Document 7MZ8y4r90YXYKEM1GrazZ7YD6
90-2104
nter-office memo TENNECO CHEMICALS, INC.
To J. T. Sweeney
From w. R. Smickle
Subject yCM Control Report Period: 6/28 - 7/4/82
At Fleraington At Fleraington
Date July 9, 1982
PVTO R. A. Donovan J. E. Durant W. R. Fogelsanger F. W. Kanzler H. R. Horton R. A. Loj ewski W. Miringoff S. P. Robbins M. K. Rosen G. 1. Rozand D. I. Scofield
Area
VCM Average Level
Reactor Building
0.3
Recovery Comp. Room
1.0
General Area
<^0.1
Pilot Plant
0.1
Parshall Flume
0
% y1 ppm
3.4 14.9
0.07 1.3 0
Number y^lOO ppm 0 0 0 0 0
WRS:ms
012218
90-2184
nter-office memo TENNECO C H E SVM C A L S, INC
To W. R. Smickle
From j. E. Durant
Subject ycM Control Report Period: 6/28 - 7/4/82
at Flemington At Flemington
Date July 9, 1982 Copy to p, R. Bisson
Attached is a summary of the Flemington Plant VCM levels as determined by the Computerized Area Monitoring System for the week of June 28, 1982 to July 4, 1982.
JEDrms
J. E. Durant
0122:7
TABLE I AREA MONITORING SYSTEM - FLEMINGTON
Weekly Summary Period: 6/28 - 7/4/82
Number of Reading s & Percentagi
Area
AVERAGE PPM,VCM
Reactor Bldg.
0.3
Recovery Comp. Room 1.0
General Area
<0.1
Pilot Plant
0.1
Parshall Flume
2
Total Samples 12,096
1,344 6,720 5,376
672
ZA
N%
ZA
N%
415 3.4 281 2.3
200 14.9 125 9.3
5 0.07
1 0.01
70 1.3
30 0.6
00
00
725 N '%' 1 0.01
00
00 1 0.02
00
"Z ioo
N%
00 00 00 00 00
JED: ms
J. E. Durant
012218