Document 7MRVakpr02rjnqQ8Evr9n5278

uCHEMICALS ij INDUSTRIES INTEROFFICE / LAKE CHARLES TO A.J. Beatrice FROM C.W. Arnett DATE November 17, 1982 SUBJECT Docking and Handling Fees for Vessels Not Transporting Cargo for PPG The following fees and rates should be used for all vessels using PPG dock facilities when cargo is not being transported for PPG. Docking and Sailing Fee Hose Hook-up and Disconnect Pumping Time Guard Time Terminal Operator (Refrigerated VCM only) Independent Gauger $550.00 $250.00 $80.00/hr $25.00/hr $27.00/hr $350.00 attachment cc: file w/attachment (VCM Ship Loading) 1022617 Attachment The following is the times and number of opeple to compute the hourly rates and feew. Overhead was figured at 1005S. Docking and Sailing - 2 1/2 to 3 hours 1 Lead Tankerman 2 Tankermen 2 Tankerman Helpers $14.93 X 3 = $14.41 X 6 = $13.24 X 6 Overhead g 100$ $550.00 $ 44.79 86.46 79.44 $210.69 210.69 $421.38 Hose Hook-up and Disconnect $250.00 Based on VCM - 1 1/2 to 2 hours actual time 1 Lead Tankerman $14.93 X 1.5 = $ 22.40 1 Tankerman $14.41 X 1.5 = 21.62 1 Tankerman Helper $13.24 X 1.5 = 19.88 $ 63.58 Overhead @ 100$ 63.88 $127775 SL 102268