Document 7MNVRB6YQXqVYgbv2aE7vrJ0R

Case 1:03-cv-01345-PWG Document 448-2 Filed 01/13/2009 Page 1 of 5 FILED 2009 Jan-13 PM 03:28 U.S. DISTRICT COURT N.D. OF ALABAMA EXHIBIT A WATER PCB-SD0000046827 Case 1:03-cv-01345-PWG Document 448-2 Filed 01/T3/2009 Page 2 of 5 Monsanto StjLouis - general Offlcea August 7, 1970 AJWISTOtf - PCS - CiZAKU? PROCRAM TO Mr. H. S. Bergen, Jr. - H3SR0 John Mason - JMASO . P. Wheeler - EWHEE V B, Papasreoree . - WPAPA P. J. Holxupfel - fkol2"" D. B. Hosmer - DHOSM J. S. Savage - JSAVA a. L. lessee - Anniston C. Zandwehr - Anniston i COHPTJENTIAL - ?. 7. I. AND DESTROY : ih Following are the moves underway resulting from the FDA findings of high levels of FCB In fish taken from Choceoloceo Creek: down stream from It's confluence with Snow Creek. ' v'.;; 3 (1) We are presently discharging to Snow Creek about l6#/day . of PC3 (down from. 250#/day in 69). Measurements of departmental i ' waste streams' 'show''"a total loss of only 2#/day,'The discrepancy Is believed due to; (a) sampling problems In departmental waste . streams where two-phase systems of water and free aroelars may be present, and (b; possible pickup of PCB by leaching previously deposited ?CB from the limestone neutralization pit which also acts as a settling basin. (2) Work to further reduce losses presently underway: a) Sump is being installed at the aroclor.department to cap ture free aroclors from the 275 gp flow. Oils Is believed to be the largest departmental source of sewer loss because of the liquid aroclors frequently observed. However, sampling work did not confirm the belief because, no doubt, of Inherent sampling problems. The project was due for completion on 9/1, and had been delayed because of an underground spring. b) curbing is being Installed at drum loading area with drypick up of spilled aroclors planned. c) Investigation of treatment methods - adsorption by acti vated carbon showing most promise to date. % (3) Joe Crockett, Secretary of the Alabama tfhter Improvement ;ij Commission, will try to handle the problem quietly without release ; nf the information to the sublie at this time. He believes that : FDA will..not precipitately in this matter (he oia not advs.se now FWQA might react). Dr. Myers, Director of Public Health of Alabama, wants toxoity information on PCB's and this will ba conveyed per sonally to him by Jack Oarrett next week. ' HONS 033851 WATER PCB-SD0000046828 Case 1:03-cv-01345-PWG Document 448-2 Filed 01/13/2009 Page 3 of 5 H. S* Bergen, Jr. August 7, 1S70 Page 2 PROGRAM . . (A) Public Relations * S. V. John developed a proposed atata- nent to be used In event of public disclosure but, after consul tation with Legal, felt it should not be used bep&uae of the recent lawsuit instituted against the plant Therefore, an innocuous, essentially "no eonsnent" type stabaaseent i's b' eing drafted. (3) Operator Education - All Anniston personnel have been read vised of the necessity to avoid sewering of any aroclor. . (C) Mechanical Program . (1) Departmental Sump - at extra cost of $2,000, work is proceeding on an overtime basis with completion expected S/12/T0. This will eliminate the possibility of large..las.- ' ses- from the operating area. . - (2) Loading Area - Vashup of spilled aroelor-has-been stopped .< and dry pick via sand instituted. . Curbing project;s being : , expedited. -. .......... (3) Heutraliration -Pit Clean out ` i* .* * (a) Immediately, the settled material downstream of the limestone will be removed as well as possible by pumping, with minimum stirring of the water. The solids (and aroelors) will be landfilled. ': (b) By-Pass of Neutralization 7t. - On.crash basis, trenches will be dug to allow diversion of all water from the limestone pit. This will taks 1-2 weeks and will cost about $10,000. In addition, it will be necessary to provide caustic neutralization of the add wastes. This will be handled in the iroclor department via installation of a pH con troller and valve with temporary piping and trucking facilities. Cost.will be about $5,000 plus about $500 per day for caustic during the period when, the alternate neutralization is required. During this period, PCS losses should be no more than 5 - 10 lbs./day, ... XONS 033852 WATER PCB-SD0000046829 Case 1:03-cv-01345-PWG Document 448-2 Filed 01/13/2009 Page 4 of 5 H. S. Bergen, Jr. August 7, 1970 Page 3 ' (e) Cleanout - The pit will be thoroughly cleaned cut . with probable removal of the present deteriorated asphalt membrane and replacement (possibly) by a plas tic membrane which can resist aroclors. The plant will consider possible structural changes to permit more affective operation and ability to make future cleanouts without the present by-pass stspa. Recommendations rel* ative to this will follow. ' (4) water Plow Reduction - Present total flow through pit is 700 gpm. for at least several of the streams, reduction of flow will result in immediate reduction of PCB to Snow Creek. Mere Important, reduction of flow will minimize future treat ment costs. In conjunction with the pit by-pass work in 3(a) above, approx imately 200 gpm of arodor free water, will be permanently diver ted. Included in the first reduction are the chloxinator cool ing screams and moat of the water coming from the SIran flare tower. Details of how this will be accomplished will be. avail able by 8/14/70. -. Over the next 3*4 months, further water conservation projects - will be Installed with objective of reducing the" stream .to the lowest practical amount;,:now estimated to be about 300 - 4co gpm. The projects will involve multiple use of .'water and fur ther diversion* of aroclor - free water. ' ' '. ' N. (5) final Treatment - Based on some indications ( and much hope) by Septester, the action* above may approach the present plant rthi*M.v of 10 rob of PCB's in 7w *p (or 0.1 #/day). The hope is raised because dissolved aroclor naa snown a pronounced affinity for surface adsorption (a* on wall* of sample bottles). The solids generated by the limestone neutralization are believed to retain aroclor passing by them. Therefore, adequate settling and/or filtration following neutralization with periodic removal of the aolida may accomplish the necessary treatment (along with water flow reduction). The plant will proceed on preliminary design of filtration facilities with and without carbon treatment between neutralization and filtration. The design will be avail able for action in caae the reduction is not as great as hoped- for or in ease the control agencies demand more complete removal (control agency requirements are a completely unknown factor at present). By the time a decision must be made relative to final treatment, we-should have better information on requirements and methods. HONS 033853 WATER PCB-SD0000046830 Case 1:03-cv-01345-PWG Document 448-2 Filed 01/13/2009 Page 5 of 5 H. S. Bergen, Jr. August 7, 1970 Page 4 ' (D)Eiah, Hud and Water Stapling - Since our fish ssaplss fron nearby Choceoloece Creek also skewed high levels or PCS'*, we are Institu ting more *sapling to determine extent of the protlea. Early during the week of 8/10, legal size fish will be caught in Choceclocco Creek near to confluence with the Coosa Elver {Logan Martin Lake). Tieh will also be taken, from the lake. If these samples show high (-5.0 ppm) levels of PC3/ sampling will be extended to points down the Coosa Elver. A high priority will be given these samples by Scott tucker. progress reporta will follow et suitable Intervals. Paul B. Hodges /np HONS 033054 1 WATER PCB-SD0000046831