Document 71JKrx7LaJnxz55DJGMZLDV6g
December 21, 1992
To: Bill Q*Brien - Calvert City Plant Subject: ^orpor^te E, H&S Audit Final Report
Enclosed is youi copy of the final report concerning the Corporate E,H&S audit, conducted October 19-23, 1992
Note the following requirements for developing and submitting your Corrective Action Plan Report:
1) A draft Corrective Action Plan is due to Mike Marshall before January 22, 1993.
2) All findings contained in the final audit report must be addressed in your Corrective Action Plan. If the finding has already been corrected, include a description of what was done and the date it was completed.
3) The Corrective Action Plan must include:
a) Corrective actions for each unresolved, specific audit finding,
b) The identification of the person(s) responsible for completing the corrective actions, and
c) The expected completion date(s).
4) Following a review of your draft plan, the division is responsible for issuing your final Corrective Action Plan to Corporate.
5) Quarterly status reports will be required from you until all
audit findings have been resolved. Notes will be sent by the division to the plant reminding them when these reports are due.
As a "BFG Restricted" document, this audit report should not be copied except where essential for the communication and resolution of the audit findings.
If you or your staff have any questions. pleas
us know,
cc:
M.M.Marshall C.J.Nosal W.C.Holbrook H.Waltemate D.E.Gleghorn D.Trimble - Bath
93/04
NGC 13179
AUAiT fit ct
October 30, 1992
To From
Bill O'Brian Herm Waltemate
Calvert City Cleveland
SAFETY AUDIT ITEMS TO BE CORRECTED
The following items were noted during the recent BF6 Corporate Safety, Health and Environmental audit.
The format is laid out for you to write in your abatement program and indicate the status as Completed, In-Progress, or Incomplete. A progress report giving the status of the items requiring attention is due December 30, 1992 and each quarter thereafter until all items have been corrected. Also include all of the items from the July 30 - August 3, 1990 Safety Audit which have not already been reported as being brought to closure.
For your convenience, I have included the word processing disc on which you can enter your response.
H. Waltemate
CALVITEM.HW/JS
cc:
R. Grahek/M. Marshall E. Martinelli/W. Patient J. Gressler - Calvert City S. Guidry/C. Nosal -- Houston
NGC 13180
CALVERT CITY SAFETY AUDIT OCTOBER 12-23, 1992
1992 Items to Be Corrected
SA--1992--1 A management system for the auditing of individual employees with regard to Lockout, Hot Work, Vessel Entry and Forklift Trailer Entry needs to be established. These audits need to be documented.
The individual lockout audits are a requirement of OSHA Standard 1910.147 Control of Hazardous Energy (Lockout/Tagout).
Plant Response
Status _________ Complete
in-Progress
Incomplete
SA-1992-2 OSHA recently issued a Directive covering 1910.119 Management of Highly Hazardous Chemicals. The directive comments on the potential hazards such as pipework in risk of impact.
I would suggest a review be made of all your piperacks crossing plant roadways. This should include the support structure.
Plant Response
Status _________ Complete
_________ In-Progress
_________ Incomplete 2
NGC 13181
SA-1992-3
A written procedure for controlling the lifting of equipment
over hazardous material process lines needs to be prepared. This item is also in the OSHA Directive on 29 CFR 1910.119 Management of Highly Hazardous chemicals.
Plant Response
Status _________ Complete
In-Progress
incomplete
SA-1992-4 A review of all exits need to be conducted. Lighted exit signs need to be provided where required. Exit signs in the Boiler House are not lighted. Also all fenceline gates need to be identified with a sign and because of the volume of Chlorine handled in the plant the gates need to have an unimpeded means of exit.
Plant Response
Status _________ Complete
In-Progress
Incomplete
NGC 13182
3
a
SA-1992--5 In 1992 the GVD/SP&C Divisions have experienced several recordable injuries involving second degree burns. Currently, second degree bums make up 23 percent of our total recordable cases. All plants are being urged to inspect for hot surfaces (140F) which might cause burns and take preventative measures. You need to audit the plant for hot surfaces and proceed with insulation, guarding or post warning signs.
Plant Response
Status _________ Complete
in-Progress
Incomplete
SA--1992--6 A plantwide audit on water outlets without proper identification needs to be conducted. Outlets which could be mistaken need to be identified as to the type of water (potable/nonpotable).
Several outlets in the E&E area need identification.
Plant Response
Status _________ Complete
In-Progress
incomplete
NGC 13183
4
#
SA-1992-7 A management system which assures proper closure needs to be established. This should include issues identified in audits, narrative reports, iri inspections, HAZOPS etc.
Plant Response
Status __________ complete
In-Progress
Incomplete
calvitem.hw/js
NOC 13184