CHAPTER 40
1959 Guide
Table 5 .... Condenser Design Data
leaving Hot Wafer
Temperaturn, Got f
Go* in Coederaer in Ccodenw'
Bert Condwiw
Co-
F
Deogn Ofega
Carbon dioxide. . Methyl chloride..
Dichlorodi-
1
fluoromethane j
185 psia* 1030 psig*
102 psig* 117 psig* 126 psig* 136 psig*
* Head pressure.
92
86.0 83 80
100.0 96 92
loa.o 96 93
105.0
100
97
110.0 104 101
Condensing Systems
Each vapor has a pressure &t which condensation occurs for any given temperature. This pressure increases with tem perature up to the critical temperature of the vapor, above which no amount of increased pressure causes condensation. Condensation in a process occurs at constant temperature because a constant pressure will exist in the heat exchanger. The condensing pressure is usually the controlling factor in the process, although this is obtained by designing for the corresponding temperature. Table 5 lists typical condensing data for commonly used vapors.
A transfer of heat from the vapor to the circulating water requires a temperature differential between the two media. Since the vapor must condense at a constant temperature, the condensing temperature h in fig. 9 must be higher than the hot water temperature fa . It is for thin reason that the condensing temperature is largely determined by the tem perature of the warm water leaving the beat exchanger, and tire entering cold-water temperature has only a small effect. The terminal temperature difference is controlled by the amount of heat transfer surface in the condenser. Economi cally sized condensers are usually designed to operate with 3 to 10 F deg temperature difference between the vapor and hot water.
Fluid Cooling
Different conditions exist when cooling a fluid such as milk, natural gas, or distillate. When this is done in a counter-flow heat exchanger, two terminal differences are involved. The fluid can be cooled to a temperature approaching that of the entering cold water, and the circulating water can be heated to a temperature approaching the hottest temperature of the fluid. A terminal temperature difference must exist at both the hot and cold end of the exchanger, but the temperature of the fluid leaving the exchanger can be colder than the hot water temperature.
Water Gradating Rate
The heat load on tire system is determined by the process being served, and when this value is fixed, the circulating water rate determines the temperature rise in the heat ex changer. The cooling range in the cooling tower is obviously
equal to the rise in the exchanger when the two are operating in equilibrium. The type of heat load and the characteristics of a cooling tower govern the selection of the optimum circu lating rate. Increasing the circulating rate while holding the other operating conditions of a cooling tower constant, will reduce the cooling range- The cold-water temperature will increase, but the hot-water temperature will decrease to a greater extent. A high circulating rate and a short cooling range is advantageous when condensing vapors because the lower hot-water temperature has more effect on condensing temperature than the smaller increase in cold-water tempera ture. This advantage can be offset by greater power require ments for pumping, and possibly by the increased cost for larger piping.
Cooling a fluid presents a different problem. The cooling tower must deliver the cold water at a temperature that is below that of the cooled fluid, and this is more easily ac complished with a low water rate. The process may involve several heat loads, one of which requires a low temperature and the other can be removed at a much higher level. The size of a cooling tower is governed more by the cold-water tem perature than by the cooling range. Once the cold-water temperature is fixed, it is desirable to increase the range as much as possible. A single cooling tower serving several heat loads in series is usually more economical than a number of individual towers.
A refrigerating system rejecting 250 Btu per ton imposes a load on the cooling tower of 30 (F deg) (gallons) per ton. The standard practice is to design the towers for 3, 4 or 5 gpm per ton, corresponding to cooling ranges of 10, 7> and 6 F deg, respectively. Towers serving steam condensers usually operate with a range of 12 to 19 F deg. Oil refineries usually design for a cooling range of 25 F deg or more.
Heat Exchanger
The cooling tower operates in conjunction with the heat exchanger in transferring heat from the process to the atmos phere. Increasing the size of either one will reduce the re quired size of the other. The optimum conditions are deter mined by considering the initial and operating costs of several combinations of cooling towers and heat exchangers:
Process Characteristics
The type of process must be considered when selecting the design conditions of the system. This is particularly true of the temperature at which heat is removed from the process. Am monia refrigerating systems are frequently designed to operate at 185 peig head pressure, corresponding to 96 F condensing temperature. This will require cooling water leaving the con denser at about 90 F. It will be impractical in most localities to select a cooling tower that will not exceed that temperature during brief periods. An increase in the temperature of the circulating water will raise the head pressure and increase the power requirement of the compressor. The increased head pressure also reduces the refrigerating capacity, but the sys tem can be designed to perform acceptably at such times. A carbon dioxide refrigerating system represents a more serious situation. The critical temperature of the-refrigerant is 8S.4 F so the system will not function if that temperature is exceeded. The design conditions are also influenced by the process served by a refrigerating system. The maximum refrigerating load does not necessarily coincide with peak wet-bulb temperatures so a reduction in capacity may not be serious. That may not
Evaporative Apparatus for Heat Rejection
587
be true in the case of air conditioning if the maximum capacity is needed when wet-bulb temperature may be at its highest.
The efficiency, capacity and operating costs of a steam electric generating station all improve as the condensing tem perature decreases. Designing for maximum performance at the most adverse conditions will result in a plant having ex cess capacity most of the time. The most adverse conditions occur during summer daylight hours, and peak power loads formerly came during winter evening hours. This gave the happy combination of peak demand during favorable operat ing conditions, and a low demand when the conditions were adverse. The power industry is profiting from the expansion of air conditioning, with the result that the peak load is be ginning to coincide with the most adverse operating condi tions. A generating plant can be designed to accept higher operating costs during such periods, but higher operating temperatures can reduce capacity below the required de-
The capacity of an industrial operation such as an oil refinery will vary with the temperature of the cooling tower. Such a process may be so involved that it is not practicable to vary the output with fluctuation of the weather. These plants usually are compelled to operate at a constant rate that can be maintained from day to day. All processes using cooling water are faced with variations in water temperature. Higher temperatures increase operating costs and reduce capacity. These can be overcome by installing a larger plant
or a larger cooling system, with the result that one portion of the equipment will have excess capacity during most of the year. The overall design must be based on (l) the minimum permissible capacity under the most adverse conditions and (2) an economic study showing the effect of changes in the size of the components on initial cost and operating expense.
Wet-Bulb Temperature
The wet-bulb temperature is beyond the control of the
designer. It fluctuates during the day, and throughout' the
year. The annual averages should be studied and correlated
with the characteristics of the process. Peak wet-bulb tem
peratures are usually of short duration so have little effect
on annual operating costs, but the effect of these conditions
in Umitiag capacity must be considered. The design wet-
bulb temperature should be selected on the hams of the num
ber of hours of the four summer months of June through
September (or of the year) that-it can be exceeded during
an average year. A common practice in air conditioning is to
select a wet-bulb temperature that will not be exceeded more
than 5 percent of the time during the four summer months.
Various groups are cooperating in compiling weather data
for tins type of study. A limited portion of the data are tabu
lated in Table 2, Chapter 13. More edmptete summer weather
data, statistics, charts, maps, and technical analysis have been
prepared by Albright.1*
When the circulating rate and water temperatures have
been selected, the size of the cooling tower will be increased by.
selecting a higher wet-bulb temperature. Selecting the design
wet-bulb temperature makes it possible to consider various
combinations of cooling towers and heat exchangers. The
overall design will, of necessity, consider the worst possible
conditions. This will correspond to the maximum wet-bulb
temperature for the locality, and the highest permissible proc
ess temperature. All components should be selected with these -
conditions in mind, but testing will be easier if the
size
equipment is designed and guaranteed around a lower wet-
bulb temperature. Table 6 shows that an ammonia refrigerat
Toble 6 .... Alternate Design Conditions for Ammonia Refrigerating System, Showing Annual Hours Hie Design Wet-bulb Temperature b Attained
Wet-8rfb Temp. Hof Wafer Temp. F
Hood Frmt*. P*
Horn Attoincbfe
78
92.0
185
75
88.5
174
70
86.0
166
12 161 750
ing system might be designed for a 78 F wet-bulb temperature. That temperature will prevail 12 hours a summer, and for brief periods of time. Designing the same equipment around a lower wet-bulb temperature greatly increases the amount of time that tests can be conducted at or near the design condi tions.
saecnoN and evaluation
The characteristics of the various types of water cooling equipment will influence the final selection. The require ments of the process, and physical conditions of the plant will impose further restrictions. These factors will determine the design conditions to be used and indicate the general type of equipment that will be most desirable. A wide variety of cool ing towers will, nevertheless, be capable of meeting the design conditions. Competitive designs may be similar, but they will not be identical. The same design can be considered in various frame sizes, representing different plan areas or heights. An increase of frame size will enable a tower to meet the condi tions with less total air flow, and will reduce horsepower re quirements. As a general rule, an increase of frame size in creases the initial cost but reduces operating costs. Optimum size is determined from an economic evaluation that will in clude such items as the following:
CAPITAL INVESTMENT
1. Total erected cost of cooling tower. 2. Basin, grillage, and value of the space occupied. 3. Cost of pump and prime mover. 4. Electric wiring to pump and fan motors. 5. Electrical controls and switch gear. 6. Cost of piping from tower inlet to point on tower nearest to plant. 7. Sump, screens, overflow, and make-up lines not furnished by manufacturer. 8. Shufc-ofi and control valves not furnished by manufac turer. 9. Walkways, ladders, etc., providing access to tower.
OPERATING COSTS
1. Demand charge, if it enters into cost. 2. Energy costs for fans and pumps, based on 3000 to 7000 hr per yr. 3. Amortization of investment, over a period varying from 3 to 30 years. 4. Maintenance and repairs.
Other {actors to consider are safety features, conformity to building codes, general design and rigidity of structures, avail ability of spare parte, experience and reliability of manufac turer, and operating flexibility for economical operation at varying loads or seasonal changes. Failure to perform in accordance with the guarantee usually proves costly to the'
/