A. Status of Active Budget Items
1. primary Treatment System Revisions
It has been decided to build an arched acid brick roof in the T-252 pit to repair it. The material has been ordered and forming work is underway on the required concrete changes. Completion of repairs should be during November 1971 and the system will be started up immediately upon completion. The top of the steam stripper tower was inspected during the month and no damage or corrosion was noted. Piping for the stripper bottoms cooler has been ordered and the cooler has been set. It will be operational when the steam stripper system is started up in November,
2730 gallons of slop EDC were hauled from the plant this month.
2. Secondary Waste Treatment System
Excavation and underground piping are still about 85% complete due to extensive rain this month. The clarifier floor and walls have been poured and also the instrument shed floor. Electrical work is about 15% complete and the main power feed has been brought into the site area. The in-plant neutralization system is 60% complete with only electrical and instrument work remaining. Completion of this project still appears to be in late December.
3. C-500 Venturi Scrubber
The system was put in operation on August 27 and on August 30 the spray nozzle of the scrubber failed and blew into the C-500 tower. The system is still operating (at part efficiency) since some scrub bing occurs even with a solid water jet instead of a cone spray. The nozzle vendor is redesigning the spray nozzle so that a new unit can be installed during the next plant shutdown. The pH of the T-2 pit water has dropped to 1.3 compared to about a 2,5 pH seen before the scrubber was installed. This would calculate out to 242 lbs/hr. of HCl removed from the C-500 vent stream (about 49%). A single test for organic removal showed 12% of the EDC and 2.3% of the ethyl chlo ride in C-500 were also scrubbed out. All of these efficiencies should improve when the new spray nozzle is installed early in 1972,
CCR 000060510 Jt
4. Copper Removal System
The copper removal system (used during catalyst turnarounds only) trenches and mixing basin are complete. New double size filter bags have been ordered for the filter system. The only remaining work is some minor piping work which should be done during October, This system is essentially operable now if required. Some process engi neering work is continuing on methods of improving the Cu(0H)2 sludge filterability, such as filter aids or polyelectrolytes.
B. Current Developments
1. Analytical Work
The last of the special tests on the plant effluent and well waters have been completed by Ponca City R & D. The data showed less than 1 ppb mercury, under 1 ppm cyanide, 1,0 ppm lead, and about 3 ppm oil and grease. Plant analysis has shown that all of the sulfide, magnesium, aluminum, manganese, and most of the iron and copper in the plant effluent come from the well water feed. Cobalt, nickel, zinc, chromium, calcium, sodium and cadmium are being added by plant operation. Additional well water COD tests have confirmed a COD of around 5 ppm for the well water system. Phenol levels are higher than originally expected, (about 1.0 ppm) and apparently come from the plant operations.
Daily effluent samples were taken during September for 25 out of 30 days and checked for organics. The EDC content averaged 1673 ppm with a range from 831 to 3373 ppm. At an estimated 200 gpm flow rate, this would be about 4000 lbs/day of EDC in the effluent water.
2, 1899 Refuse Act - Part B
The completed supplemental form was mailed to Dr. Sharrah on Septem ber 10 and was received by the Corps of Engineers on September 23, 1971. On September 6, 1971 another form was received from the ERA requesting special data on capital costs, labor requirements, and operating costs on all pollution equipment from 1966 thru 1976. Work on this new form (reply to this form is voluntary).should be completed by the end of October 1971,
<John D. Minott Senior process Engineer
jb CC: LNV-DOP-RDG-RHG-PLF-GDJ
CCR 00006051
VCH EFFLUENT
gR ANALYSIS'
MONTH OP September 19 71
Parameter
9/7/71
Temperature - F
-
PH
............. . ... .
2.4
Acidity M.O.
1050
Acidity phenolphthalein
1250
Alkalinity
Nil
Color Turbidity Flow - gpm
40 5
214
Total Solids Total Dissolved Solids
17,898 17,204
Total Suspended Solids
694
Total Volatile Solids
1678
Chlorides as Cl
7500
Sulfates as SO4
250
;; Ammonia as N
40
Total PO/, as P0/L
86
Ortho PO4 as PO4
45
Iron as Fe
19.7
Copper as Cu
0.70
Chromium as Cr
13.3
Zinc as Zn
3.8
COD
3600
BOD (5 day)
1180
Formates
718
EDC
991
VCM Ethyl Chloride
.... . .MU 18
Misc. other Organics
239
Mg 11.1
Mn 1.6
CO 1.4 Ca 105
Ni A1 _____ Qd__________________
1-.3 _
.
9/14/71 2.2
... _ 16.2JL__ _____ 2125 Nil
40 5
193 20 ,000 20 ,000
Nil 1840 10,400
280 -
-
3 1.5
18 0.72
12 ' ........2.8..... ..
2800 1688
708 1018
10 15 281 23 0.94
2.2 1500
0.44
0.25 -
9/21/71
9/28/71
93 ......... .31_______
________ 7.4 _________
_11.4...........
__
. ....... Nil......... 125 Nil
_______Nil____ ___ _ .
Nil _ _ -
....
65 4
156 38.000 22,000 16,000
1368 3600
150 72.6
50_ ________ 10 123 23.528 21,392 2,136___________ 1044 10 ,5QQ 225 12
11.0 0.22
5.7 0.14
2.5 0.3
-
2220
1.5 o.i
6.5 0.13 0.40 0.05 3680 1668
...
764 2118
8 18
745 1478
1.6 15
662 3.-2T '
_ -o3:78B0
0.51 1.3
1135 0.9
0.04
0.25 60
1.3
0.08 _______0,11______ ___ 1
0.23 0.12
o Remarks;
o 73
Samples on 9/21/71
and
9/28/71
show high pH is due
to
addition of waste caustic
to effluent.
O O O o O' o
fSJ
Date
C-500 VENT STACK ANALYSIS September 1971
IN PPM BY VOLUME
Other
EDC
VCM Et Cl Organics
CI2
HC1 Oxidants
C2
IN VOLUME %
Flow in
CO
2
ch4
c2h4 C2H6
scfh
9/1/71 9/3/71 9/4/71 9/5/71 9/6/71 9/7/71 9/8/71 9/15/71 9/29/71
4017 12,200
5687 4957 2568 3708 4620 2435 3528
362 420 750 719 2600 800 1500 332 540
3685 3500 3365 3426 3800 3500 3500 2890 5520
12,800 5584 4503 6100 9400
12,500 8691 515
6 3704 3 217 17 5728 20 15,012 - 5061 - 12,666 15 1234 - 5673
30 4765
2765 Nil
2790 11,111
1432 2049 1975 4444 5925
1.7 1.06 1.82 1.65 2.00 2.50 2.20 1.32 1.19
1.0 0.20 0.12
Nil 0.10 1.80 1.50 0.25 0.26
2.0 8.04 2.20 1.80 2.23 2.80 2.70 1.60 1.92
Nil 0.50 0.12 0.13 0.10 0.32 0.36 0.13 0.11
0.6 6.17 0.74 0.73 1.40 1.20 1.20 0.81 0.21
Nil Nil Nil Nil Nil 0.03 Nil Nil Nil
624,800
-
o o
73
O O O o o o W1 h- UJ
Water Sampling
i Air Sampling
i Primary Water Treatment
Secondary Waste , Treatment
C-500 prescrubber
Copper Removal System
Low Pressure Con densate Collection System
Dry Crude Tank Fume Scrubber
Slop Caustic Collec tion System
I Chromate Removal System
New Exchanger for C-101
^090000 >100
ENVIRONMENTAL HEALTH PROJECTS - VCM PLANT
January 1st Quarter
January to December 1971 April
_________ 2nd Quarter_____________
July 3rd Quarter
Process Engineering_^a_nd__Laboratory
c
October 4th Quarter
Process __ Engineering and Lab oratory
^.Rebuild of Steam Stripper Install Qil_ Skimmer^
.Startup
IF
Rebuild Roof
L CEP Design Work m_. ^
i
.....
Turcnasins J
--- 7-
;,
Purchasing
v:____
K- *
Construction -_______ )
Construction
Startup
! Replace; Spray Nozzle <*=----------- ,
^Purchasing^ 6
Construction;.
Repair Damage
TTriish Construction , Tie-ins.
c-jr:
Purchasing
rmaf.
i3,,
.Construction
Test.. . &=-5r--?*
Purchasing Engineering
Purchase 3*
Construction JHaot Testing
.Startup, Estimate
tT~?-------- :--
^jyfcchanical Engineering^
Construction