Document 71BZaJBJ6ry1oE4BvoDxzzp5E
ZONOLXTE
cownuicnoM imiumii mmw
TO: A. V.
FROM: T. P. Felt
ee: W. V. Culvr/Zono-Auburn
\T. F. Egan/Zono-Wllaaete - J. C. Octineer C. s. Orensceln C. H. Wendel/Zono-LA Office B. R. Williams J. L. Wright
SUBJECT: Painted Steel (Tumc)
Otar Al:
Z did have occasion eo calk co Bill Culver, and I mentioned to hla
your March 21 note. The article appearing in the September. 1971, issue of CIVIL ENGINEEMNG-ASC2 is a poorly written one, and the
final reference to John Occlnger making a statement about shop coated steel perhaps needs some clarification. Before getting into the details, however, let me emphasise that it is neither John Ottlnger'a nor Zonolife's position chat steel should be shop coated before application of Mono-Kota.
It is my belief that we would have an extremely difficult tine bonding Mono-Kota to every conceivable type of painted steel. I know, for example, chat our bond to painted steel deck is not as good as the bond to galvanised steel deck. Paint is not paint, there being all
types and formulations which could Improve or impair the bond of Mono-Kota to the steel. Without an extensive research effort on our
part to check oue each conceivable recommended type of paint coating, Z believe chat we are better off not getting too deeply into this controversy.
On the ocher hand, we all are familiar with steel that sits around
and becomes pitted and extremely rusted before the time for the fire
proofing spraying. Our own recommended specifications are somewhat
vague about hew the steel needs to be prepared prior to the application
of Mono-Kote. If
"eaum*. chat badly pitted and rusted steel
would be prepared properly before the application of Hono-Kote, then
that is certainly acceptable. One of my concerns, however, especially
in those areas where building or architectural inspection is not
PLAINTIFF'S ; EXHIBIT
WRG-1770
A. V. Daabroe
2 March 29,1972
existent, is that eh* *e*l will not b* cleaned and Mono-Rot* will be applied to a surface to which it say not perfota in a fire condition^ as we would hope or expece it to. to Shop eoatedycteOtjMC^ksoiiJSPVem^ondwiT^ecbeiapairad and.when we know, that ltlis" likely that steel will becoae pitted and rusted, and that the accessary preparation of the steel will aot beperformed.' la ay October 22* 1971* sailing, X included a paaphlet entitled* "A Structural Engineer Looks At Fire Protection" la which the author suggests "the cose of $8-910 per ton (of steel) is a snail price to pay" for the shop painting of steel to avoid the difficulties and shortcoalngs of fireproofing application to badly pitted and rusted and unprepared steel. Xc is hard for as to isaglne that this cose would change a design froe steel to concrete.
You will note in the above thae X have taken both sides of this arguaene. On the one hand* X can see where we do not want to take a company position of reconaending shop coated steel* while on the other hand, le nay be (at least in sons instances) the besc and only position thae we can and oughe to take* X nuse confess thae X have done nothing in this regard. Xf the changeover is froa otherwise steel designed buildings to concrete, certainly the steel eoapanles and associations will have nor* iapact in fighting the shop coating of steel than will Zonollte. That is noc to say thae X am unwilling to fight the battle, X am only saying that X an aot certain if we are sufficiently prepared to enter into it.
I asked Bill Culver to provide as with whatever he can to docuaene what Tneaec has been saying that specifically refers to Mono-Kote or our position. X do intend, however, to write to Tneaec clarifying our position.
X trust that eh* above ae lease clarifies the reference eo Oetlnger'e statement as it appeared in the CIVIL ENCXNEERXNC-ASCZ, Sepceablr, 1971, issue.
Best regards. X*d appreciate any consents that you alght have, Al, or for chat aattar any cements thae anyone els* aigbt have receiving this.
TFT/JaJ
Thomas F. Felt
25151781