Document 75ryJ1xbx5RmZZpKrn1mooyj

Environmental To 1971 CCR 000060509 Interoffice Communication To From Date Subject J . D. Burns J, D. Minott October 6, 1971 Environmental Health Report Continental VCM Plant A. Status of Active Budget Items 1. primary Treatment System Revisions It has been decided to build an arched acid brick roof in the T-252 pit to repair it. The material has been ordered and forming work is underway on the required concrete changes. Completion of repairs should be during November 1971 and the system will be started up immediately upon completion. The top of the steam stripper tower was inspected during the month and no damage or corrosion was noted. Piping for the stripper bottoms cooler has been ordered and the cooler has been set. It will be operational when the steam stripper system is started up in November, 2730 gallons of slop EDC were hauled from the plant this month. 2. Secondary Waste Treatment System Excavation and underground piping are still about 85% complete due to extensive rain this month. The clarifier floor and walls have been poured and also the instrument shed floor. Electrical work is about 15% complete and the main power feed has been brought into the site area. The in-plant neutralization system is 60% complete with only electrical and instrument work remaining. Completion of this project still appears to be in late December. 3. C-500 Venturi Scrubber The system was put in operation on August 27 and on August 30 the spray nozzle of the scrubber failed and blew into the C-500 tower. The system is still operating (at part efficiency) since some scrub bing occurs even with a solid water jet instead of a cone spray. The nozzle vendor is redesigning the spray nozzle so that a new unit can be installed during the next plant shutdown. The pH of the T-2 pit water has dropped to 1.3 compared to about a 2,5 pH seen before the scrubber was installed. This would calculate out to 242 lbs/hr. of HCl removed from the C-500 vent stream (about 49%). A single test for organic removal showed 12% of the EDC and 2.3% of the ethyl chlo ride in C-500 were also scrubbed out. All of these efficiencies should improve when the new spray nozzle is installed early in 1972, CCR 000060510 Jt 4. Copper Removal System The copper removal system (used during catalyst turnarounds only) trenches and mixing basin are complete. New double size filter bags have been ordered for the filter system. The only remaining work is some minor piping work which should be done during October, This system is essentially operable now if required. Some process engi neering work is continuing on methods of improving the Cu(0H)2 sludge filterability, such as filter aids or polyelectrolytes. B. Current Developments 1. Analytical Work The last of the special tests on the plant effluent and well waters have been completed by Ponca City R & D. The data showed less than 1 ppb mercury, under 1 ppm cyanide, 1,0 ppm lead, and about 3 ppm oil and grease. Plant analysis has shown that all of the sulfide, magnesium, aluminum, manganese, and most of the iron and copper in the plant effluent come from the well water feed. Cobalt, nickel, zinc, chromium, calcium, sodium and cadmium are being added by plant operation. Additional well water COD tests have confirmed a COD of around 5 ppm for the well water system. Phenol levels are higher than originally expected, (about 1.0 ppm) and apparently come from the plant operations. Daily effluent samples were taken during September for 25 out of 30 days and checked for organics. The EDC content averaged 1673 ppm with a range from 831 to 3373 ppm. At an estimated 200 gpm flow rate, this would be about 4000 lbs/day of EDC in the effluent water. 2, 1899 Refuse Act - Part B The completed supplemental form was mailed to Dr. Sharrah on Septem ber 10 and was received by the Corps of Engineers on September 23, 1971. On September 6, 1971 another form was received from the ERA requesting special data on capital costs, labor requirements, and operating costs on all pollution equipment from 1966 thru 1976. Work on this new form (reply to this form is voluntary).should be completed by the end of October 1971, <John D. Minott Senior process Engineer jb CC: LNV-DOP-RDG-RHG-PLF-GDJ CCR 00006051 VCH EFFLUENT gR ANALYSIS' MONTH OP September 19 71 Parameter 9/7/71 Temperature - F - PH ............. . ... . 2.4 Acidity M.O. 1050 Acidity phenolphthalein 1250 Alkalinity Nil Color Turbidity Flow - gpm 40 5 214 Total Solids Total Dissolved Solids 17,898 17,204 Total Suspended Solids 694 Total Volatile Solids 1678 Chlorides as Cl 7500 Sulfates as SO4 250 ;; Ammonia as N 40 Total PO/, as P0/L 86 Ortho PO4 as PO4 45 Iron as Fe 19.7 Copper as Cu 0.70 Chromium as Cr 13.3 Zinc as Zn 3.8 COD 3600 BOD (5 day) 1180 Formates 718 EDC 991 VCM Ethyl Chloride .... . .MU 18 Misc. other Organics 239 Mg 11.1 Mn 1.6 CO 1.4 Ca 105 Ni A1 _____ Qd__________________ 1-.3 _ . 9/14/71 2.2 ... _ 16.2JL__ _____ 2125 Nil 40 5 193 20 ,000 20 ,000 Nil 1840 10,400 280 - - 3 1.5 18 0.72 12 ' ........2.8..... .. 2800 1688 708 1018 10 15 281 23 0.94 2.2 1500 0.44 0.25 - 9/21/71 9/28/71 93 ......... .31_______ ________ 7.4 _________ _11.4........... __ . ....... Nil......... 125 Nil _______Nil____ ___ _ . Nil _ _ - .... 65 4 156 38.000 22,000 16,000 1368 3600 150 72.6 50_ ________ 10 123 23.528 21,392 2,136___________ 1044 10 ,5QQ 225 12 11.0 0.22 5.7 0.14 2.5 0.3 - 2220 1.5 o.i 6.5 0.13 0.40 0.05 3680 1668 ... 764 2118 8 18 745 1478 1.6 15 662 3.-2T ' _ -o3:78B0 0.51 1.3 1135 0.9 0.04 0.25 60 1.3 0.08 _______0,11______ ___ 1 0.23 0.12 o Remarks; o 73 Samples on 9/21/71 and 9/28/71 show high pH is due to addition of waste caustic to effluent. O O O o O' o fSJ Date C-500 VENT STACK ANALYSIS September 1971 IN PPM BY VOLUME Other EDC VCM Et Cl Organics CI2 HC1 Oxidants C2 IN VOLUME % Flow in CO 2 ch4 c2h4 C2H6 scfh 9/1/71 9/3/71 9/4/71 9/5/71 9/6/71 9/7/71 9/8/71 9/15/71 9/29/71 4017 12,200 5687 4957 2568 3708 4620 2435 3528 362 420 750 719 2600 800 1500 332 540 3685 3500 3365 3426 3800 3500 3500 2890 5520 12,800 5584 4503 6100 9400 12,500 8691 515 6 3704 3 217 17 5728 20 15,012 - 5061 - 12,666 15 1234 - 5673 30 4765 2765 Nil 2790 11,111 1432 2049 1975 4444 5925 1.7 1.06 1.82 1.65 2.00 2.50 2.20 1.32 1.19 1.0 0.20 0.12 Nil 0.10 1.80 1.50 0.25 0.26 2.0 8.04 2.20 1.80 2.23 2.80 2.70 1.60 1.92 Nil 0.50 0.12 0.13 0.10 0.32 0.36 0.13 0.11 0.6 6.17 0.74 0.73 1.40 1.20 1.20 0.81 0.21 Nil Nil Nil Nil Nil 0.03 Nil Nil Nil 624,800 - o o 73 O O O o o o W1 h- UJ Water Sampling i Air Sampling i Primary Water Treatment Secondary Waste , Treatment C-500 prescrubber Copper Removal System Low Pressure Con densate Collection System Dry Crude Tank Fume Scrubber Slop Caustic Collec tion System I Chromate Removal System New Exchanger for C-101 ^090000 >100 ENVIRONMENTAL HEALTH PROJECTS - VCM PLANT January 1st Quarter January to December 1971 April _________ 2nd Quarter_____________ July 3rd Quarter Process Engineering_^a_nd__Laboratory c October 4th Quarter Process __ Engineering and Lab oratory ^.Rebuild of Steam Stripper Install Qil_ Skimmer^ .Startup IF Rebuild Roof L CEP Design Work m_. ^ i ..... Turcnasins J --- 7- ;, Purchasing v:____ K- * Construction -_______ ) Construction Startup ! Replace; Spray Nozzle <*=----------- , ^Purchasing^ 6 Construction;. Repair Damage TTriish Construction , Tie-ins. c-jr: Purchasing rmaf. i3,, .Construction Test.. . &=-5r--?* Purchasing Engineering Purchase 3* Construction JHaot Testing .Startup, Estimate tT~?-------- :-- ^jyfcchanical Engineering^ Construction