ON HYGIENE - LEAD ALKYLS AREA September 15, 1966
1. Autoclave Disc Ruptures.
(a) Effect of ch arge size -- Data in dicates in cr ease in frequency of late
but includes^ case s of known instrument trouble and operator e r r o r .
Continue on 3500# ch ar ge.
(b) IEffect of non-condensibles - TML - Data w as presen ted to show that . autoclave p r essu r e r ise s m ore rapidly if 'clave is "kicked" with nitrogen
than if not kicked. Th is would aggravate problem with disc rupture at , feedoff. It w as noted that the four units with triple sn iff r ate at the j st ar t (rath er than double rate) have had no d isc ruptures at feedoff. It w as decided to proceed immediately to put all units on triple Sniff and adjust MeCl feed to compensate for in creased sn iff if needed to con trol final reaction m ass tem perature.
2. Hugged Drop Legs
(a) | Flush ing of droplegs seem s to have made a m arked improvement in "C" building sin ce it w as star ted.
(b) "D" building TML droplegs ar e also being flush ed and none'have plugged to date. One of th ese units h as a new Teflon -coated dropleg and the oth er five were thoroughly clean ed when they were converted to TML ser vice.
3. Hemeon's Recommendations (Ventilation Consultant)
(a) Have not received h is form al r eport.
co (b) Blank gen eral exh au sts.
,
00026;
. Bldg, in spected and potential exh austs to be blanked listed for con- ,
. sideration . ' ' /.. .
. ' . ' . ' . - '
' . ' ' '
' Not all agree that gen eral exh aust is wasted and that such should be
blanked.
Alternatives - -
h i (1) On Hemeon's advice, located additional leak sou r ces to exh aust or
th ose where additional flow is needed and provide the required exh aust.
: Balance th is by blanking off an equivalent ar e a of gen eral exh aust.
(2) Seek another expert (Dr . Fu r st ) and get h is opinion to check Herneon.
(3) Go off on t r ial and e r r o r on our own,
Action - concurrently: (1) - Seek D r . Fu r st as consultant.
. --
(c) Blank 4th floor supply - - no action at presen t - - await second consultant's
' !' advice. "
: .;/
v
^ (d) Contamination from Tails gas lin es - - proceed on smoke gen erator.
.
4. Leak Testin g Device. - -
'
,: -
Such available, flame ionization an alyzer, which is explosion -proof and m ay . be of value. Investigation to continue. Cost approxim ately $3, 000. *
5. Mebhanical Development Recommendations - see memo.
.
;' '
'.
..
. -
Act ion :
-
ia) I Check out recycle up to 3 tim es look at Houston design .
, ,
' , il
(b) ! In creased seatin g p r essu r e not too important.
V
(c ) , Will try Teflon "self- m old ".
;|
(d) "Liquid-O-Ring" being used.
^
(e) Replace angle valve t est cock (and oth ers of sam e type) on 3 units in "C"
bldg, and 3 units in "B" bldg.
'
6. Houston Maintenance Procedures - - see copies of Maintenance Procedures.
7. Gen eral - "C" Bld g..
. --
(a) Nitrogen purge - st ill som e hoppers which cannot be purged because of
SS fittin g.
- .
. ' ' . '
..
(b) Again sample elevator to check improvement, if any.
;
JFM c E/T C C
^