FILE NAME: Union Carbide (UC) DATE: 1987 Feb 6 DOC#: UC115 DOCUMENT DESCRIPTION: Memo RE Asbestos Removal Strategy with Report
fig e
- F * r jv ~ \-JL
(F- / h k ^ b n
_ yU0*t~V -
Cr^Abvic^ pb^Mj.
-f a
Ca/ & h i * f j i \
UCC 007043
UNION CARBIDE CORPORATION Spcialty Chemicals Division
Sistersville, WV
February 6, 1987
MEMO TO: COPY TO:
SUBJECT:
D. G. Beddow K. F. Carroll L. W. Phair
E. L. Doerflein R. A. Hazelwood D. Liebeskind C. Rotthoff A. Walker G. W. Wulfert
Asbestos Removal Strategy
Please find attached a brief on the strategy and resources to meet the newly required OSHA asbestos handling guidelines,, Particularly noteworthy are:
* Additional resources approaching $350,000/year.
* Major insulation craft productivity loss.
* Use of encapsulation techniques without negative air systems. Please be prepared to review at our next managers' meeting.
For the cause,
WVS/jec Attachment 238 2A
W. V. Summers
UCC 007044
SISTERSVILLE PLANT ASBESTOS STRATEGY
1. Plant will meet the OSHA intent for additional personnel protection.
2. Industrial hygiene will monitor asbestos procedures and methods to ensure exposure levels are below 0.1 F/CC or that work
procedures are commensurate for levels in excess of 0. F/CC.
3. Asbestos monitoring will be done within the sistersvilie plant laboratory to facilitiate maintenance productivity.
4. A decision process by maintenance management will be used in selecting the proper procedure to remove asbestos.
A. Emergency jobs (spill, leak, fire hazard or other imminent safety and/or environmental threat).
* Wetting is appropriate for emergency removal in conjunction with required breath in g/ fi lte r'devices.
B. Routine, short duration jobs.
* Utilize glovebag technique which includes vacuum and wetting techniques.
* It is appropriate to move bag along the pipe.
C. Encapsulation of asbestos.
* Use of lag-seal or other encapsulant is appropriate without negative air system.
* I/H samples should be taken to confirm past exposure profile and history of less than 0.1 F/CC.
D. Major asbestos removal (indoor or outdoor)
* The negative air technique is to be employed.
All other means of the new OSHA guidelines will be adhered to (decontamination facilities, shower, clean room, etc.).
5. Resources required to meet OSHA guidelines.
Materials :
* Stock glove bags * G. B. vacuum unit k Stock lag seal encapsulant * Purchase decontamination trailer * Laboratory analytical equipment * Negative air vacuum/HEVA filtration units
* 2000/1000 CFM unit * 600 CFM unit * New respirators * Scaffolding/misc supplies
& 3,0 00 6. 2,5 00 $ 2,000 $ 25,000 $ 10,000 $ 6,000
$ 1, 000 $ 10,000 $ 61,500
UCC 007045
Sistersville Plant Asbestos Strategy, Continued
Personnel
* One additional lab technician * Four insulators to offset productivity loss * Contractor for tent building/scaffolding
$ 50,000 $160,000 $ 100,000
$310,000
Above requirements are unbudgeted items and will require budget overrun exceptions.
6. Other Considerations
* Consider use of contractor for all major asbestos removal jobs. Utilize maintenance for application of insulation and
small removal jobs.
* Address/compare other locations strategy at next maintenance managers meeting.
* Modify scope of asbestos insulation project ($2.1MM) to:
* Contract encapsulation of all exposed asbestos within the
plant.
* Identify by marking all asbestos insulation.
f
* Upgrade/removal asbestos as necessary.
* Project should receive priority approval.
* Company needs to take position on whether to: 1. Upgrade/encapsulate/remove asbestos insulation, or 2. Totally remove from plant.
I believe that in the next 5-7 years the government will legislate removal from the workplace. All future upgrade projects should be aimed at Total R e m o v a l .
* Implement plant wide asbestos removal training program.
wvs 2382A
UCC 007046
' y
DRAFT ASBESTOS CONTAINING MATERIAL - REMOVAL AND DISPOSAL
Purpose:
Establish requirements for the removal, cleanup and disposal of materialscontaining asbestos.
Introduction:
This procedure is written to ensure compliance with all applicable OSHA end Union Carbide Corporation's Requirements and Regulations. Compliance with this procedure w ill ensure proper handling and preparation of asbestos containing materials for removal end disposal in such manner as to prevent unnecessary exposures of employees to asbestos fibers.
Definition:
For the purpose of this procedure, asbestos shall be defined as any material that contains chrysotile, amosite, crocidolite, tremolite, enthophyllite, and actinolite asbestos.
Competent person, means an employee who has a responsibility to oversee the project involving the asbestos abatement to ensure the work is carried out in compliance with the requirements of the OSHA standard. This individual shall have training in all aspects of asbestos abatement. Such training shall be obtained in a comprehensive course such as conducted by on EPA Asbestos Training Center.
Regulated area means an area where airborne concentrations of asbestos can reasonably expected to exceed the permissible exposure limit.
Exposure lim its:
Permissible Exposure Lim it (Based on on eight-hour time-weighted average (TWA8))
0.2 fiber/cc of air 1
Action Level Exposure Lim it (TWA8)
0.1 fiber/cc of air
-
1 -
UCC 007047
General Requirements:
1.
Street cloths shall not be worn by employees involved in the
asbestos abatement projects.
2.
Two sets of coveralls shall be worn by all employees involved in
the asbestos abatement project.
3.
The outer set of coveralls shall be disposable type and the inner
set of coveralls shall be either disposable or reusable type.
4.
The inner set of coveralls shall be made of such suitable material
that keeps the employee warm in the winter and relatively cool in
the hot work environments.
5.
If inner set of coveralls are reusable type they shall be washed at
the end of the work day.
6.
Disposable head covering shell be worn at all times while in the
regulated area. Disposable coveralls equipped with hood are
acceptable with provision for elastic in the arm sleeves and pant
legs.
7.
Disposable overshoes or rubber boots shall be used at all time in
the regulated area. Disposable overshoes shall be removed when
going outside of the regulated area. If rubber boots are used they
shall be washed and cleaned before going outside of the regulated
area.
8.
Rubber gloves shall be used while conducting asbestos abatement
project. Gloves w ill be disposed off at the end of the work day.
9.
Respiratory protective equipment shall be worn by all employees
in the regulated area.
10. .
Full face supplied air respirator in a positive pressure mode Shan be used in all asbestos abatement projects, except, high efficiency particulate air (HEPA) filter negative pressure respirator shall be used when employees are being monitored for exposure to asbestos by the Industrial Hygiene Department or when using glove bog technique for exposure control.
- 2UCC 007048
11.
All major asbestos abatement projects will require a detailed
project review by the Technical Center Industrial Hygienist.
12.
Regulated area shall be demarcated in all asbestos abatement
projects. The following types of regulated areas shall be
considered for each job.
Negative Pressure Enclosure:
A s the name suggest this system maintains negative pressure within the enclosed work area compered with that of the outside environment. The negative pressure inside the enclosure shall be achieved by means of HEPA-filtered power exhaust unit.
The enclosure shall be fabricated with 6-m il polyethylene plastic and lumber or other material for support where the existing w alls are not available.
All openings inside the negative pressure enclosure shall be sealed with 6-m il polyethylene plastic and tape to prevent airborne asbestos from escaping into areas outside of the work area. Openings that require sealing are typically found around electric conduits, telephone wires, water supply and drain pipes, air supply and exhaust ducts.
Glove Bog Enclosure:
Small scale jobs shall be conducted using the glove bag technique. Glove bogs are fitted with arms through which the work can be performed. It allows workers isolation from the asbestos containing material being removed inside the glove bog.
The bags shall be made of transparent 7-m il thick polyethylene plastic fitted with arms equipped with rubber gloves. The glove bags shall have a tool pouch and a port for introducing spray nozzel end vacuum hose.
These bags shall be considered as single use control device and disposed of at the end of each job.
- 3UCC 007049
The glove bag shall be installed in such a manner that they completely cover pipe or the other structure where asbestos removal work is to be done. All openings in the bag must be sealed using the duct tope.
A minimum protective equipment required while using the glove bag for asbestos abatement is single disposable body coverall, head cover, HEPA filter negative pressure respirator, and disposable shoe covers or rubber boots.
Sufficient warning signs shall be posted around the regulated area to worn all employees of the asbestos hazard. The sign and the regulated area shall remain in place until the job is completed. The warning sign shall read:
DANGER ASBESTOS CANCER AND LUNG DISEASE HAZARD AUTHORIZED PERSONNEL ONLY RESPIRATORS AND PROTECTIVE CLOTHING ARE REQUIRED IN THIS AREA
Employees shall not eat, drink, smoke, chew tobacco or gum, or apply cosmetics in the restricted area.
Access to regulated areas shall be limited to authorized fully protected persons.
High-speed abrasive disc saw s that are not equipped with appropriate engineering contols shall not be used for work related to asbestos.
Compressed air shall not be used to remove asbestos unless the compressed air is used in conjunction with an enclosed ventilation system designed to capture the dust cloud created by the compressed air.
Wetting the asbestos material shall be achieved by using amended water or formulated wetting agents to reduce the number of fibers from becoming airborne.
- 4UCC 007050
19.
Any residue that remains on the surface of the object from which
asbestos is being removed shall be cleaned by wet method or by
HEPA equipped vacuum cleaner.
20.
Asbestos material shall be removed and placed directly into a
prelabeled bag for proper disposal in accordance with the location
Environmental Protection disposal procedures.
The label shall contain the following information:
DANGER CONTAINS ASBESTOS FIBERS AVOID CREATING DUST CANCER AND LUNG DISEASE HAZARD
21.
Disposable coveralls, polyethylene plastic enclosure material,
filters used on negative pressure exhauster shall be disposed of in
the some manner os the asbestos material. Respirator shall be
worn at all times during the cleaning and disposal procedure.
22.
Before leaving the regulated area for luch, breaks, or at the end of
the work day employees shall clean the outer coverall with HEPA
equipped vacuum cleaner and wet clean the rubber shoes.
The outer coveralls including head cover and shoe covers, if used, shall be placed in the asbestos disposal bag.
23.
Employees shall wash their hands and face in a clean facility
before lunch or coffee breaks.
24.
Employees shall take shover before putting on their street cloths
and leaving the plant premises.
Responsibility of Craft supervisor or suprintendent:
a.
consult with the owner of the piping or equipment from which the
insulation is to be removed to determine if the insulation contains
asbestos.
- 5UCC 007051
Hy,
b.
if it can not be determined that the insulation material contains
asbestos, the responsible craft supervisor or suprintendent shall
provide a sample of the material for analysis to the Technical
Center industrial Hygiene Department.
c.
any job involving the demolition of any structural member
containing friable asbestos material or any job involving the
removal of at least 160 sqare feet or atleast 260 linear feet of
insulation shall notify the location Environmental Protection
Department for approval prior to the start of the job.
d.
notify the Technical Center Industrial Hygienist at extension
3750, the intention of removal of the asbestos containing
insulation.
e.
if needed, set up an inspection and planning review with the
Industrial Hygienist for determining procedure to be used for
removal of asbestos insulation.
f.
fill out a supervisor's report ( attachment I) for
asbestos insulation removal and disposal, send the report to
Industrial Hygienist for each day the work is performed for
asbestos removal.
g.
insure a competent person shell be available to oversee the
project through completion.
h.
insure that all employees including laborers, involved in the
asbestos abatement work, have been provided:
i.
asbestos training by the Technical Center Industrial
Hygiene Deportment within last twelve months,
ii.
training in the use of respiratory protective
equipment which includes fit test, proper use, care,
end lim itations of the equipment. If employees are
required to use High Efficiency Particulate Air (HEPA)
filter negative pressure respirator, the training must
have been done within the last six months,
iii.
medical examination within last twelve months.
- 6-
UCC 007052
i.
notify Industrial Hygiene, Medical and Safety Deportments when on
employee is added or deleted from use in the asbestos abatement
project.
j.
provide o list of employees, used in the asbestos abatement
projects, to Industriol Hygiene deportment for verifying
compliance with the OSHA requirements. The list shall contain the
dates of Industrial Hygiene training, respiratory protection
training, ond medical surveillance.
k.
when industrial hygiene exposure monitoring is conducted, the
results shall be communicated to affected employees and written
ducumentation shall be obtained by having employees to sign the
report. The signed report shall be returned to Technical Center
Industriol Hygienist Building 701, room 330.
l.
plan and provide necessary personal protective equipment and
other supplies specified in the general requirement section of this
procedure to ensure sotisfoctory completion of the work.
RESPONSIBILITY OF COMPETENT PERSON:
a.
ensure the integrity of the enclosure
b.
control entry to ond exit from the enclosure
c.
supervise employees being monitored by Industriol Hygiene
Deportment
d.
ensure the use of protective clothing and equipment
e.
ensure that employees are trained in the use of engineering
controls, work practices, and personal protective equipment
f.
ensure the use of hygiene facilities and the observance of proper
decontamination procedures
g.
ensure that engineering controls are functioning properly
h.
ensure that unauthorised personnel do not enter the restricted
area
- 7UCC 007053
i.
ensure that the asbestos waste is properly disposed
j.
ensure that the supervisor's report is sent to Technical Center
Industrial Hygienist.
RESPONSIBILITY OF INDUSTRIAL HYGIENE DEPARTMENT:
Help management stay in compliance with the regulatory requirements by
providing:
'
a.
technical assistance
b.
employee's training
c.
recommendations for personal protective equipment
d.
recommendations for procedures
e.
recommendations for equipment used for asbestos abatement
f.
exposure monitoring of employees
g.
repository of records for documentation of compliance
h.
liaison to other location Industrial Hygiene personnel
RESPONSIBILITY OF SAFETY DEPARTMENT:
a.
provide respiratory protection training
b.
provide personal protective equipment
c.
maintain training records
- 8UCC 007054
VI >
RESPONSIBILITY OF MEDICAL DEPARTMENT:
A.
provide medical clearance for respiratory fit test for employees
involved in the asbestos abatement project.
B.
provide medical surveillance to employees in accordance with the
requirements of the OSHA standard 29 CFR 1926.58 which shall
include:
a.
initial employee's questionnaire and medical examination
b.
annual employee's questionnaire and medical examination
- 9UCC 007055
ASBESTOS INSOLATION REMOVAL AND DISPOSAL CONSTRUCTION/SERVICES DEPARTMENT SUPERVISOR'S REPORT
(LOCATION OF 008:) PLANT:
AREA:
Z O N E ____ BLDG:
JOB SUPERVISOR: .............................
DATE JOB PERFORMED:
DESCRIPTION OF JOB: .................................................
LOCATION ASBESTOS INSULATION DISPOSED: .......... .......... .......
ESTIMATED FEET REMOVED: .................. LINEAL FEET .... .......
EMPLOYEES INVOLVED IN ACTUAL JOB(S): ........................
UNIT: SQUARE FEET
Plant 511 Hygienist notified (M. A. Patel - ext. 3750) Negative pressure enclosure feasible? Negative pressure enclosure installed? Use of Glove Bag feasible? Glove Bag used? Barrier tape used Warning signs used Protective clothing used - boots, head cover, gloves, coveralls Outer coverall vacuumed before removing Outer coverall removed before leaving barricaded area Plastic used on floor and over equipment Area vacuumed Employee showered before reapplying street clothes Proper clean-up (area housekeeping) Barricades down (after clean-up only) Employee(s) monitored by Industrial Hygiene Type of respirator used:
Half-face AO R57-A (HEPA) Half-face Willson R-12 (HEPA) Supplied Air-Full Face - Positive Pressure Employee trained for respirator in last 6 months (If not using Supplied Air - Positive Pressure) Employee trained for OSHA Asbestos Standard in last 12 months COMMENTS:
YES
NO N/A
Return of the
_______________________________ Telephone
(Form Filed By:) filled out form (original) after completion job to: M. A. Patel - Bldg. 701/330 .
:________ ___ 1791P
UCC 007056