Document 71Eqdkb9rjrwk1eZyObZ6jRmE
UNION CARBIDE CORPORATION SPECIALTY CHEMICALS DIVISION
Technical Center South Charleston, West Virginia
UCC BUSINESS CONFIDENTIAL
September 30, 1986
TO: J. F. Flynn A. Walker
COPY TO:
J. R. Barber 0. G. Beddow K. Carter M. G. Dwye r M. D. Falrall R. L. Foster D. A. Gosselln R. A. Hazlewood
R. P. Lelchllter 0. Llebesklnd M. R. Mazuroskl J. E. McKeon, Jr D. G. Moshler L. W. Phalr W. V. Summers, Ji G. W. Wulfert
SUBJECT:
Outline of Project Insulation Upgrade - Phase I Slstersvllle Plant
The subject Outline of Project describes the work planned to begin upgrading asbestos Insulation for compliance with Occupational Safety and Health Asbestos Standard 1910.1001. This Phase I project will upgrade about 60% of the plant asbestos Insulation and require a capital expense authorization of $1,500M and a 838 expense authorization of $600M. The project Is planned to be executed over the period 4Q86 thru 2Q89 to ensure effective execution and spread the dollars expenditures.
In early 1989, funds for a Phase II Insulation Upgrade project will be requested to cover the remaining 40% of the plant Insulation upgrade. This Phase II project will require about $1,600M and $600M of Capital and 838 Expense funds, respectively, and Is planned to be Implemented In 1989-1991.
The scope of the Phase I project was defined by the Slstersvllle Plant Maintenance Department. Detail equipment and pipeline listings for each sub-section of the prioritized Unit Areas were defined in the Outline of Project. (A copy of the listing Is avallabe on request). These listings were then used to prepare manpower and materials requirement and the cost estimate for the project.
UCC 020035
PLAINTIFF'S EXHIBIT UC-4001
Outline of Project
-2- September 30, 1986
Plant Engineering will provide project management and engineering consultation to Plant Maintenance, who has field management and execution responsibility for the project.
The Outline of Project has been endorsed by:
J. R. Barber W. 0. Bradbury, Jr. D. Llebesklnd L. W. Phalr
R&D Engineering HS&EA Manufacturing
This document Is Issued for your Capital Budget Proposal.
nal endorsement and preparation of a
WDBJr:pr
UCC 020036
SISTERSVILLE PLANT ENGINEERING SPECIALTY CHEMICALS DIVISION
OUTLINE OF PROJECT INSULATION UPGRADE - PHASE I
SISTERSVILLE PLANT SISTERSVILLE. WV
SEPTEMBER 29. 1986
UCC 020037
OUTLINE OF PROJECT
INSULATION UPGRADE - PHASE I SISTERSVILLE PLANT
TABLE OF CONTENTS
I. INTRODUCTION
11. SUMMARY
III. SPONSOR'S OBJECTIVES IV. FACILITIES
V. ENVIRONMENTAL PROTECTION/OCCUPATIONAL HEALTH AND SAFETY CONSIDERATIONS
VI. SUPPORTING FACILITIES
VII. PROJECT PLAN
VIII. SCHEDULE IX. COST ESTIMATE A. SUMMARY B. BASIS FOR ESTIMATE C. CASH FLOW
1 1 2 3 4
4 5 5 6
UCC 020038
-1-
I. INTRODUCTION
Much of the Insulation In the Slstersvllle Plant Is asbestos and Is In poor condition. The exposed asbestos presents a safety and health hazard associated with airborne particulate asbestos.
II. SUMMARY
The asbestos Insulation throughout the Slstersvllle Plant roust be
upgraded to comply with the Occupational Safety and Health
Administration (OSHA) standards. This project will upgrade
approximately 60% of the asbestos Insulation In the Slstersvllle
Plant. The plan Is to remove asbestos from Idle equipment, replace
asbestos Insulation, where necessary, with an approved type, and cover
asbestos Insulation with an approved covering. This cost of the
proposed project Is:
Capital ( 15%)
$1,500,000
Non Capital
600,000
The Justification of this project Is Occupational Health. The present
OSHA Asbestos Standard, 1910.1001, revised July 1, 1986 specifies 0.2
flbers/cc as the maximum allowable exposure over an eight-hour period.
The figure refers to fibers greater than five micrometers in length and
would amount to 1.6 million fibers In that time period.
UCC 020039
-2III. SPONSOR'S OBJECTIVE
The basic objective of this project Is to upgrade or eliminate 60% of the asbestos Insulation In the Slstersvllle Plant to comply with OSHA Standards. Completion
This Insulation Upgrade Project will be complete by June 1989. Project will be executed on a continuous basis over the three-year period with curtailment during the bitter cold winter months. Safety/Health All Division Safety/Health Guidelines will be followed during asbestos removal, repair, and covering. Government Regulations Areas of the plant covered in this project will be In compliance with all applicable OSHA and U.S. Environmental Protection Agency (EPA) Regulations at project completion.
UCC 020040
-3-
IV. FACILITIES This Phase I project will replace asbestos Insulation and Jacketing In many areas of the Plant In accordance with the following area priority list: 1. Intermediates Area 2. Environmental Protection Area 3. Small Scale Production Area 4. Polymers II 5. 50% Silanes Reactor Tower (Detailed listings of the equipment and pipelines In each of the sub-sections of the above areas are available In the project file).
Another project will be submitted In 1989 to upgrade asbestos Insulation In the rest of the plant as follows. 1. 50% Silanes Reactor Tower 2. Polymers I 3. Miscellaneous areas; Including Maintenance, Laboratory, Warehouse,
etc. 4. Energy Systems area
This order of priority was established by the plant to correct the most critical needs first. The division Into two projects Is desirable to control the cash flow and for effective project execution.
This project will provide removal of asbestos from idle equipment, replacement where necessary, and recovering with an approved covering of an estimated 60 per cent of the asbestos insulation currently Installed In the Slstersvllle Plant. The remaining asbestos Insulation will be addressed by another project of approximately two thirds the cost of this one, to be executed In 1989, 1990, and 1991.
In the execution of this project non-asbestos type Insulation will also be repaired or replaced to provide for an economical and complete project. Non-asbestos Insulation work will constitute 15 per cent, or less, of the total project cost.
UCC 020041
-4V. ENVIRONMENTAL PROTECTION/OCCUPATIONAL HEALTH AND SAFETY CONSIDERATIONS
This project will correct an Occupational Health concern by replacing or sealing exposed asbestos Insulation In the Plant. When the Insulation Is being replaced or removed. Safety and Health Guidelines will be followed which Includes: Installing rope barricades and clearing the area of plant personnel, posting of warning signs, proper bagging and disposal of Insulation, and monitoring of surrounding work areas. In addition, assuring that contractor personnel adhere to guidelines such as: wet clean-up, wearing of appropriate respirators, wearing and disposal of proper protective clothing, etc. This project will be In compliance with all applicable OSHA and EPA Regulations. EPA reporting regulations will be followed. VI. SUPPORTING FACILITIES A. Distribution
The project will have no effect on Distribution facilities. B. Energy Systems
The project will have no effect on Energy Systems requirements. However, Energy Conservation will be Improved with this Insulation upgrade. C. Safety and Environmental Considerations See Section V above.
UCC 020042
VII. PROJECT PLAN
-5-
The project survey, or scope, was prepared by the Maintenance Department over the last year. The priority of work Is shown In the Facilities Section on page 3.
Insulation specification consultation will be supplied by Engineering. Field construction will be done by the Plant Maintenance Department, an outside contractor, or the Central Engineering Construction Group, and will be supervised by the Maintenance Department. The Maintenance Department will establish a dedicated crew to carry out the scope of this project.
Project Management, Including cost control and reporting, will be provided by Plant Engineering.
The project organization follows:
Steering Committee
Assistant Plant Manager Maintenance Superintendent General Project Manager
W. V. Summers G. W. Wulfert R. A. Hazlewood
Project Team
Maintenance Contractor Foreman Maintenance Coordinator/Supervisor Project Manager
J. E. Boley W. C. Nycz C. A. Eddy
VIII. SCHEDULE
Key dates are:
Outline of Project Approval CBP Approval Mechanical Completion
August 1986 October 1986 June 1989
UCC 020043
-6-
COST ESTIMATE
A. Summary
Construction Labor Materials Engineering* Contingency
Capital
$1,109,000 241,000 50,000 100,000
Total
$1,500,000
Removals Expense
$554,000 21,000 12,000 13,000
$600,000
* Insulation specification consultation. project management and field coordinator of contractor.
B. Basis for Estimate
The estimate for the work Is based on a detailed scope provided by an Insulation survey of each unit. The total man-hour estimate Is 43,800 hours of work for both capital and expense.
C. Cash Flow
1986 1987 1988 1989
CAPITAL
$150,000 500,000 500,000 350,000
EXPENSE
$ 60,000 200,000 200,000 140,000
UCC 020044
SCO DIVISION WORKING BUDGET CAPITAL PROJECT ASSIGNMENT
SISTERSVILLE PLANT
DISTRIBUTION:
To: PLE OR PROCESS ENGINEERING MANAGER
DEPARTMENT HEAD
R. A. Hazlewood G. W. Wulfert .
LEAD PROCESS ENGINEER L., G.Moody
DESIGN SUPERVISOR
M. E. Kim
MAINTENANCE TECHNOLOGY W. C. Nvcz/G. Wulfert
CAPITAL WORKORDER BOOK C. K. Nicholson
PROJECT TEAM
(See Below)
DESIGN TEAM
(See Below)
RECORDS CENTER
DFE/BJS
TITLE:
Asbestos Insulation Replacement
PROJECT SPONSOR:
R. A.Hazlewood____________
DEPARTMENT SYSTEM:
327000
PROFIT CENTER/S 917~___________________________________________________________________
$243,000
WORK ORDER SUBMISSION TO DANBURY ____ 11/26
ENGINEERING JOB NO:
EJ-
EON FOR PREPARATION OF SCOPE 26205
EON FOR PREPARATION OF WORK ORDER 26205
EST. ENG. COMPLETION DATE 11/26 (Signed Scope Document Issued) (C4 - 14 - 19)
PROJECT TEAM
PROJECT CONTROL ENGINEER
W. M. Crandall
ENGINEERING REPRESENTATIVE
--=---
OPERATING REPRESENTATIVE
-----------
MAINTENANCE REPRESENTATIVE DISTRIBUTION REPRESENTATIVE
vi* C -
__ ____
R/D REPRESENTATIVE CONSTRUCTION REPRESENTATIVE r? U/ Ip
COST ESTIMATOR
C- A. Eddy
9/86
UCC 020045
DESIGN TEAM
PROCESS
------
PROCESS SAFETY REVIEWER
--
SAFETY & FIRE PROTECTION ~
CIVIL/MECHANICAL
ELECTRICAL
--
CONTROL SYSTEMS
-------
Issued By: *(anager of Plkoi1 Eng.
Date:
w*
TO: J. F. Dodd (2) ..W, ,y. Summers , G. W. Wulfert
CC: W. D. Bradbury, Jr. R. P. Leichliter W. C. Nycz
SUBJECT:
Sistersville Plant Insulation Upgrade
Attached is the Draft Outline of Project for the subject project for your review and comments.
Highlights are:
Project Cost $1,500,000 Capital, $600,000 Expense over next three years.
Advance funding is not available, so expenditure in 1986 is estimated at $150,000.
Estimate is based on detailed takeoff of Maintenance Department survey.
Maintenance to supervise field construction.
Project will meet all OSHA and EPA Standards.
Please return comments to me, or I will schedule significant comments to resolve.
LGM/kcs 0723k
tw*. 0-1 in/oJi-kA t S'o.ooa
J A s o fj
6. pr^Aw U (>< j'>i4 2
UCC 020046
4 rho*hij (4. l')
tOr&jQ- -
STflTU S
/'/
X HILTON
(\JjUjdL_ 6
hrll^S d\r~t~\
Ck
01^ yOUxJ
aJo/7 .
DANBURY HILTON INN
AND CONFERENCE CENTER UCC 020047
J, 'nn
tul /y
cc
Brtf fJ.
0,1 I 5.
l: ;
Pjsvi{r
^j My7^J r 2- C C--
3. 8f l<?85 jfyo r\
A/e^ei / kJO
/ojccv^ coj4 ct if;'/-2> tf? b ^ j-
Xo
V C/VI OC/C2<v Jk
2// Po
/new*-. ^ la n yca-Z^4/<- 2/'/c/,4.r r <- - / stsx*- /zPe-- P-lZ-P cjl)/<^H U**-P
r- Vvt Ol/<L- d
Ct f /?CC*4eJj
/2./J Aj- ^ e^U-ijpsyi c--<4^ yL?y?C -
lines f/\St~l z4bn.
ixu id iy.
/4 4 , O' tlf 2. [ | 0d<-r -Zjlt-lPos (v-c-/<.*()
-?. ^ co r/c cJ^ 2. I |
pl z-rt
#o /"i n<-ds.
7'^/j
4tu^^l b_ l'41Cv/V,1 */ ? pluj- 2 If Jc^cr-i/
y-epfac,,t~vy\Cs^L. '2-^^.
j/vip -out_m c/i
non - 2/4/4/ //i-n^/>^> 'd*n-
IL/*r 2- / *
_?. k
/Ji<_
chicly L'htS l
o
<kk C/lCr ^/ Pja P pLy\ JP* I'll*. p{/cLnh fils
lf---S^& ^Zo/Ic-T
fS re-sdi^ d-4t-c[ 2rc-2-n!).
4, JTiL fc,L ,, |/lUoit/<-
c
7
/o
Coov' cj,'^ -a/^ov~ JtA/t/t-Lj
J>>i ry\t^
^Mee<i
^onos.
S Co^p a
4 />TC -
4 /JoJC**b**s- h
co>'^b tovi'44*\ ftnpajz (
UCC 020048