REACTOR SAFETY QUESTIONNAIRE
Dear V'CSA Member,
Reactor safety and prevention of vinyl chloride releases to the atmosphere from polymerization vessels are topics of utmost concern to us In the PVC Industry. Environmental agencies, particularly In the U.S., have adopted harsh stances and levied stiff fines on relatively small vinyl chloride releases 1n- recent years. The purpose of this questionnaire Is to provide an update to procedures, equipment, and precautions taken to prevent VCM releases from reactors. Results will be presented and discussed at the October general meeting later this year.
NOTE:
Multi-plant companies may wish to copy the survey and list separate answers from each plant If procedures/equipment vary greatly, or you may give a "composite/majority" response on one questionnaire.
Please send replies by 31 August 1986 to:
Harold G. Coleman Plastics Technology - R & D Lab #3 Air Products and Chemicals, Inc. P. 0. Box 538 Allentown, PA 18105
i4ai
CTL020038
REACTOR SAFETY QUESTIONNAIRE
I. HYOROSTAT PREVENTION OURING BATCH CHARGE - please complete the following table and answer the questions.
Batch Inqredlent
PRIMARY MEASUREMENT__________
Measuring Calibration
Device
Frequency Reliability
____________ BACK-UP MEASUREMENT
Measuring Calibration
Device
Frequency Rel1 a b1111v
Water VCM Others:
We have no process water MA
E
Meter
A
E
Example: Water Key:
M (turbine)
Device
M = meter (type) L = level transmitter (type) W = weight VI = visual Inspection In reactor 0 * other (type)
NOTES:
L (DP), VI
Calibration Frequency
W a weekly M = monthly 0 = quarterly S = semi-annually A * annually N = as needed (maintenance)
Reliability
E excellent G good A average F fair P poor
QUESTIONS
la. Is a visual Inspection made after charging Is complete, before heat-up?
YES NO
lb. After heating to reaction temperature?
YES NO
X X
>4ai
CTL020039
REACTOR SAFETY QUESTIONNAIRE
Are high level alarms employed on reactors?
YES _____
NO __x
Type of Device ______________________
Reliability
Problems or Comments: ___________________________________________________________
Are reactor charge valve(s)
MANUAL _____ or AUTOMATIC X
Computer controlled?
YES X
Problems or Comments: _______ ________________ ___________
(check one)? no _____
How do you ensure that reactor Is empty prior to charging?
The reactor is checked that it be empty before charging.
What Is your typical batch tillage (batch charge volume/actual reactor volume)? 40 X
CONTROLLING RUNAWAY REACTIONS
1. What process measurements are used to Indicate a "problem" batch, a "first alert" as opposed to an uncontrollable situation? (Check where appropriate.)
a. Pressure b. . Temperature c. Other
_____
How many PSI above reaction pressure?
_____
_____
How many F above reaction temperature? _____
Water flow to the main cooling devices is monitored
and an alarm is set to preact to a problem batch
occurinq.
CTL020040
REACTOR SAFETY QUESTIONNAIRE
What Is don/e at this time? (Check where appropriate.)
a. Rate of reaction moderated with retardant/shortstop _____
b. Batch partially dropped to another vessel
_____
c. Batch killed with shortstop
_____
d. Other
Extra cooling is started and emergency
degassing is begun.
What process measurements are used to Indicate an emergency situation leading to an eminent release? (Check where appropriate.)
a. Pressure
25 How p$i above reaction pressure?
b. Temperature _____
How many F above reaction temperature?
c. Agitation
low amps _____
low RPM _____
high amps _____
d. Power Failure x
e. Other
_______________
___ ___
g. Combinations (e.g., T & P)
Please Indicate the actions taken at this point to prevent an uncontrolled release to the atmosphere. Number them sequentially In the order In which they are performed.
t add shortstop (manually or automatically) _____ drop part of batch to another vessel
1 extra cooling (e.g., water on dome) 2_______ vent to recovery system _____ controlled vent to atmosphere
CTL02004i
REACTOR SAFETY QUESTIONNAIRE
5. For each type/size reac.tor you have, please provide the following data:
Reactor Volume (U.S. Gal)
Reactor Pressure Rating (PSIG)
Rupture Disc
Rating (PSIG1
Safety Relief Valve
Set-pressure (PSIG)
Maximum Normal Reaction Pressure (PSIG1
14,000 gal.
72 5 p<5ig
? 1 7 Psi9
None
135
.6 Please describe your shortstop addition system: (Check where appropriate.)
_____
a. FULLY AUTOMATIC - when certain conditions are reached, shortstop Is mechanically Injected; no action needed by operator.
b. SEMI-AUTOMATIC - when certain conditions are reached, shortstop Is mechanically Injected, but operator must somehow activate the system
(as by pushing a button).
X c. MANUAL - addition Is totally manual by operator. (For example, shortstop Is added to a pot, a valve Is opened and shortstop drains Into reactor.)
d. No shortstop system exists or none Is used.
e. Other (please describe) _______ _
7.
>421
If system Is fully automatic, can operator activate system manually before It Is activated by the process?
YES NO _____
N/A _X___
CTL020042
REACTOR SAFETY QUESTIONNAIRE
Shortstop Is added by (check where appropriate):
a. Pump b. Nitrogen Pressure c. Gravity d. Rupture Oise e. Other (please describe
_____ _____
X _____ _____________________
Is your shortstop system Independent for each reactor or a common system for several reactors? (Check appropriate response.)
a. Independent b. Common c. Both
X _____ _____
Please offer any general comments about your shortstop system concerning reliability, effectiveness, non-emergency batch kills, etc.
CTL020043
REACTOR SAFETY QUESTIONNAIRE
III. MISCELLANEOUS
1. How often do you Inspect reactor nozzles for PVC build-up or pluggage? (Check one.)
Safety Valve Nozzle!s)
Pressure Transmitter
Nozzle(s)
a. Never b. Every cleaning c. Every ___ batches
_____ _____ _____
_____ _____ _____
d. Every batch e. Every reactor opening
_____ _____
_____ _____
f. Other (describe)
Saffitly--va 1 vt?--nn77lgs ago--checked--each batch-
pressure transmitter nozzles are checked annually.
2. Do you have dual (redundant) pressure transmitters on your reactors?
a. Yes x b. No _____
3. Please Indicate what form(s) of back-up electrical power you have. (Check where appropriate.)
a. Emergency generator
_____
b. Second source
X
c. Other___________________________________________________
Please send replies by 31 August 1986 to:
Harold G. Coleman Plastics Technology - R & D Lab #3 Air Products and Chemicals, Inc. P. 0. Box 538 Allentown, PA 18105