BrownCT Root. Inc Posi Otf'ce 3o* Three. Hc.sisr Tetjs 77X1
F E "3 < 1 1 J U N
TO: J. E. Wood**rd
CATE: July '3, 3 330
F3CM:
Ron*Id Christessoh
SUBJECT: Brown 4 Root - Chevron Sifety Meeting
RE: UUctents (!) Memo of 9 July, 1980: J.E. Wood**rj to F.w. 3*11 "S*fety Procedures - Asbestos Insulation
(2) Brown 4 Soot Asbestos Kindling Procedures
(3) Chevron Asbestos Kindling Procedures
ATTENDEES
Brown 4 Root
Frink Taney Renild.Chrlstesson
Chevron
Bob Tiggert Ch*rlie Albritton Hirty Bowln
On July 17, 1980, * nesting wis held *t the Chevron jobsite In Pascagculi, Mississippi to dlseuss srooosed procedures for Brown 4 Scot's hinilirg, monitoring, *nd dlsposil of asbestos Insulitlon on the Chevron Project. The following agreements were reiehed during the course of this discussion:
(1) It wes igreed thit Brown 4 Root's procedures for isbestos hindllng ire compatible to those used by Chevron md ire iceeptible for the Project's needs.
Chevron representatives offered Brown 4 Root employees the use of disposable respirators 4 paper-type coveralls, avilltble at the Chevron storehouse, for prottetion In eecoeipllshlng this work. Disposal of the same shall comply with Chevron Asbestos Handling Procedures.
(2) Chevron's representatives asserted that monitoring during asbestos handling would be unnecessary based upon results from previous monitoring reports. Brown 4 Root's represent* stives recoemended monitoring this asbestos work In compllines with the section entitled 'Monitoring* within the Asbestos Program of the Petrolem 4 Chemical Division.
&T5WT1 irRodlrc.
Page 2 July 13, 1333 3rcwrt 1 Root-Chevron Safety Meeting
' (3) Regarding the ditsos* 1 of asbestos waste, Chevron represe":a:i*es advised Brown i Soot that this 1$ not possible within the state if Hijsissippi Rue -3 legal restrict-.ons. It was -econ-ersed that 3rown I Root contact Hr. Janes 3. Phillips if the environ, rental Pollution Control, Inc., ?. 3. 3a* I445, Jaeison, "iss. prone (S31) 331-3224. Hr. Phillips will assist In tre asoestos disposal by coordinating the transportation and permitting necessary to nave this done In Alabama. Chevron recorrercs Brown t Root compile an estimate of the asbestos disposal requested to be submitted to Hr. Phillips In advance.
These things accomolished, this meeting was adjourned with the general consensus that the agreements reached would achieve completion of tr.e asbestos worn In a safe manner.
If you have any questions, please contact the undersigned.
Stneerely,
RC/tlb
Ronald Christesson