADSORPTION ON SILICA- TYPE ADSORBENTS FOLLOWED BY FLOCCULATION-CLARIFICATION i DSW 552085 STLCOPCB4090502 TABLE I AROCLOR REMOVAL B_Y FLOCCULATION CLARIFICATION Test Conditions: Clay cone, in feed - 15 ppm Polymer cone, in feed - 1.5 ppm Flow through clarifier - 5 gpm Avg. Influent Concentration Volume T reated (qal. ) 9,000 16,800 25,800 41,600 48,800 52,400 57,600 64,800 Sus pended Solids (ppm) A-1260 or A-1221 A- 1242 A-1254 446 240 70 22 16 - - 210 60 - - 29 100 14 196 38 - - 52 146 30 - - 40 560 7 - 14 105 28 - - Avq. Effluent Concentration Sus pended Solids (ppm) A-1221 A-1242 A-1254 31 11 6 15 23 - - NDA 1 -- 18 72 8 -- 100 10 - - 2 no 12 - - 11 66 6 -- 2 58 9 - - Avg. Influent Con?, for Test: Total Aroclor - 286 ppb Suspended Solids - 34 ppm Avg. Effluent Cone, for Test: Total Aroclor - 53 ppb Suspended Solids - 8 ppm DSW 552086 STLCOPCB4090503 TABLE II AROCLOR REMOVAL BY ADSORPTION-FLOCCULATION Test Conditions: Avg. flow - 5 gpm Bentonite clay concentration in feed - 30 ppm Betz polymer 1170 in feed - 1.5 ppm Average Daily Influent Concentration Average Daily Effluent Concentration Volume T reated (gal-) 1,500 Sus pended Solids (ppm) A -1221 A -1242 A-1254 24 86 18 -- Sus pended Solids (ppm) 50 A- 1221 A- 1242 A-1254 41 7 - - 13,200 46 320 40 -- 7 64 5 - - 20,400 314 236 117 -- 8 19 15 - - 27,600 65 146 54 -- 10 63 7 -- 34,800 13 290 160 -- 3 88 7 - - 42,000 9 154 10 -- 5 17 4 - - 49,200 38 73 25 -- 22 25 4 - - Avg. Influent Cone. for Test: Total Aroclor - 247 PPb Suspended Solids - 73 ppm Avg. Effluent Cone . for Test: Total Aroclor - 52 ppb Suspended Solids - 15 ppm DSW 552087 STLCOPCB4090504 TABLE III AROCLOR REMOVAL BY ADSORPTION-FLOCCULATION Test Conditions: Clay concentration in feed Polymer concentration in feed Flow to clarifier 120 ppm 1.5 ppm 5 gpm Avq. Influent Concentration Avq. Effluent Concentration Volume T reated (qal. ) Sus pended Solids (ppm) A-1221 A-1242 A -1254 Sus pended Sol i ds (ppm) A-1221 A-1242 A-1254 1 ,650 480 380 -- 80 30 -- 8,850 16,050 * 210 13 - 52 42 - - - , 6 2- 11 9 -- 18,450 174 170 -- 9 6 - 25,210 490 290 -- 69 18 - 32,410 63 530 310 -- 12 71 25 - 39,610 12 102 58 - - 4 78 21 - 46,810 TOO 440 150 __ 6 80 9 . -- Avg. Influent Cone, for Test: Suspended Solids - 58 ppm Total Aroclor - 486 ppb Avg. Effluent Cone, for Test: Suspended Solids - 7 ppm Total Aroclor - 66 ppb 0S1N 588 STLCOPCB4090505 TABLE IV AROCLOR REMOVAL BY ADSORPTION-FLOCCULATION Test Conditions: Flow to clarifier - 2.5 gpm Clay concentration in feed - 240 ppm Polymer concentration in feed - 1.5 ppm Avg. Influent Concentration Avg. Effluent Concentration Volurne Treated (qal.) Suspended Sol i ds (ppm) A- 1221 A-1242 A-1254 Sus pended Solids (ppm) A-1221 A-1242 A-1254 3,600 18 42 75 - - 12 17 5 - 7,200 * 55 490 590 -- 9 64 14 - 1.0,800 16 80 37 - - 2 46 3 - 11 ,000 33 23 -- 8 NDA -- Avg. Influent Cone. for Test: Total Aroclor - 343 ppb Total Suspended Solids - 30 ppm Avg. Effluent Cone, for Test: Total Aroclor - 39 ppb Total Suspended Solids - 8 ppm DSW 552089 STLCOPCB4090506 TABLE V AROCLOR REMOVAL FROM WASTE WATER BY ADSORPTION-CLARIFICATION Test Conditions: Flow to clarifier - 2.5 gpm Clay cone, in feed - 480 ppm Polymer cone, in feed - 1.5 ppm Avq. Influent Concentration Volume Treated (qal.) Sus pended Solids (ppm) A- 1221 A -1242 A-1254 2,250 . 118 5,850 169 180 68 - 470 63 - - 9,450 163 114 -- 13,050 11 960 760 -- 16,650 23 94 60 - - 20,250 28 .68 11 -- 23,620 56 88 73 - - 26,620 48 590 570 -- *29,620 59 117 149 -- *32,620 68 150 79 - - Avq. Effluent Concentration Sus pended Sol i ds (ppm) A-1221 A-1242 A- 1254 55 24 NDA -- 28 57 3 - - 41.3 43 5 -- 8 57 4 - - 8 26 NDA -- 12 14 1 - - 1 9 6 -- 1 34 29 - - 6 NDA 15 - - 7 42 3 - - Avg. Influent Cone. for Test: Total Aroclor - 483 ppb Suspended Solids - 64 ppm Avg. Effluent Cone, for Test: Total Aroclor - 37 ppb Suspended Solids - 17 ppm *The sludge blanket was approximately 1 ft. from the end of the draught tube. Mechanical difficulties plagued the system for. a two day period: occasional shutdowns were experienced during this period. DSW 552090 STLCOPCB4090507 TABLE VI AROCLOR REMOVAL FROM WASTE WATER BY ADSORPTION-CLARIFICATION Test Conditions: Flow to clarifier - 2.5 gpm Clay cone, in feed - 120 ppm Bentonite clay, 360 ppm local clay (95% silica) Polymer cone. in feed -1.5 ppm Avq. Influent Concentration Avq. Effluent Concentration Volume Treated (qal . ) 2,400 Sus pended Solids (ppm) 85 A-1221 A- 1242 A-1254 100 27 NDA Sus pended Solids (ppm) A-1221 A- 1242 A-1254 3 37 NDA NDA 5,200 37 200 64 NDA 17 50 4 NDA 8,800 148 44 NDA 8 3 NDA 12,400 42 63 34 NDA 1 5 NDA NDA Unit was shut down for blowdown. Sludge blanket was at the end of the draught tube. Avg. Influent Cone, for Test: Total Aroclor - 170 ppb Suspended Solids - 55 ppm Avg. Effluent Cone, for Test: Total Aroclor - 27 ppb Suspended Solids - 7 ppm OSIN 552091 STLCOPCB4090508 TABLE VII AROCLOR REMOVAL FROM WASTE WATER BY ADSORPTION-CLARIFICATION Test Conditions: Flow to clarifier - 2.5 gpm Clay cone, in feed - 60 ppm Bentonite clay + 180 ppm local cl ay Polymer cone, in feed - 1.5 ppm This test was run with essentially no sludge blanket. Avg, Influent Concentration Avq. Effluent Concentration Volume Treated (gal . ) Sus pended Solids (ppm) A- 1 221 A-1242 A-1254 Sus pended Solids (ppm) A- 1221 A-1242 A- 1254 3,300 37 74 18 NDA 30 16 3 NDA 6,900 48 190 37 NDA 13 56 2 NDA 10,500 66 780 640 NDA 17 21 7 NDA 14,100 69 80 40 NDA 23 21 6 NDA Avg. Influent Cone. for Test: Total Aroclor - 465 ppb Suspended Solids - 55 ppm Avg. Effluent Cone, for T e s t: Total Aroclor - - 3 ppb Suspended Solids - 21 ppm 0S>N 552092 STLCOPCB4090509 4 APPENDIX B AROCLOR REMOVAL FROM WASTE WATER BY ADSORPTION ON POWDERED CARBON FOLLOWED BY FLOCCULATION-CLARIFICATION DSW 552093 STLCOPCB4090510 *. TABLE I AROCLOR REMOVAL FROM WASTE WATER BY ADSORPTION ON POWDERED CARBON FOLLOWED BY FLOCCULATION-CLARIFICATION Test Conditions: Flow - 2.5 gpm Carbon cone. - 50 ppm , Volume Treated (gai ) 3,150 7,800 Average Influent Au_u___n___c___e__ xn_[__r__ajt. io_n___s__ Susp. Aroclor Solids (ppb) (ppm) 1221 1242 113 650 510 42 106 86 Unfiltered Effluent *____ tone. /p/%l^an ner \j Susp. Aroclor Solids (ppb) (ppm) 1221 1242 28 2 3 19 NDA NDA Filtered Effluent l/ mu.^i ari.*r.i er vj Aroclor Aroclor (Mix Tank) (Clarifier) 1221 1242 1221 1242 NDA NDA 2 4 NDA NDA NDA NDA 12,900 3 88 72 20 NDA NDA NDA NDA NDA NDA 15,300 2 45 18 22 NDA NDA NDA NDA NDA 4 17,700 2 97 100 20 NDA 2 1 4 NDA 3 Avg. Inf. Solids 32 ppm vg. Inf. Aroclor Cone. 354 ppb Avg. Eff. Solids 22 ppm Avg. Eff. Aroclor Cone. 1 ppb Avg. Eff. Aroclor Cone. 1 ppb Avg. Eff. Aroclor 2.6 ppb 00 STLCOPCB4090511 TABLE II AROCLOR REMOVAL FROM WASTE WATER BY ADSORPTION ON POWDERED CARBON FOLLOWED BY FLOCCULATION-CLARIFICATION Test Conditions: Flow - 2.5 gpm Carbon cone. - 25 ppm Volume Treated (gal . ) Average Influent Concentrations Susp. Aroclor Solids (ppb) (PPm) 1221 1242 Unfiltered Effluent Cone. (Cllarifier) Susp. Aroclor Solids (ppb) (PPm) 1221 1242 Filtered Effluent (Clarifier) Aroclor Aroclor (Mix Tank) (Clarifier) 1221 1242 1221 1242 1,800 78 44 22 4,800 73 82 20 NDA NDA NDA NDA NDA 2 19 NDA NDA NDA 4 15 8,400 50 560 430 23 23 16 48 11,400 12 350 300 19 2 2 NDA 3 NDA 4 15,000 36 840 630 23 44 33 23 Avg. Inf. Solids 44 ppm Avg. Inf. Aroclor Cone. 666 ppb Avg. Eff. Solids Cone. 21 ppm Avg. Eff. Aroclor Cone. 3 ppb Avg. Eff. Aroclor Cone. 4 ppb Avg. Eff. Aroclor Cone. 6 ppb os* ^ STLCOPCB4090512 TABLE III AROCLOR REMOVAL FROM WASTE WATER BY ADSORPTION ON POWDERED CARBON FOLLOWED BY FLOCCULATION-CLARIFICATION Test Conditions: Flow - 10 gpm Carbon cone. - 25 ppm Volume T reated (qal . ) Average Influent Concentrations Susp. Aroclor Solids (ppb) (ppm) 1221 1242 Unfiltered Effluent Cone. (Clarif1er) Susp. Aroclor Solids (ppb) (ppm) 1221 1242 Filtered Effluent (Clarifier) Aroclor Aroclor (Mix Tank) (Clarifier) 1221 1242 1221 1242 12,000 16 250 2 00 97 43 74 2 3 47 24,000 112 420 280 27 26 35 2 4 NDA 3 31,200 106 410 170 21 9 5 NDA NDA NDA NDA 45,600 255 900 650 29 10 8 9 6 NDA 1 57,000 346 2 40 32 0 19 8 11 3 N DA NDA NDA Avg. Inf. Solids Cone. 167 ppm Avg. Inf. Avg. Eff. Aroclor Solids Cone. Cone. 768 ppb 37 ppm Avg. Eff. Aroclor Cone. 46 ppb Avg. Eff. Aroclor Cone. 6 ppb Avg. Eff. Aroclor Cone. 3 ppb DSW 552096 STLCOPCB4090513 TABLE IV AROCLOR REMOVAL FROM WASTE WATER BY ADSORPTION ON POWDERED CARBON FOLLOWED BY FLOCCULATION-CLARIFICATION Test Conditions: FI ow - 10 gpm Carbon cone. - 50 ppm Volume T reated (qal . ) Average Influent Concentrations S us p. Aroclor Solids (ppb) (ppm) 1221 1242 Unfiltered Effluent Cone. (Clarifier) Susp. Aroclor Solids (ppb) (ppm) 1221 1242 Filtered Effluent (Clarifier) Aroclor Aroclor (Mix Tank) (Clarifier) 1221 1242 1221 1242 14,400 170 590 340 37 7 14 6 3 NDA 1 28,800 55 246 234 30 4 4 NDA NDA NDA 5 43,200 55,000 5 345 250 4. 143 2 ,050 1,800 39 4 8 NDA NDA NDA 2 10* 63 38 NDA NDA NDA NDA 68,200 17 440 630 60 NDA 5 NDA NDA NDA NDA 80,000 162 280 480 28 NDA 4 NDA NDA NDA NDA Avg. Inf . Avg. Inf. Solids Aroclor Cone. Cone. 92 ppm 1,281 ppb Avg. Eff . Solids Cone. 33 ppm Avg. Eff. Aroclor Cone. 25 ppb Avg. Eff. Aroclor Cone. 2 ppb Avg. Eff Aroclor Cone. 1 ppb *Seems out of line. DSM\f 552097 STLCOPCB4090514 TABLE V AROCLOR REMOVAL FROM WASTE WATER BY ADSORPTION ON POWDERED CARBON FOLLOWED BY FLOCCULATION-CLARIFICATION Test Conditions: Flow - TO gpm Carbon cone. - 50 ppm Clay cone. - 20 ppm RPC 926 - 3 ppm Sludge blanket at bottom of launder tube Volume Treated (qal . ) Average Inf1uent Concentrations Susp. Aroclor Solids (ppb) (ppm) 1221 1242 Unfiltered Effluent Cone. (Clarifier) Susp. Arocl or Solids , (ppb5 (ppm) 1221 1242 Filtered Effluent ( Cl ari f i er) Aroclor Aroclor (Mix Tank) (Cl ari f i er) 1 221 TWZ 1221 1242 12,000 14 1 28 48 48 6 7 5 NDA 4 1 26,400 59 870 63 71 38 21 10 NDA 12 5 38,400 186 370 340 62 12 6 NDA NDA 8 2 Avg. 86 ppm Avg. 606 ppb Avg. 60 ppm Avg. 30 ppb Avg. 5 ppb Avg. 11 ppb DSW 552098 STLCOPCB4090515 r TABLE VI AROCLOR REMOVAL FROM WASTE WATER BY ADSORPTION ON POWDERED CARBON FOLLOWED BY FLOCCULATION-CLARIFICATION Test Conditions: Same as Table V, except sludge blanket was zero. Volume Treated (qal. ) Average Influent Concentrations Susp. Solids (ppm) Aroclor (nnb) * r i--------------------/ 1221 1242 Unfiltered Effluent Cone. (Clarifier) Susp. Aroclor Sol i ds (PPm) S(\ nr nr h~ t 1221 1242 Filtered Effluent (Clarifier) Aroclor ! Aroclor fMiy Tank! T22T 1242 ( f" Vaifi f i ov>^ l W 1 1* 1 II 1 V 1 / 1221 JT242 50,400* 430 84 26 13 2 NDA 17 5 Solids removal did not improve in the absence of the slurry pool . RPC 926 was replaced at this point with Betz's 1170 polymer. 54,870 69,270 400 84 * 30 420 400 3 5- - -- -- 9 34 7 6 NDA 2 NDA 81,270 25 700 140 29 19 NDA NDA NDA NDA NDA 93,270 6 92 55 34 3 NDA NDA NDA NDA NDA 105,270 10 260 40 36 4 2 NDA NDA 5 NDA 119,670 48 192 102 46 85 9 482 Avg. 24 ppm Avg. 488 PPb Avg. 31 ppm *Carbon feed dropped to 25 ppm. Avg. 16 ppb Avg. 5 ppb Avg. 3 ppb DSW 552099 STLCOPCB4090516