Document 71LNvVJb8Em9YmoaZVO9OB0xo

SU8JECT: AS8EST0S PAGE: 3 OF 3 LAST REVISED: 11/09/87 UNION CARBIDE CORPORATION TEXAS CITY PLANT Plant Procedure SH-5.6 Attachment #1 NOTICE OF INTENTION TO DEMOLISH OR RENOVATE A STRUCTURE OR FACILITY CONTAINING ASBESTOS MATERIAL 1. Description of the facility: ^2 SQ.C rcf/u* clyum (3 fi/ 2. Estimate of approximate amount of friable asbestos materials present: (Area in sq. ft. or linear ft.) Estimation technique used: n T) L IT-3. Estimated age of asbestos material: 2.1 4 . Location of facility: _________ 5. Scheduled starting day: &//W{ Scheduled completion day: %jl^j 1(1 6. Nature of planned demolition or renovation: eme/j&nc^ rr^ovaL- jVcsV a IcaK And inrltcjej p'.i*. 5prc<2 3rvr/e. Corrosion_______ Method to be used (negative pressure enclosure, glove bag, etc.): __ prfiture encloSMCf_________________ f Name of person that prepared the form: TV R- Sclooeo .ocation and telephone number: Q7,____ S To3 Date: NOTE: This form must be completed and delivered to the EP Department (Bldg. #1) at least 30 days ahead of the scheduled starting day of the planned demolition or renovation, or as soon as possible following an emergency renovation operation. April 1985/Revised November 1987 #0184s UCTC 18675