STANDARD OIL COMPANY OF TEXAS' ENGINEERING " DEPARTMENT !- SAN'FRANCISCO
SPECIFICATION-NO. MARCH 15* 1968 SECTION, NOc 3 ; PAGE 1
E-2691:
SECTION'3 - PERFORMANCE OF WORK
3i01 WORK SPACE AND STORAGE AREA
COMPANY Will; assign space, in the area shown on Drawing.i
' GT-A-2I43Q for CONTRACTOR0S office, work space, and
storage .`area,, ...
.
_ COMPANY can make availablefor thefabrication of tthe : > precast stanchions, a work .area other than the South Work Area, if CONTRACTOR so ides ires,
3i'02 'TEMPORARY CONSTRUCTION' FACILITIES
; 3,021 CONTRACTOR shallisupply and install 'all- temporary facilities required for the prosecution rdfphis ,
' wofki ihCIudihg, . but-not . limited to,- tool " rck^s,- , . locker rooms, toilets, office and storehoose^^ AllM . temporary installations shall be subject to approval;
by-COMPANY prior to installations -
3.022 In addition, CONTRACTOR shall-.provide :as required ......... for completion of ;.the:: job any -temporary equipment; and/or material. including, but not-limited to, .
shoring, concrete forms,: bracing, laddersj . scaffolding, staging, drop cloths and tarpaulins,: .:
3.023 CONTRACTOR shall -maintain all . temporary
!
installations, . including .'the :vapor barriers installed
by others, in a safe and adequate manner an&remove:
them immediately upon completion of * the work,
-
3 = 03 SURVEYING. .
..
;.
- 3 ,631 CONTRACTOR shall^perform:all- surveying necessary from: base lines - arid bench marks established by. COMPANY, . The accuracy, for all grades,; elevations, arid? plumbing of any structures and location *of facilities described in this Specification shall be rfche-responsibility of-the CONTRACTOR,/
CHEV BB 0002685
STANDARD OIL I COMPANY OF TEXAS ENGINEERING . DEPARTMENT SAN; FRANCISCO
SPECIFICATION/NO,. E-2691h MARCH 15e 1968 ' SECTION NOW 3 PAGE 2
. 3,032 CONTRACTOR shall preserve all"permanent survey.
- monuments and bench marks, ; In the revent-CONTRACTOR : disturbs - any permanent 'monuments or bench: marks
they will be replaced by a Land. Surveyor acting under COMPANY S. ins tractions ; - replacement cost; will be; deducted from the sums -due or to become due:the CONTRACTOR,,
3.04 EXCAVATION AND BACKFILL
........................................
.
Earthwork shall be :in accordance with applicable rparagraphs
of .^Specification EGt-581, . CONTRACTOR shall rhaul f.ariy
.'
excess, excavated material to a;.}location designated. by
COMPANY* S Construction Representative , : Such location
Will. be .within 559=0^ feet -of the ; job - site,,- and-within
- Refinery, limits,:'
3,05 GRADING
........
......
- CONTRACTOR shall return area grades as shown: on the : `
: drawings, .: Finish grading .shall- be as -described in Section -
' 4;wl2I;t'b#Vhis Specification,
...
..
3, 06 ~f MATERIALS HANDLING I AND- CORRESPONDING ; PAPER WORK :
|
3,061 CONTRACTOR shall receive from-any one of several
storage areas located on COMPANY'S premises the :
material: and equipment furnished by. COMPANY and
required for the.work described.in Section 1,1 of
this Specification, Shy material;and, equipment .
listed on ;.the. Equipment'List-Drawing . GT-D-21601
arriving after CONTRACTOR has commenced work Shall
be received and unloaded by CONTRACTOR from: trucks -
or rail cars,..............
..
i.
/3,062. CONTRACTOR0 S ! requests- for' withdrawal of COMPANY furnished material`and equipment-shall :be based on-, quantities. shown - on drawings or Lists of Materials furnished by COMPANY, . CONTRACTOR shallobtain . approvalhfrom COMPANY" S ' Construction -Representative :
i before materials in - excess of the quantities shown on the .drawings or Lists of Materials will be
.issued.
CHEVBB 0002686
STANDARD OILi COMPANY OF TEXAS ENGTNEERINGl DEPARTMENT i- SAN- FRANCISCO
SPECIFICATION. NO. .E^2S9Ih MARCH.15, 1968 SECTION NOo 3 PAGE 3
3 = 063 Subject 'to Section 5y3 of the 'Terms`and Conditions CONTRACTOR shall (a! be responsible:for keeping
all /material j and equipment - in good condition^ until the completed facility is accepted by COMPANY,l by 11) talcing any necessary steps isuch as painting,., greasing,/! installation of rust -preventive /oilier covering,; etc. , to . .protect . .all /.equipment" externally arid internally from./mechanical / damage or damage . .
from the-:elements,. and (2) protecting,-5all/instruments and control?panels from/corrosion, etc.,: dueptaj . . _ humidity, - precipitation, temperature /add atmosphprie < conditions or environment; (b) be held accountable . for.surplus materials.furnished by /COMPANY, items
receivedi. from. COMPANY and - td/jbe returnedajid;: for shortages or damages -to material =and equipment ? . - furnished by COMPANY- Where /necessary /CONTRACTOR shall / apply t cade colors for the/identification tof . special ialldy . materials" when;//they are/reqeiveik,; . to /ihsTire- that -these alloy materials1 are /properly installed -and that-correct :weld rod .is. used.. . . . ..
|064 : it; is ^contemplated that -the./items: of material /and
equipment / to be s: furnished by COMPANY pursuabfchto ?
- Paragraph 1.22/.: herein will be ..listed on ./appropriate
bills: of material:/or drawings: in quantities-/. ; . .
sufficient-to-do...the /work,, . CONTRACTOR, shall : j
promptly check such..bills : of -materialor. drawings
for. any errors which: would result/in shortages arid
' Shall,- promptly ..upon.-discovery j notify COMPANY in
writing if -there 'are any such! errors or. if 'the /
material -and :equipment-listed are insufficient >to
meet . his anticipated.needs. /. Delays caused by
.
CONTRACTOR0S failure to discover andvpromptly ;
report such errors, or that the /material - and equipment
listed are insufficient to meet his anticipated
needs shall, not / constitute a .basis? for-reimbursement
under Section: 3.2 of - the /Terms and < Conditions * or
'for extending-the completion date..: ... .
.- . .
3.065 Uponcompletion of/the job, CONTRACTOR shall furnish COMPANY an . inventory of all remaining material//and equipment .which were furnished by COMPANY /.including ihe^uantityi, description^ and the -irems-nuatber for each-item. When directed by COMPANY,. CONTRACTOR
CHEVBB 0002687 i
. STANDARD OIL;COMPANY OF 'TEXAS` ENGINEERING i DEPARTMENT - SAN-FRANCISCO
.. SPECIFICATIONlNO. E-2691 MARCH. 15, 1968 `. SECTION-NO o .3 : PAGE 4
shall; transport the remaining material .and egaipment^ ; to such locations on COMPANY'S-premises as designated
by COMPANY. -
3.07 ' DRAWINGS AND' DIMENSIONS
3i071 COMPANY will furnish to CONTRACTOR four copies of
alits pertinent -standard .drawings^. standard .
..
specifications ,, reference drawings,, and construction
drawings. Two copiesof vendor's drawings willt
befurnished for all t equipmentthat -^COMPANY: supplies.:;
3.072 CONTRACTOR shall receipt -for all :drawings - received
and-except -for x>ne :COntract . set shall. return'-all-; drawings . to. COMPANY upon - completion of:< job - or: when superseded.by revised issues. : CONTRACTOR shall -. maintain at -all times- in his field.-.offlee a -complete - up?rto-date.,file :of -all s drawings ^furnished him. 1. .
: 3^073 ^500: completion of-ccuisfcruction^ .CONTRACTOR sha?!?
mark a print of each magdr drawing., to ~.indicate:raiiy
changes or deviations made : in the :actual: ...j . .
installation i ' However c minor construction - drawings -
* ` such as structural r= details and small -foundations-
need - not>-be :somarked.................
.i
. 3.074 CONTRACTOR shall prepare :any detail sketches or-
models he may require. Detailbdrawings will*hotn
be prepared by COMPANY, to 'Show:exact routing,, for
example ,, of conduits between ^underground duct ^ banks
. and'stub-^ups.-in building .floor. `
.
; 3.075 CONTRACTOR shall be responsible for verifying all dimensions of -and- for proper fitting: up of--tie- ins to. existingufacilities or facilities-toi?be: constructed by others as shown-on the design ; drawingsrefurnished by COMPANY. CONTRACTOR shall
' submit-any proposed change, or deviation from: |
drawings to COMPANY for written approval-before fabrication^or. installation. .'
CHEV BB
!0002688
STANDARD OIL:COMPANY OP TEXAS ENGINEERING `DEPARTMENT - SAN' FRANCISCO-
SPECIFICATION NOo MARCH: 15,, 1968 SECTION NO 3 PAGE 5
E-2691:
3.08 ' INSPECTION*AND TESTING
3,0801
General
,
..
CONTRACTOR shall-be;solely responsible :for thorough craft'inspection during^cbhstamction and; for the quality of the work. COMPANY 1 will 'make :such .inspection as COMEANX may. . desire;: in (order to . check, the:progress: and quality.o f the:workB to see - that CONTRACTOR5s; . employees are properly qualified -in itheirrespective crafts ,,.that"workmanship is of an acceptable graded and that'.aitef .. . requirementsof -fhis Specification are ; . being meti ' . Sucliinspection or ariy other inspection or testings'by COMPANY shall&hoti relieve CONTRACTOR of.-full responsibility for- the .work;, hereunder,:.
3 - 08Q2
Welding Inspection...
. . .. . . .
3,08021 CONTRACTOR shall arrange .for welding',
qualification tests. at 'his. expens e
;`in!=accordanoe.!,iv?l:^j'. Engineering.' .
Instruction- EP?r310 , .. Welders shall:
' - be .required to-pass ^qualification
,
tests before performing . any ..operation
during ^construction .of ' the- projects
COMPANY reserves the.:right.ttc*:>
require additional:qualification
tests during construction-if/it'
has any.doubt-about the :competence -
of welders, COMPANY: shall-:;-be.:
allowed to witness tests and to
examine test - couponso If ^additional
tests are required and; passed, by :
welders c cost.of < retestinglwill .
be borne, by COMPANY; 'if failed,
cost of retesting shall be rborne
by CONTRACTOR., .
3d08022-COMPANY will-perform radiography of welds,, as specifiedin-the piping standards,, in accordance
CHEVBB 0002689
. . 3.0803
.
STANDARD Oil CCMPANYOFTEXAS' ENGINEERING DEPARTMENT - SAN - FRANCISCO
SPECIFICATION;* NO. :E-2691i MARCH: 15 1968 SECTION: NOo . 3 PAGE 6
- with Section- 7. 0 of; < Specification No JEG-r2505 * tor verify that ythe. 3 . overall-quality of workmanship is in aceordance:with COMPANY standards (Specification NOo EG^Z5QW0S Welds so 1 inspected - shall *be ^repaired cor . replaced by .CONTRACTOR at;Mis-en expense, if (the .weld- fails to meet-. said standards of acceptability ,, All; Of-. COMPANY0* radioigfaipis^r-wiilVv
be -available to 3CONTRACTOR' fqr> his;
review, arid, use ..to ;the.-extent;the: ' '
desires to;verify that-ail
;
: requirements of Section 3;G801;
above .are -met.' :
;.
Hydrostatic *Testing.
.............. .
(11 Equipment arid Piping - CONTRACTOR . . shailperform hydrostatierdtests^ in
; accordance with. EngineeringIristrtrcfefdn^
Rtt300,, . on ffUTequrpmefit .and'lin^sV
.
after, erection* hutsibefore.ahY- , . insulation or backfill* arid;with all? fweldedcj screwed or flanged-joints .
exposed, t Before .performing =ari.y
hydrostatic *test* CONTRACTOR. shall 5 notify COMPANY0 S Construction; . .... .
Representative sufficiently., in - advance
so that .all.shydrostatie ttesta -may.- be ' . witnessed by COMPANY inspector, :!?
CONTRACTOR shall: furnish all ^equipment
needed for use :in hydrostatic (.testing.
(23 Drain, lines - Each section of-drain line shall, be tested by CONTRACTOR before placement of any - area pairing ; over the lines. ,
CHEVBB 0002690
STANDARD Olt COMPANY OF TEXAS ENGINEERINGSDEPARTMENT - SAN < FRANCISCO
SPECIFICATION'-NO^ E426$E; MARCH: 15, 1968' SECTION' NO o' 3 PAGE 7
3-0804 3-0805 -
3-0806
Electrical1 Inspection1arid Testing :
--------- CONTRACTOR shall; inspect-wiring, cables* motors, controllers,- and. lighting arid test ; grounding, all=in accordance:with Specification NoSo^EG-4894 ahd EG-1675^;
Instrument!Testing .................................
CONTRACTOR shall inspect and-make all:
necessary tests and such additional, tests as COMPANY may reguestito?insure:that< instruments are.installed correctly and ` will.;function-properly, in aceprdance with SpecificationINOo EG41586, except;thatr
Cl) liny; pressure :gagesthat-are:damaged,
' shall - be returned- fay CONTRACTOR to*
COMPANY., COMPANY-will . repair,., test
arid. adjust such > pressure : gages arid. -
release them to CONTRACTOR'with aitag
attached to : each gage;: identifying';the :
gage arid showing that 'it `is in= :
satisfactory" conditim-iS. . ;.
.
(2) All relief valvesshallbe :returned
by CONTRACTOR to COMPANY- COMPANY will .check arid, if necessary,: adjust relief;valve ^settings arid release-the : valves to CONTRACTOR- with a .tag .j attached to. each valve.identifying the valve,- showing that ithis insatisfactory condition,- and rioting . the set pressure-
Columns, Vessels, and Furnace:
,
; |.
CONTRACTOR shall prepare all pressure
vessels,, columns, and the;furnace.for final
inspection, including opening of all:
.
internal . and external manways arid handholes*
' providing ^proper: gaskets-: for all., openings -
arid removal of * debris - When CONTRACTOR
has proceeded with .his work to the .-point;
CHEV BB 0002691;
3*807 3 *-808 :
STANDARD OIL COMPANY OF TEXAS' ENGINEERING; DEPARTMENT I- sk:=fRANa?SC:?
SPECIFICATION: NO. MARCH:15ff 1968: SECTION .`NOo 3 PAGE.8
E-2691:
where a coluan/ vessel; or the: :furnace is
ready: for a .COMPANY check,* hevshalkiadvise: COMPANY o : When COMPANY has: had. reasonable : opportunity to complete :.its, inspection -arid COMPANY S Construction - Representative! is: ' satisfied that ^ no .further action^ ie ^required before,firtal; heading.up of the :column,, . vessel;; or the furnace; he will'give: CONTRACTOR written notice releasing:it .for final.heading:up........................
valve and Pump Packinqr:
. . . ..
-
CONTRACTOR shall repacks in the :field: the shafts of all pumps.-. CONTRACTOR shall check all valves in-piping.classifications' M3, * Rl; S, Wl, W2,, and W3 to see.that sufficient^pacKihgr hasvbeenp ihstalied.v .'
CONTRACTOR.also ?shall check at^leaStSIO^ of ..each type of valve toirverify .that: the proper type :of pacfeingihas been-ihstalied, >
. in the,-presence of COMPANY inspector^:
Mechanical? Equipment
.....................| .
3.08081 CONTRACTOR shall align the:shafts
of all drivers (motors,,, turbines) andconnected driven equipment ?
(pumps and compressors)* ; CONTRACTOR
shall.notify COMPANY"S Construction
Representative sufficiently:., in
advance prior to bolting up couplings
so that COMPANY may inspect 'and
approve alignments. CONTRACTOR
shall be responsible for., equipment:
alignment until correct alignment; has been, demonstrated at operating
temperature* Pumps,, drivers,,
.
gears,.etc* ,, mounted on baseplates -
or soleplates shall;be;doweled to
preserve alignmenfcawhile:operating
and to restore alignment'when-!
equipment is removed for maintenance.
CHEVBB 0002692
STANDARD OIL COMPANY OB TEXAS ; ' ENGINEERING f>DEPARTMENT ' - SAN' FRANCISCO :
SPECIFICATION^NO? E-42&9I; MARCH 15^ 1968
SECTION NO 3 PAGE 9
308082 CONTRACTOR shall check rotation
.......................................
of motors, set turbine overspeed trips, turn over conqpressor, etc,
in the presence of COMPANY inspector
3,,0809
Concrete Samples
...
COMPANY may-perform:compression and slump
tests on concrete^ CONTRACTOR shall furnish
samples taken: in'accordance with ASTM
Specifications as may be requested-for the
following:tests and.inspectionss -
.
.
(1) Compression Tests? One set of ^three cylinders from each 50 cud .yd. of structural*concrete :placed each day. ;
(2) Slump Tests? Periodic;samples daily - . during the pouring,of concrete .'
3 09 ~EQUIPMENT LUBRICATION
j
COMPANY willfurnish all lubricantsand CONTRACTOR , shall - lubricate all equipment .1 including couplings.rin 'accordance
with the-lubrication schedule CONTRACTOR shall;notify COMPANY8 S Construction :Representative .sufficiently;.: in advance :so that all lubrication may be witnessed by|- COMPANY, inspector ,
31Q BOLTING-UP.PRACTICE
.. i
The holting-up of flan ?ed joints shall be in accordance-
-with Engineering Practice R-800
i
All bolts in piping classifications M3, N, . Nl^ , N2,,! Rl, Wl, W2, and W3 shall be lubricated with a high temperature .lubricant - approved by COMPANY - before assembly of joints
In addition, the following-procedure shall be used for spiral-rwound gasketed: flanged joints?
(1) A programmed bolting sequence of uniform:loads, i<re,. start with the flange bolt in the:12 oaclock
CHEV BB 0002693 !
STANDARD OIL COMPANY OF TEXAS
,
ENGINEERING DEPARTMENT r- SAN FRANCISCO
SPECIFICATION NO. E-2691*
. MARCH 15, 1968
SECTION KOc 3-
PAGE 10
!
`
.~
position, then transfer successively to the 6 o'clock, 9 o4clock, 3 o'clock, etc., bolt positions,. increasing the. bolt, load uniformly each time the sequence is completed.
2) Tighten the bolts until the flanges are uniformly seated on the gasket centering ring-, Lubrication with graphite paste.of-the gasketed surface .is required.
COMPANY will provide, fo.r piping and vessel manhole
covers, extra long bolts for future use with Biach bolt -
tensioner, for bolt sizes 1-1/2" diameter and larger.
CONTRACTOR shall.install bolts so that full extra'length
protrudes on free side of. flange, and install:extra nut:
to cover exposed threads.
..
-
. '
3.11 ERECTION AND RIGGING.PLANS
' ...
Rigging - CONTRACTOR shall submit`Rigging; Diagrams' for all "Heavy Lifts" including the main pipeway stanchions to.COMPANY Construction Representative for review at* least 3 weeks prior to performing the work, except .that * . .Rigging Diagrams for erection of the reactor shall be submitted 5 weeks prior to erection of the reactor. "Heavy Lifts" are defined as any lift involving.gin poles, guy derricks, multiple cranes, , or any arrangement1, other than a single crane lift within the operating .limitations of. the equipment used. The..Rigging .Diagram shall completely define the rigging plan and shall-= include such information as location layout? location of guys . and deadmen; details of connections at equipment, poles and deadmen; calculations of stresses in cables and safe . loads on all.rigging components, etc.
CONTRACTOR may use the Reactor top nozzle for lifting pur poses. CONTRACTOR shall design and fabricate the lifting
. head? the distance between centerline of pin in lifting
head and face of top nozzle shall not_exceed 12 inches.
CONTRACTOR shall take special care to protect nozzle
. ' cladding and ring joint groove.
.
.
3= 12 MANOFA.CTURSR S DIRECTIONS
Ail manufactured articles, materials and equipment shall be applied, installed, connected, erected, cleaned, conditioned, and tested in accordance with manufacturer's
CHEV BB 0002694
STANDARD ' QH COMPANY ' OP TEXAS ENGINEERING DEPARTMENT5-v SAN^FRANGISeO
SPECIFICATION <NOi: E-^26915 MARCH-15 1968 SECTION! NO o 3 PAGE 11
,,
printed directions arid <specifications unless ^otherwise .. specified herein
3 o 13 PID` CHECK
CONTRACTOR shall make a complete ahddetailedphysieal:
inspection toiverify that i all;: completed! piping systems
and. instrument -installations are.. in 'accordance with the
- filial Piping and Instrument Diagrams* . Instrument Schedules*
and instrument Installation Detail-si . CONTRACTOR shall:
also-verify that all materials conform :to the .Piping ,
i Material. Classification. Sheets -and. Instrument;Drawings
: Discrepancies discovered in ibhis . checlt shall ; be rcojcrected
4 by - CONTRACTOR except =that ?ahy. discrepancies^wherein
;
piping-drawings do not=agree.with diagrams and schedules
.. shallibe referred to COMPANY for resolution,, "
3^14 CORRECTION--OF, DEFECTS
................ . .
...
. . ...
CONTRACTOR shall.perform; all;necessary repair work.tc: correct -all, defects. and any . damage., caused therebyo.C .When
; repair ; work; is .-necessary due to faulty, workmanship! of : CONTRACTOR. or due to ;defective or unsatisfactory;. material r furnished, fay CONTRACTOR*, the -cost;of -.such. repair ' wOrk . shall . be borne by CONTRACTOR. in the.;manner provided; by Section 42 of -the Terms and conditionso .Where a:defecfe = is duei-to defective material furnished by CQMPANX* | the.
= correction of the; defect and any damage .caused thereby shall : be;performed by CONTRACTOR and the rcontract -price shall be adjusted in-accordance with the ."Exhibit V
. Change; in the Work" for such correction work- :
3 ,,15 - CBEANING OP
. |.
.
During the.course of the work* the CONTRACTOR shall;keep
a reasonable .degree :of order , by-- disposing of accumulated
rubbish and waste, material rand*, at the .completionfof `.the
work* . the site. shall > be cleared of all debris*-, left-over
materials* tools* and equipment ;which may: have ;accumulated
in.the execution.ofithe- work. All temporary shops *
..
storehouses* offices* toilets* etCo*. erected by CONTRACTOR
shall. be removed.. Where the CONTRACTOR* after duC'noti'ce*.
fails .to keep the area of-his work reasonably clean and .
safe* or fails to clean this area at the completion of
CHEVBB 0002695
STANDARD Oil* COMPANY OF TEXAS ENGINEERING IDEEARTMENT-;SAN -FRANCISCO0
!..
SPECIFICATIONNO., E-2691 MARCH 15, 1968 4 SECTION NOc 3 - PAGE .12
the :work, the COMPANY may perform this'work ahd; deduct! .. the cdstfrom thesums due or to become due the;CONTRACTOR
3ol6 COMPLETION
The^work'will ;be ^considered "complete" when CONTRACTOR haS- performed all'.work specifically stated or manifestly implied* din this Specification.,- The /followings, illustrate the ;type :Of` work items'which must have, been satisfactorily accomplished before - the work:.will be ^considered complete s
: 3.161.Completion-of.all--required.tests.,: .
. . .'
'! 3 i 162 Completion of - all:required inspections including .
PSID checko ;
..
.I
..
3i 163 Pimps, machinery and drivers checked-for alignment -. after final tightening of connectingvipiping, -
. . bearings flushed and lubricated
.
3164 Instruments, alarms, and controls cleaned, - . lubricatedand-checked;
:
. 3i-165 -Piping 'washed -o>r blown clean-with :air, : in place and cleaned,, .
All - strainers; |
I -'
3oI66 Electrical circuits tested-for grounds or shorts,
motors checked for rotation and: run a minimum of -
two: .hours.. . All lights cleaned and operating,1 and
all controlcircuitschecked,,
.; .
-
3 167 All ==* nameplates, identification stencils, etc^ , . . installed.,
3.17 ACCEPTANCE
!
3 o-17-i -Custody of Plant for Initial Operation
i
' When-the Plant=is tested and completed in ;accordance with the "requirements of ijfchis Specification.-^except' for finishing: work not-essential-for the operationof-such-Plant "which COMPANY and CONTRACTOR agree:
- can.be completed-while the-Plant is in the custody of COMPANY, such as painting,) -CONTRACTOR shall."
CHFV BB 0002696
STANDARD:; OIL ; COMPANY OF TEXAS ENGINEERING ."DEPARTMENT SAN; FRANCISCO
SPECIFICATIONSNOo MARCH:15,1968 SECTION:- NO i.3 PAGE. 13
E--2691
so notify COMPANY in' writing., i lifter receipt :of . such notice, COMPANY stay then take custody of such - Plant to. begin initial operation to; verify that : the :Plant-conformswith requirements of-this Specificationo ' Such custody of -such Plant shall-: not be construed as Acceptance pursuant to -Paragraph ' 3 ol72 below*,.: Any additional work required to. be -performed by CONTRACTOR in-such Plant--after COMPANY ; has taken custody shall be\performed on a work permit.'basis .
3172 Acceptance
.
. 'i
' -
CONTRACTOR S* work?hereunder shall:be considered accepted on the:date COMPANY gives written notice ' to CONTRACTOR that -it-is satisfied all:work has .
been completed.in accordance with the^requirements of .this Specification Acceptance^ by .COMPANY shall;
in no -way relieve CONTRACTOR of* his obligation-or
liabilities under the rCoptract^
!.
THIS PAGE ENDS SECTION.- 3 ,,