Document 7139Gno4xkwpQwmgxr2nzGX08

heat was deoxidized .with silicon only, 9. No matter how the material was while the fine-grained heal was deoxi deoxidized, or initially or post treated, dised with 1% lb of aluminum per ton. extensive studies /ailed to show grs- of steel in addition to a prior silicon phitiution when the metal was exposed addition. up to 15,000 hr at 1025 F or 12,000 hr The two steels have been extensively at 1100 P. studied in almost all respects that are 10. Creep strength of this grade of of interest in the contemplated use of steel is comparable to some of the low the material, and the results are as chromium, low molybdenum steels. follows: 11. In the as-rolled and stress-relieved 1. The mechanical properties of this condition. Heat X11641, to which was material at ordinary temperature are added 1,25 !b of aluminum per ton of slightly higher than plain molybdenum stee), had the higher creep strength, steel. while in the normalized and stress- 2. Satisfactory flattening and etch relieved condition, Heal X11648, to tests of the pipe may be expected. which no aluminum was added, had the ' 3. Welding electrodes have been de higher creep strength. Presented at an veloped thst will satisfactorily deposit nua/ meeting, ASME; not available. 0.5% molybdenum containing either of two levels of chromium content--0.35 and 0.5%--with properties similar to the base metal. SYSTEM CAPACITY4. Satisfactory procedures are avail able for welding this material under commercial conditions. These Invotve Generating Reserve Capacity Deter preheating at 500 F as well as post heel mined by the Probability Method, by ing st 1300 F. Cuiseppe Calabrese, Consolidated Edi- 5. Bending and upsetting testa indi son Co of N. Y. A fundamental problem cate this material may.be fabricated as in system planning is correct determina readily as other pipe material tion of reserve capacity. Too low a 6. The results of residual stress value means excessive interruption; too measurement are presented. high a value gives excessive costs. The 7. The material possesses adequate problem is'too complex for any rule-of- scaling resistance for the contempfated thumb solutions. service range of temperature. This complexity, on one side, and 8. Hardness and notch-impact tests good engineering and sound economics, before and after exposure at elevated on the other, justify analysis methods temperature indicate that no deleterious permitting a systematic evaluation of embrittlement may be expected during all the important /actors involved. Un the time that this material Is used. fortunately no exact method similar to the Ohm's law for circuit problems exists for calculating reserve capacity. The probability theory can be applied lor a systematic attack of the reserve HOW TO OBTAIN COMPLETE TEXT Material appearing in this . month's brief eotnei from one of these sources; American Society of Meehenicet Engineers, annual meeting, Atlantic City, N. J,, Doe 1-5, 1947. Papers are identified by initials ASMS and paper No. Available while supply lasts at American Society of problem. Some ten years ago the author's company undertook a study to ration alize Its reserve capacity program. From this study evolved a method of "Judi cious" application of the probability theorem. This paper describes the ap plication of this mathematical theorem. AfEE Paper No. 47-248. Outage Expectancy as a Oasis foe Gen erator Reserve, by Howard P Sttlye, Mechanics) Engineers. 39 W 39tb St, New York 18, N. Y. American Institute of Electrical Engineers, midwest meeting, Chi cago, HI. Nor 3-7, 1947. Papers arts identified by initials AIEE and paper No. Available while supply lasts at American Institute of Electrical. Engineers, 33 W 39th St, New York 18. N. Y. Detroit Edison Co. Three definite con ceptions of the purpose of reserve gen erating capacity apply. They provide for (1) increase in load--particularly unexpected increases (2) outage of equipment for scheduled overhaul (3) forced outage of equipment. The first of these should be included as s margin in loed forecasts. The second is met to some extent by seasons! load variations, which perm^ maintenance because of the tween load and general],, Tho third .follow. While failure is unconliolUb) ft Irora thi, causa ca,, be follow, in general, ororage, past experience. Since planning for auclt oU|,^iTM rie, a haa-y element of chltJ?^4 author fnvora the uae of mathematics as a consistent, priSp^ measure of "sizing up" tbe cwf-Sl But he strives for a method m35L mulas for generator outages iWpSI (1) ciaemially oecurate (J) use even by one not familiar witkiK ability mathematics (3) tangible^ cepliona, easy to grasp, of outsgmft In terms of decimals, A/EE PmifS 47-253. '*' Calculating Probability of Ccn3| Capacity Outages, by IP f Lymam quesne Light Co. A practical nmS&f for evaluating outage postiblliUeiT^ valuable for (1) determining prsgfl reserve capacity (2) analyzing ec*fl liveness of interconnections (3) atadji Ing effect of additional general capacity on reserve requirements. V& Complex and time-consuming eilcili lions make the use of probability sulk tnaiies a limited one. Binomial theorcoj works well with generating cap units of equal size. But very few iqj terns have generators all the same. This paper describes the iolloy approximate methods for (1) s ditffi cut applicable to any number of gesf erating units of different sites (Til equivalent failure rates for differed turbine and boiler layouts (3) a cd9 bination for different systems of lW3 more outage probability curves (ff_ effect on system-outage probibLLitrl curve of adding e generating unit approximation with different eqajw| ment-fsiluro rates. AIEE Paper JYuj 47-252. Probability Methods Applied to CoS crating Capacity Problems of a CpM btned Hydro and Steam System, by Lodne, C IP SPotchorn, Ptnntyl'&Qn IPeter and Power Co. The employed in applying probability specific installation are described- are held to be good for ell-steam, > hydro or combined hydro and te^| As such these methods are valuabl^j All pertinent factors are revi*^first, followed by a short descripttoigl the company's system. Then tho factors affecting the study sre revfe*&fl AIEE Paper No. 47-254. \i no Ins) POWER * Merck 1 [T PROOF THAT li ARMSTRONG traps I PM DIVIDENDS: ximm'Al*yy-i "i'.v.v-tv '\k iiiMi 'filKsicw feit' acife.iiiit' town. Merck 1948 fF STEAM (raps nrc nol installed correctly they may fail to do their job --and you lose money. For fuel savings nnd maximum production, check your trap installations against the following; 1. DO YOU HAVE A TRAP ON EACH UNIT? When you' drain more than one unit with a single trap, sluggish heating and low temperatures nearly always result. 2. ARE YOUR TRAPS LOCATED CORRECTLY? They should be placed close to nnd below the unit to provide better drainage and eliminate steam binding. i 3. DO YOU NEED STRAINERS? If there is sufficient dirt or scale in your lines to interfere with trap operation, Armstrong Y-type strainers should be installed ahead of the traps. : 4. DO YOU HAVE A BYPASS ON CRITICAL UNITS? Traps should be installed with a bypass. The ARMSTRONG STEAM TRAP BOOK shows the correct methods of installing traps and bypasses. Send for a free copy. ARMSTRONG MACHINE WORKS 812 Mople Street Three Riven, MliMqoo No. 4 of a series of advertisements devoted to improving effitientf through hotter trapping. III