Document 7118BzB94vL0x3L17adqRVQVE

I LOUISIANA DIVISION Asbestos Handling Requirements February 1993 DO A 031441 00NFTDFNTTA1 SECTION I n. in. IV. V. VI. vn. A. B. C. D. E. F. G. H. I. TABLE OF CONTENTS TITLE Purpose Health Effects Training Program Requirements Asbestos Awareness Building Survey Asbestos Maintenance Requirements Asbestos Operations Requirements Cell Service, Chlor-Alkali-H, Chlorine Plant Requirements Preventing Emissions From Cell Service, Chlor-Alkali-H, Chlorine Plants Reporting Requirements For Demolition And Renovation Projects Preventing Asbestos Emissions Gasket/Packing Handling, Storage And Removal Small-Scale, Short-Duration Projects Large-Scale, Long-Duration Projects Equipment Removed For Repair, Storage Or Scrap Motorized Equipment Clutch And Brake Repair PAGE (S) 4 5 6 7-11 12 12 13-23 13 14 15-16 17 18-19 20-22 22 23 24 00 A 03144? CONFTDF^TTAL 36 SECTION VIII. APPENDIX A APPENDIX B APPENDIX C APPENDIX D APPENDIX E APPENDIX F APPENDIX G APPENDIX H APPENDIX I TABLE OF CONTENTS -CONTINUED- TITLE Packaging, Handling And Disposal Of AsbestosContaining Waste Material Definitions Visible Emission Monitoring Procedure Visible Emission Monitoring Record Air Cleaning Device Inspection Checklist Demolition And Renovation Operations Notification Form Asbestos Disposal Verification Form Public Health Organizations Bag/Container Warning Label Vehicle Loading/Unloading Warning Sign PAGE 25-26 27-31 32 33-34 35 36-38 39-41 42 43 44 DO A 031443 CONFIDENTIAL SECTION I PURPOSE This document defines safe handling procedures for asbestos materials used in Louisiana Division. The intent is to control personnel exposure to asbestos through training, maintenance programs, safe work procedures, proper use of protective equipment, and substitution of non-asbestos containing materials. Asbestos has been widely used as insulation, structural wall board, roofing material, certain types of plastic equipment, etc. Asbestos fibers are currently in use as a mechanical reinforcing matrix in insulation, roofing paper, certain piping systems, gaskets, brake linings, clutch plates, etc. Dow Engineering Specifications were revised in 1970 to exclude asbestos-containing insulation before the enactment of Federal regulations controlling the use and handling of asbestos. It is Dow's philosophy to eliminate all uses of asbestos where adequate substitutes can be found. The OSHA standards (1910.1001 and 1926.58) which became effective July 21, 1986 define the precautions, procedures and controls required for asbestos handling. These standards also define the allowable exposure levels and the manner of determining exposure levels. The National Emission Standard for Hazardous Air Pollutants (NESHAP) also established specific requirements for removal and disposal of asbestos-containing materials (ACM). In Louisiana, the state has assumed responsibility for administering the Federal Regulation (NESHAP) through the auspices of a set of requirements entitled Louisiana Emission Standard For Hazardous Air Pollutants (LESHAP). Violations of these regulations may result in a citation or fine or both. Dow is committed to meeting or exceeding these government regulations, and to protecting the health and well being of personnel. D A 03] conftdfnt 36 SECTION II POTENTIAL HEALTH EFFECTS HEALTH & ENVIRONMENTAL SCIENCES TJ,M,E, SYSTEM ASBESTOS 9/21/92 Latest Revision: 04/02/92 Synonyms: Amphibole Appearance: fibrous solid in various colors. Exposure Guidelines: OSHA fibers >5 micron: OSHA PEL is 0.2 fibers/cc TWA; 1 fiber cc for 30-minute short-term exposure. ACGIH TLV is 0.5 fibers amosite/cc, 0.2 fibers crocidolite/cc. 2 fibers chrysotile and other forms/cc; A1A. OSHA General Industry Standard 29CFR 1910.1001. OSHA Construction Standard 29CFR 1926.58. Potential Health Effects This section includes possible adverse effects which could occur if this material is not handled in the recommended manner. These effects apply to stated material and may not apply to dilutions or formulations of that material. EYE - Mechanical injury only. SKIN - Mechanical injury only. - Skin absorption is unlikely due to physical properties. Asbestos fibers may penetrate skin and form wart-like lesions or "corns". INGESTION -SINGLE dose oral LD50 has not been determined. -Small amounts swallowed incidental to normal handling operations are not likely to cause injury; swallowing amounts larger than that may cause injury. ACUTE INHALATION EFFECTS - Excessive exposure to dust causes chronic inflammations of lung tissue and pleural membranes, as well as cancers, in both man and animals. SUBCHRONIC EFFECTS - Prolonged exposure to asbestos dust has been found to cause pulmonary fibrosis (asbestosis), which may be disabling and even fatal. CHRONIC EFFECTS/CARCINOGENICITY - Has been shown to cause cancer in humans. For hazard communication purposes under OSHA Standard CFR Part 1910.1200, this chemical is listed as a carcinogen by NTP and IARC. TERATOGENIC EFFECTS - Birth defects are unlikely. Exposures having no adverse effects on the mother should have no effect on the fetus. A 031445 CONFIDFNTTAt. 36 REPRODUCTIVE EFFECTS - In animal studies, has been shown not to interfere with reproduction. MUTAGENICITY -Some forms of asbestos have been reported to induce chromosomal changes in tissue cultureand/or fruit flies. 00 A 031446 CONFIDENTIAL 36 SECTION III ASBESTOS TRAINING PROGRAM REQUIREMENTS Employees who handle asbestos must be trained before initial assignment and annually thereafter. The asbestos standards and regulations, and other training materials are available to employees upon request, from Industrial Hygiene. Information must be presented in a manner the employee can understand. The following items must be included in the training program: 1. The health effects associated with asbestos. 2. The relationship between smoking and exposure to asbestos in producing lung cancer. 3. Methods of recognizing asbestos. 4. The quantity, location, manner of use, release, and storage of asbestos and the specific nature of operations which could result in exposure to asbestos. 5. The engineering controls and work practices associated with the employee's job assignment. 6. The specific procedures implemented to protect employees from exposure to asbestos, such as appropriate work practices, emergency and clean-up procedures, and personal protective equipment to be used. 7. The purpose, proper use, and limitations of respirators and protective clothing. 8. The purpose and a description of the medical surveillance program required by this standard. 9 A review of the OSHA standard, including appendices. 10. The names, addresses and phone numbers of public health organizations which provide information, materials and/or conduct programs concerning smoking cessation (see Appendix G). 11. The requirements for posting signs and affixing labels, and the meaning of the required legends for such signs and labels. 36 Do A COfVFx0 03.7 447 SECTION IV ASBESTOS AWARENESS SUBJECT: ASBESTOS DO S AND DON'TS This section is provided as general guidance when working with or near ACM. DO 1. Get positive identification. Sample and have bulk I.D. analysis performed at Industrial Hygiene. 2. Take sufficient samples. Some vessels, equipment, etc. may contain more than one type of insulation. Asbestos materials may be covered by refractory, siding, or insulation. 3. Consult the appropriate section of this document if asbestos is present. Materials containing more than 1 % as determined by Polarized Light Microscopy (PLM) are considered ACM. 4. Put all asbestos waste (old insulation, transite, mastic, dust collector solids, disposable clothing, gaskets, packing, shingles, Haveg piping or equipment, furnace refractories, pump packing, pipe gaskets, brake shoes, etc.) in approved containers for disposal. The containers must be properly labeled to warn of the asbestos hazard and sent to the proper Division landfill. 5. Inform all personnel in the general area that asbestos work is in progress. DO NOT 1. Use materials containing asbestos (l.e. insulation, fireproofing, transite siding, Haveg piping or equipment, weatherproofing, and cooling tower materials) where an adequate alternate exists. MAJOR MANAGER APPROVAL IS REQUIRED when using asbestos materials for matching replacement/ repair of existing asbestos covered structures or equipment if a suitable alternate is known. 2. Use asbestos labeled bags for disposal of general trash because of landfill permit requirements. 3. Sandblast or hydroblast materials containing asbestos. When sandblasting or hydroblasting adjacent areas, protect the asbestos materials from overblast. Examples of items to be protected are transite walls, pipe insulation, fireproofing, etc. 4. Use compressed air to remove asbestos materials. For example, do not clean brake drums and clutch housings with compressed air. This procedure may fill the surrounding atmosphere 36 co0^n1TM with asbestos fibers. An acceptable method is to use an approved vacuum. Dispose of the debris in approved containers and send to the LAD landfill. 00 A 03]4 CONFIDENT! 36 ASBESTOS AWARENESS DO NOT (continued) 5. Eat, drink, smoke, chew gum/tobacco products, or apply cosmetics in a regulated or a decontamination area. 6. Dry sweep asbestos materials. 7. Spray asbestos-containing materials. 8. Use hand-operated or power-operated tools (such as but not limited to saws, scorers, abrasive wheels and drills) without local exhaust ventilation if the use of these tools would cause asbestos exposures to personnel in excess of 0.2 fiber/cc. 8 hr. TWA, or 1 fiber/cc short-term excursion limit. 9. Hang plants or pictures on structures covered with asbestos-containing materials. 10. Sand asbestos-containing floor tiles. 11. Damage asbestos-containing materials while moving furniture or other objects. 12. Install curtains, drapes, or dividers in such a way that they damage asbestos-containing materials. 13. Dust floors, ceilings, moldings or other surfaces in asbestos-contaminated environments with a dry brush. 14. Use an ordinary vacuum to clean up asbestos-containing debris. 15. Remove ceiling tiles below asbestos-containing materials without wearing the proper respiratory protection, clearing the area of other people and observing asbestos removal waste disposal procedures. 16. Remove contaminated ventilation system filters without wetting. Do not shake. NOTE; Item 5 through 16 are directly from the OSHA Asbestos Regulations. 1 00 A 031450 CONFIDENTIAL 36 SECTION IV ASBESTOS-CONTAINING MATERIALS GENERIC ASBESTOS DATES SUBDIVISION NAME (%) OF USE BINDER/ SIZING Surfacing material sprayed-or troweled-on Preformed batts, blocks, and thermal pipe covering products 1-95 1935-1970 sodium silicate, Portland cement, organic binders. Textiles Cementitious concrete-like Paper products 85% magnesia 15 1926-1949 magnesium carbonate calcium silicate 6-8 1949-1971 calcium silicate cloth blankets (fire) 100 1910-present none felts: blue stripe red stripe green stripe 90-95 80 90 95 1920-present 1920-present 1920-present 1920-present cotton/wool cotton cotton cotton sheets 50-95 1920-present cotton cord/rope/yam 80-100 1920-present cotton/wool tubing 80-85 1920-present cotton/wool tape/strip 90 1920-present cotton/wool curtains (theater. welding) 60-65 1945-present cotton extrusion panels: 8 1965-1977 Portland cement corrugated 20-45 1930-present Portland cement flat 40-50 1930-present Portland cement flexible 30-50 flexible perforated 30-50 1930-present 1930-present Portland cement Portland cement laminated 35-50 1930-present Portland cement (outer surface) roof tiles 20-30 1930-present Portland cement clapboard and shingles: clapboard 12-15 1944-1945 Portland cement siding shingles 12-14 unknown-present Portland cement roofing shingles pipe 20-30 20-15 unknown-present 1935-present Portland cement Portland cement corrugated: high temperature 90 1935-present sodium silicate moderate temp. indented 35-70 98 1910-present 1935-present starch cotton and organic binder millboard 80-85 1925-present starch. DO A 031451 36 CONFIDENTIAL lime, clay DO A 03145? CONFIDFNTTAi. 36 SECTION IV (Continued) ASBESTOS-CONTAINING MATERIALS GENERIC ASBESTOS DATES SUBDIVISION NAME (%) OF USESIZING BINDER/ Roofing felts smooth surface mineral surface shingles pipeline Asbestos- containing caulking putties 30 compounds adhesive (cold applied) joint compound roofing asphalt mastics asphalt tile cement roof putty plaster/stucco 2-10 spackles sealants fire/water cement, insulation cement, finishing cement, magnesia Asbestos ebony products 10-15 10-15 1 10 1910-present 1910-present 1971-1974 1920-present asphalt asphalt asphalt asphalt 1930-present linseed oil 5-25 1945-present asphalt 1945-1975 asphalt 5 unknown-present asphalt 5-25 1920-present asphalt 13-25 1959-present asphalt 10-25 unknown-present asphalt unknown-present portland cement 3-5 1930-1975 starch, casein, synthetic resins 50-55 20-100 55 15 1935-present 1900-1973 1920-1973 1926-1950 caster oil or poly-isobutylene clay clay magnesium carbonate 50 1930-present Portland cement Flooring tile vinyl and asbestos tile sheet goods asphalt/asbestos tile resilient 21 26-33 30 1950-present 1920-present 1950-present poly (vinyl) chloride asphalt dry oils Wall covering vinyl wallpaper 6-8 unknown-present - Paints and coatings roof coating air tight 4-7 15 1900-present 1940-present asphalt asphalt 36 DO ^ SECTION IV ASBESTOS AWARENESS REQUIREMENTS FLOW DIAGRAM PLANT OR BUILDING OWNER RESPONSIBILITY I I INSPECT ALL AREAS SAMPLE SUSPECT MATERIALS AND BRING TO INDUSTRIAL HYGIENE CONTAINS ASBESTOS (>0.1%) I I DOCUMENT RESULTS AND RETAIN RECORDS NO ASBESTOS (<0.1%) DOCUMENT RESULTS AND RETAIN RECORDS TRAIN PERSONNEL ON ASBESTOS (SECTION IH) NO FURTHER ACTION REQUIRED ANNUALLY INSPECT AND DOCUMENT FOR MATERIAL CONDITION AND VISUAL FIBER RELEASE I MATERIAL IN POOR CONDITION OR VISUAL FIBER RELEASE I I I I I I MATERIAL IN GOOD CONDITION, NO FIBER RELEASE I I DOCUMENT, LABEL AND SET UP MAINTENANCE PROGRAM (SECTION VII) I EVALUATE AND DECIDE 36 Oo A 00Np 03] 4S IoNtiAi FOR REMOVAL AND/OR REPAIR CONTACT MAINTENANCE (8913, 6443) 00 A 031455 C0NFTDFNTTA1. 36 SECTION V BUILDING SURVEY The Industrial Hygiene Department conducts surveys of buildings in this Division to assist in determining and documenting where asbestos is located. We are not required to remove the asbestos; however, the Labeling, Handling, and Maintenance Requirements of the regulations must be followed (See Section VI)- We are allowed to place signs at the entrance to each facility identifying the general presence of asbestos. This, of course, is when used in conjunction with an education and training course which includes written programs for the overall awareness of employees and people who might work in areas where asbestos is located. Signs are available from Division Stock. Regulation requirements for asbestos removal from buildings is extremely extensive and expensive and therefore, will need to be handled on an individual basis utilizing the Industrial Hygiene Department SECTION VI MINIMUM REQUIREMENTS FORMAINTAINING ASBESTOS Although the removal of asbestos-containing material (ACM) is not currently required, all facilities having ACM present must conduct an asbestos maintenance program. The minimum requirements of this program are: 1. An initial inspection of buildings (Responsibility of Industrial Hygiene) and process areas (Responsibility of Facility) to determine the presence or absence of asbestos containing materials. 2. Development of an inventory of all asbestos-containing materials in the facility. The inventory may be a blueprint, diagram or written description which identifies the location and approximate amount of asbestos. Records shall be maintained until the asbestos-containing materials are removed (Responsibility of Facility). 3. Maintenance of all labeling of asbestos-containing materials in the facility (Responsibility of Facility). 4. Prompt clean up of any asbestos contamination. 5. Inspection of all asbestos-containing materials annually to detect deterioration. If deterioration is found, corrective action must be taken and noted on the "Annual Inspection" record (Responsibility of Facility). bo * 6. Written procedures for handling asbestos materials during the performance of maintenance, demolition and renovation activities (Responsibility of Facility). 7. Training of block personnel who may be required to handle asbestos-containing materials as outlined in the Training Section HI of this document (Responsibility of Personnel Supervision). 8. Documentation of compliance with this program (Responsibility of Facility and/or Personnel Supervision). SECTION VII ASBESTOS OPERATIONS REQUIREMENTS INTRODUCTION: The National Emission Standard for Hazardous Air Pollutants (NESHAP) established specific requirements for manufacturing, demolition and renovation, and waste disposal of ACM. The Louisiana Department of Environmental Quality has assumed responsibility for administering the NESHAP Standard Program. A, Requirements For Manufacturers- the following requirements apply to manufacturing operations using commercial asbestos (Cell Service, Chlorine and Chlor-Alkali II Plants). 1. No visible emissions may be discharged to outside air from these operations or from any building or structure in which they are conducted or from any other fugitive sources. 2. Specific methods listed in Section VII. paragraph B must be used to clean emission from these operations containing particulate asbestos material before they escape to, or are vented to, the outside air. 3. Monitor each potential source of asbestos emission from any part of the manufacturing facility, including air cleaning devices, process equipment, and buildings housing material processing and handling equipment, at least once each day during daylight hours for visible emissions to the air during periods of operation (Cell Service Only). See Appendix for the procedure for Visible Emission Monitoring. 4. Inspect each air cleaning device at least once each week for proper operation, potential for malfunctions, the presence of tears, holes, and abrasions in filter bags, and dust deposits on clean side of bags (Cell Service Only). See Appendix D for a copy of the Air Cleaning Device Inspection Checklist. 5. For air cleaning devices that cannot be inspected on a weekly basis, a written maintenance plan must be submitted to the administrator. DO A 0.'\4 36 CONFTDFNT in <r 6. Retain a copy of all monitoring and inspection records for at least 2 years. 7. Submit quarterly a copy of the visible emission inspection records to the administrator, if visible emissions occurred during the report period. See Appendix C for a copy of the Record of Visible Emission Monitoring. Quarterly reports must be post marked by the 30th day following the end of the calendar quarter. 1 fiO A 031458 36 CONFIDENTIAL SECTION VII Prevention Of Asbestos Air Emissions From Manufacturing Operations- the following requirements apply to manufacturing operations using commercial asbestos (Cell Service Only), 1. The following methods must be used to clean emissions from operations containing particulate asbestos material before it escapes to, or is vented to, the outside air: a. Use fabric filter collection devices. b. Operate the fabric filter collection devices at a pressure drop of no more than 4 inches water gauge as measured across the filter fabric. c. Ensure air flow permeability does not exceed 30 ft3 min/ft2 for woven fabrics or 35 ft3/min/ft2 for felted fabrics. d. Ensure that felted fabric weighs at least 14 ounces per square yard and is at least one-sixteenth inch thick. e. Avoid using synthetic fabrics that contain fill yard other than that which is spun. 2. Properly install, use, operate and maintain air cleaning equipment. Bypass devices may be used only during upset or emergency conditions, and then only for so long as it takes to shut down the operation generating the particulate asbestos material. 3. For fabric filter collection devices installed after January 16,1989 provide for easy inspection for faulty bags. 4. If the use of fabric creates a fire or explosion hazard, or the administrative authority determines that a fabric filter is not feasible, the administrator may authorize as a substitute:. a. The use of wet collectors designed to operate at least at 40 inches water gage. b. The use of a HEPA filter that is certified to be at least 99.97 percent efficient for 0.3 micron particles. c. The administrator may authorize the use of other filtering equipment if the owner or operator demonstrates that it is equivalent in filtering particulate asbestos material. 00 A 031459 36 CONFIDFNTTAI. SECTION vn ( C. Reporting Requirements For Demolition And Renovation Operations-the following reporting requirements apply to demolition and renovation projects involving the presence of asbestos-containing material. 1. Inspect the affected facility or part of the facility where the demolition or renovation activity will occur for the presence of asbestos, including Category I nonfriable and Category II nonfriable asbestos-containing materials prior to the start of work. 2. Provide a typed copy of Notification of Demolition and Renovation Form (Appendix E) to the administrative authority 10 working days prior to commencement of demolition and/or renovation work (commencement is considered to be the start of any activity that would break up, dislodge, or similarly disturb asbestos material). 3. Provide telephone notification of emergencies to the Louisiana Division Asbestos Manager (xl817 or 769-4462) who will notify the DEQ Regional Office, or the DEQ Emergency Hotline after working hours and weekends. DEQ Notification MUST occur immediately which is NO later than one hour after learning of the incident that induces emergency demolition or renovation operations. The notification by phone shall include: a. The reason for the emergency b. The steps taken to minimize the hazards to workers and the public 1 c. The estimated quantities of friable and nonfriable ACM to be handled. Within 5 working days after notification by phone, a typed copy of Notification of Demolition and Renovation Form (Appendix E) must be submitted to the DEQ. 4. Provide an update of written notice, as necessary, including when the amount of asbestos affected changes by at least 20 percent. 5. Forward completed copy of notification form to Industrial Hygiene. Industrial Hygiene will finish processing the form, and then convey it to the DEQ. 6. For all demolition or renovation work, except nonscheduled operations (such as routine, non predictable maintenance involving less than one cubic yard) covered by the Division yearly blanket Asbestos Disposal Verification Form (ADVF), or emergency type renovations, the administrative authority must be renotified if either of the following situations a. Start date will be later than that contained in the original notification; re-notification must be made by telephone as soon as possible before the original start date. Written notification of the new start date must be made as soon as possible before, and no later than the original start date, or 00 A 031460 CONFIDFNTTAL 36 b. Start date will be before that contained in the original notification; written renotification must be provided at least 10 working days before the new start date. DO A 031461 GONFTDFNTTAi 36 SECTION VII ( 7. Demolition or renovation operations covered by Paragraph (61 must not begin on a date other than the date contained in the written notice of the new start date. 8. For Demolitions where regulated asbestos-containing material (RACM) is present as Category I nonfriable material in good condition, or if RACM is not present, a typed copy of Notification of Demolition and Renovation Form (Appendix E) must be submitted to the DEQ at least 10 working days prior to beginning work. 9. Receipt and approval of the notification form by the DEQ will result in the issuance of an ADVF. 10. Within 24 hours after the Demolition or Renovation activity has ended and the work area has been cleaned, the LAD Asbestos Manager must be notified so that verbal notification of the completion of the project may be made to the DEQ Regional Office. The abatement activity will be considered complete only after the DEQ has been notified. Work area cleanup involves: a. Removing all loose debris in and adjacent to the immediate work area, and b. Encapsulating all remaining RACM in the immediate work area. 11. Sections of the ADVF must be filled out by the owner/generator (project/job designated individual), the waste material transporter, and the landfill operator who upon completing that section must return the original copy to the DEQ and a copy to the owner/generator. 12. ADVFs must be retained, including the copy of the shipment record signed by Environmental Operations, for at least two years. 13. Demolition or renovation contracts awarded by the Louisiana Division shall contain the requirement for notifying the State DEQ where asbestos-containing material is involved. Oo 00Mp36 SECTION VII Procedure For Preventing Asbestos Emissions- the following procedures must be used to prevent emissions of particulate asbestos material to the air. 1. Regulated asbestos-containing material (RACM) must be removed prior to beginning any demolition or renovation activity that would break up. dislodge, or similarly disturb the material or preclude access to the material for subsequent removal. Regulated asbestoscontaining material (RACM) includes the following: a. Friable asbestos material; and b. Category I nonfriable ACM (asbestos-containing gaskets, packing, resilient floor coverings, asphalt roofing coverings) that has become friable; c. Category I nonfriable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading; and d. Category II nonfriable ACM any material, excluding Category I nonfriable ACM, containing more than 1 percent asbestos that, when dry cannot be crumbled, pulverized, or reduced to powder by hand pressure) 2. Friable asbestos materials to be stripped or removed from any facility must be adequately wetted prior to stripping or removing. 3. Facility components covered or coated with friable asbestos materials may be taken out as units or as sections, provided the friable asbestos materials exposed during cutting or disjointing are adequately wetted. 4. Units or sections must be carefully lowered to the floor and/or ground level, not dropping, throwing, sliding, or otherwise damaging or disturbing the RACM. 5. All friable asbestos materials that have been removed or stripped must be adequately wetted to ensure they remain wet during all remaining stages of demolition or renovation and related handling operations. 6. Local exhaust ventilation and collection systems may be used, instead of wetting, to prevent particulate asbestos emissions when wet removal would result in damage to equipment during renovation operations. 7. Prior written approval must be received before deviating from wet removal methods by use of any of the following emission control methods: a. A local exhaust ventilation and collection system designed and operated to capture the particulate asbestos material. b. A glove-bag system designed and operated to contain the particulate asbestos material produced by the stripping and removal of material. c. Leak-tight wrapping to contain all RACM prior to being dismantled. 36 oo Oo A 03.14,, Tr*NTT^ SECTION VII E. Asbestos Gasket and Packing Material Storage. Handling. And Removal. 1. STORAGE/HANDLING: a. Preformed gaskets, sheet gasket material, and packing must be stored in a designated, clean, labeled area separate from non-asbestos containing material. b. The storage area must be regularly cleaned with a HEPA filtered vacuum (as often as necessary) to prevent the accumulation of asbestos-containing dust and debris. c. ACMs should be stored in low traffic areas and not in an area where personnel are normally located. d. During storage and handling activities, gaskets and packing must be treated with care to minimize the potential for releasing fibers to the air. e. When possible, it is recommended that gaskets, sheet gasket material, and packing be stored in labeled plastic bags or packaged in protective envelopes. 2. GASKET CUTTING: a. The gasket fabrication area must be identified and labeled as an Asbestos Handling Area. b. Sharp edged scissors or knives are the preferred tools for use in fabricating asbestos sheet gaskets. If a powered mechanical cutting device is used, the safety and protective equipment requirements of Small-scale, short duration projects (Section VII- Part F) must be followed, including the use of local exhaust ventilation equipped with a HEPA filter dust collection system. c. Asbestos material, debris, or dust must not be allowed to accumulate on the sheet cutting surface (work area table). d. The work area must be cleaned periodically with a HEPA filter equipped vacuum cleaner (may involve abatement personnel) to prevent the accumulation of dust and loose material. e. Dispose of scrap material or any other items that may be contaminated in a properly labeled asbestos disposal bag. 3. SAFETY/PERSONAL PROTECTIVE EQUIPMENT: a. Work permits and personal protective equipment appropriate for the job and its location must be obtained prior to removing gaskets and/or packing. 36 DO A 031464 CONFIDENTIAL b. Minimum personal safety equipment required for the removal of a gasket or packing material will be the same as the job location requirements as long as the removal is performed so that material does not become friable (i.e. wet removal, removal by hand, or no sanding, cutting, grinding, or abrading). c. Gasket or packing material in poor condition, friable, or which will be subjected to mechanical removal techniques (such as sanding, grinding, abrading, drilling, cutting, chipping) must be handled by certified asbestos abatement personnel. d. Professional, licensed asbestos abatement contractor personnel that work with ACM on a daily basis follow additional and more stringent safety requirements. SECTION VII 4. MONITORING: Periodic personnel monitoring must be conducted during gasket or packing removal work to substantiate that the level of emissions are below the PEL (0.2 fiber/cc) and/or STEL (1 f/cc), and to maintain a current data base for the Division. Consult Industrial Hygiene for monitoring information for the job in question. ( 5. REMOVAL PROCEDURES: a. The removal of nonfriable preformed gaskets and packings can be performed by trained block personnel including maintenance workers, or by an asbestos abatement contractor depending on Plant/Block preference. b. All gaskets and packings must be wetted down before, during, and after removal handling operations to prevent the release of airborne fibers. c. The water used for wetting must contain a surfactant to improve it's ability to penetrate the material. Fantastik, a liquid spray cleaner, is widely accepted as the wetting agent of choice for ACM. Care should be taken not to apply an excessive amount of spray which could cause the material to crumble and/or become mushy. d. A gasket or packing material that requires the use of sanding, grinding, or abrading (including drilling, cutting, or chipping) must be handled by certified asbestos abatement personnel. e. The use of powered mechanical tools that will cause damage to the nonfriable ACM must be equipped to eliminate or minimize the potential for fiber release. A powered buffer equipped with a local exhaust and ventilation collection system is available from the Division Tool Room. OO a 03146S 36 cHnDFNTTA,5 f. Waste gasket and packing material must be disposed of in the plant by placing it in labeled plastic bags. g. Waste material must be properly labeled and packaged for acceptance at the landfill for disposal. See Appendix H for Labeling Specifications, and Section VTTT for the requirements for Handling and Packaging for Disposal. ( i DO A 031466 36 C0NFTDENTTA1 SECTION VII Small-Scale. Short-Duration Projects The following requirements apply to small-scale, short-duration asbestos renovation(repair and maintenance activities) and/or demolition projects: 1. SCOPE- small-scale, short-duration renovation and maintenance activities are tasks such as, but not limited to : a. Removal of asbestos-containing insulation on pipes for repair work, or b. Removal of small quantities of asbestos-containing insulation on beams or above ceiling, or c. Removal and replacement of valves, gaskets, or d. Installation or removal of small sections of asbestos-containing drywall (not gypsum based products) or roofing, or e. Installation of electrical conduits through or proximate to asbestos-containing materials. 2. TRAINING: a. All personnel involved with the removal, handling, and disposal of asbestos must be trained before initial assignment and annually thereafter. b. The required contents of the employee training program are outlined in Section IH of this document. 3. SAFETY/PROTECTIVE EQUIPMENT: a. Work permits and personal protective equipment appropriate for the job and its location must be obtained prior to starting work. b. Respirators equipped with HEPA filters must be worn during removal and cleanup activities. A dust mask or disposable type respirator are not permitted for asbestos work. c. Medical approval must be obtained prior to assigning work that requires wearing of a respirator. d. Employees wearing respirators for asbestos work must have been fit tested within the last six months. e. Disposable protective coveralls must be worn during removal and cleanup operations; acceptable footwear includes rubber boots or coverall boots. 4. MONITORING: a. Personnel monitoring must be performed at the beginning of the job unless worker(s) wear air-supplied, positive-pressure, full-facepiece respirators, or previous monitoring of similar jobs indicate 8 hour TWA exposure potentials are less than the 36 DO A 031467 CONFIDENTIAL action level of 0.1 fibers/cc. Consult Industrial Hygiene prior to starting work for information on monitoring requirements for the job in question. Monitoring results must be reported to affected employees as soon as possible following receipt of the results. Monitoring results must be communicated to the affected employee(s) in writing either individually or by posting at a centrally located place that is accessible to the affected employee(s). DO A 031468 CONFIDENTIAL 36 5. RESTRICTED AREA: SECTION VII a. A restricted area must be established and asbestos warning signs posted to restrict access to authorized personnel only. b. All persons entering a restricted area must be supplied with the proper respirator. c. Movable objects must be removed from the work area to protect them from asbestos contamination. d. Objects that cannot be removed must be covered with 6 mil-thick polyethylene plastic sheeting as well as underneath the work area. e. Scaffold landings must be covered with 6-mil-thick polyethylene. f. Materials must be lowered to ground level not dropped. g. Pre-job planning must include provisions for keeping deteriorated asbestoscontaining material in place after outer jacketing is removed. h. Mini-enclosures or negative pressure enclosures must be used for jobs when ever feasible if the potential exposure level may equal or exceed the 8 hour TWA of 0.2 f/cc (local exhaust ventilation collection systems or other engineering control methods may eliminate the need for enclosures). 6. REMOVAL:- the following procedures must be employed singly, or in combination to achieve compliance with the permissible exposure limit of 0.2 fibers/cc. a. Whenever feasible, wet removal methods must be used during small-scale, shortduration maintenance and renovation operations. b. Wet methods, wetting agents, or removal encapsulates must be used before, during (e.g., cutting, removal) and after removal (e.g., handling and cleanup). c. Asbestos-containing material must be thoroughly wetted, but not excessively so that the material loses it integrity. d. Dry removal may be performed with prior approval from the DEQ only in cases where asbestos removal work must be performed on live electrical equipment, on hot steam lines, or in other areas where water will seriously damage materials or equipment. e. Dry removal must be performed using local exhaust ventilation systems equipped with HEPA Filter dust collection system, and/or enclosure or isolation of work area. f. Hand operated or power operated tools (such as but not limited to saws, scorers, abrasive wheels, and drills) used must be equipped with local exhaust ventilation provided with HEPA filter dust collection systems. g. Any vacuuming work performed must be done with equipment having HEPA filtering systems. 36 00 A 031469 conftdfnttal h. When ACM is removed, it must be promptly placed in labeled containers (plastic bags or wrapping). See Appendix H for labeling specifications, and Section VIII for requirements on packaging asbestos-containing waste material. i. Whenever feasible, the surface from which the asbestos has been removed must be wetted and cleaned. j. Termination points of exposed asbestos must be encapsulated. k. Bags or containers of asbestos-containing waste material must be lowered to the ground, not dropped. SECTION VII 6. REMOVAL (continued): l. Upon completion of the removal work, a thorough inspection and cleanup of the area must be conducted. Polyethylene plastic used as covering material must be disposed of in disposal containers, and contaminated or broken disposal bags must be double bagged. m. The work area must be washed down or vacuumed as required. n. Items removed from the restricted area during removal work must be decontaminated. o. Decontamination requirements include rinsing or vacuuming gloves and boots, and the removal and disposal of suits at the work site in sealed disposal bags or containers. p. All materials used to establish the restricted area must be removed. q. Bags/plastic wrapped asbestos-containing waste materials must be transported by Environmental Operations to the Division disposal site. Large-Scale. Lone-Duration Asbestos Projects Large-scale, long-duration asbestos-containing material removal operations should be handled by a professional, licensed abatement contractor. Projects of this size and scope require extensive equipment, elaborate planning and procedures, decontamination, training requirements, and medical surveillance program. Operations of this magnitude will be evaluated on a project by project basis by Industrial Hygiene, Maintenance and Project Supervision. 36 n0 A 031470 SECTION VII H. Equipment Removed For Repair. Storage Or Scrap The removal of certain pieces of equipment for repair in shops, storage in equipment yards or discarding as scrap may be handled as follows: 1. For large facility components such as insulated reactor vessels, large tanks, and steam generators being sent to repair shops or storage, the regulated asbestos-containing material (RACM) is not required to be stripped if the following requirements are met: a. The equipment is removed as a unit or in sections without disturbing or damaging the RACM. b. The exposed RACM is kept adequately wet during cutting or disjoining. c. Each section or unit is carefully lowered to the floor and/or to ground level, not dropping, throwing, sliding, or otherwise damaging or disturbing the RACM. d. The component is encased in leak-tight plastic wrapping, and the leak-tight wrapping is labeled as per APPENDIX H. e. The component is transported, stored, or repaired and reinstalled without damaging or disturbing the RACM. f. The vehicle(s) used for transporting the component is marked as per APPENDIX I during loading and unloading. 2. For equipment being sent to repair shops or storage equipped with nonfriable gasket and/or packing material, the gasket and/or packing is not required to be removed if the following requirements are met: a. The equipment is removed, transported, repaired, and reinstalled without damaging or disturbing the ACM. b. The presence of asbestos-containing material is conveyed to repair shop supervision. 3. For pipe equipped with nonfriable gaskets, that is being removed for the purpose of scraping, the gaskets are not required to be removed if the following requirements are met: a. The asbestos-containing pipe insulation is removed. b. The line is removed, transported and handled without damaging and disturbing the gaskets. rn? A 314?1 36 co^ro^TrA,; SECTION VII I. Motorized Equipment Clutch And Brake Repair GENERAL: 1. Employees who work with asbestos must receive training in asbestos hazards before initial assignment and annually thereafter. 2. Do NOT use compressed air to remove asbestos materials or dust from brake drums or clutch housing. 3. Place 6-mil polyethylene plastic sheeting underneath the work area. SAFETY REQUIREMENTS: 1. Safety equipment required by the job location must be worn. 2. An approved respirator must be worn during material removal and clean up. Employees must have completed the mandatory fit test within the last six months. 3. Barricade area with yellow tape or rope to limit access. REMOVAL: 1. Two methods can be used to reduce exposure to asbestos fibers. They are the Enclosed Cylinder HEPA Vacuum System Method or the Wetting Method. a. The Enclosed Cylinder HEPA Filter Vacuum System Method consists of three components: A wheel-shaped cylinder designed to cover and enclose the wheel assembly A compressed-air hose and nozzle that fits into a port in the cylinder, and A HEPA-filter vacuum used to evacuate airborne dust generated within the cylinder by the compressed air. b. The Wetting Method consists of spraying water containing a surfactant to loosen the asbestos containing residue and to capture the resulting airborne particles in the water mist. Begin spraying the asbestos-containing parts at a sufficient distance to ensure that the asbestos particles are not dislodged by the velocity of the water spray. When the asbestos particles are thoroughly wetted, the spray may be brought closer to the parts and the parts may be sprayed as necessary to remove grease and other material. The parts must then be wiped and with disposable rags or towels which must be placed in a labeled plastic bag and sealed while they are still wet. Proper protective equipment and disposal is recommended (see Section VII. FV 36 DO A 031472 CONFIDENT IA1 ( 2. Replaced brake shoes or pads, clutch plates, disposal rags or towels and other contaminated materials for disposal must be handled as asbestos-containing waste material (See Section Vm for information on packaging and disposal). 3. When the job is completed, a thorough inspection must be made to ensure all asbestos contaminated materials have been picked up. The work area must be vacuumed with a HEPA vac or washed down. DO A 031473 36 CONFIDENTIAL SECTION VIII PACKAGING. HANDLING AND DISPOSAL OF ASBESTOS-CONTAINING WASTE MATERIAL 1. No visible emissions may be discharged to the outside air during collection, processing, packaging, or transporting of asbestos-containing waste material. The following methods must be used to control emissions: a. Adequately wet the asbestos material using a surfactant containing liquid (Fantastik) or methods described in Section VII. Part D. (Preventing Asbestos Emissions). b. After wetting, seal the material in plastic bags labeled with an approved asbestos label (See Appendix H for label specifications); or for materials that will not fit into bags without additional breaking, wrap materials with leak-tight 6-mil polyethylene plastic sheeting and label. c. Polyethylene bags must be sealed by duct tape or tying; tom bags must be double bagged. 2. Disposable clothing worn during asbestos removal packaging, and disposal must be placed into properly labeled polyethylene bags and disposed of as asbestos-containing waste material. 3. A plastic pack containing a polyethylene bag liner may be used to accumulate small quantities of hayyed and sealed asbestos-containing wastes (Brake shoes, Brake dust, Garlock Gaskets, etc.). The drum must be labeled with an approved warning label, be labeled "For Asbestos-Containing Waste Material Only", and the top must be kept on except during deposit of waste. 4. For asbestos-containing waste material that must be transported off-site from where it is generated (Brine Production, Promix, Areas outside Dow Plaquemine Site) for disposal in the Division Landfill must in addition to the specified OSHA label, label the bags/containers or wrapped materials with the name of the waste generator and the location at which the waste was generated. 5. All asbestos-containing waste material shall be deposited as soon as practical at the approved Division Landfill. 6. Dumpsters used for unbagged asbestos-containing waste material must contain a disposable polyethylene liner obtained from, or approved by, Environmental Operations. 7. Dumpster boxes must not be filled higher than the top of the side walls. DO A 031474 36 confiDFNTTai SECTION VIII 8. Dumpster liners must be lapped over and secured for temporary closure whenever the work is discontinued for an extended period of time (overnight, holiday, weekend). 9. Dumpster liners must be securely closed before transporting the dumpsters; the sides and ends are to be lapped over and then secured. Proper lapping and sealing procedures are provided in instructions available from Environmental Operations. 10. Tie-downs for dumpster liners must not be attached to the dumpster boxes. 11. Dumpster boxes used for asbestos-containing waste material packaging and hauling, and all bags/containers of asbestos waste (including dumpster liners) must be labeled with an OSHA approved label. 12. Warning signs, which are visible to individuals nearby, must be used on vehicles loading and unloading asbestos-containing waste material into dumpsters or vehicles used to transport the material to the Division Landfill. The signs must conform with specifications in Appendix I. 13. For asbestos-containing waste material transported to landfill for disposal (excluding material covered by yearly, blanket ADVF): a. A record of the shipment must be completed by filling out the ADVF. b. A copy of the ADVF, including the copy signed by the Landfill Representative, must be retained for at least 2 years by the waste generator. c. A copy of the ADVF, signed by the landfill representative, must be received by the generator(plant/department) within 35 days of the date the waste was accepted by the transporter. If the generator does not receive the signed copy of the ADVF, they should contact Environmental Operations immediately. d. If a copy of the ADVF, signed by the Landfill Representative, is not received by the generator within 45 days of the date it was shipped to the landfill, a written report must be made to the Air Quality Division of the Department of Environmental Quality. A 031475 tONFTDFNTTAL 36 APPENDIX A DEFINITIONS ACTIVE WASTEDISPOSAL SITE Any disposal site other than an inactive site. ACTION-LEVEL An airborne concentration of asbestos of 0.1 fiber per cubic centimeter (f/cc) of air calculated as an eight (8)-hour time-weighted average. ADEQUATELY WET Sufficiently mix or penetrate with liquid to prevent the release of particulates. If visible emissions are observed coming from asbestos-containing material, then that material has not been adequately wetted. However, the absence of visible emissions is not sufficient evidence of being adequately wet. Once contained, water droplets formed inside the disposal containers will be sufficient evidence of being adequately wetted. ASBESTOS The asbestiform varieties of Serpentinite (Chrysotile), Riebeckite (Crocidolite), CummingtoniteGrunerite, Anthophyllite, and Actinolite-Tremolite are considered asbestos. ASBESTOS-CONTAINING MATERIALiACMl Material composed of asbestos of any type and in an amount greater than 1% by weight, either alone or mixed with other fibrous or non-fibrous materials. ASBESTOS-CONTAINING WASTE MATERIAL (ACWM) This term includes: filters from control devices, friable asbestos waste material, and bags or other similar packing contaminated with commercial asbestos. As applied to demolition and renovation operations, this term includes: RACM waste, materials contaminated with asbestos, and disposable equipment and clothing. ASBESTOS MATERIAL Asbestos or any material containing asbestos. AUTHORIZED PERSONNEL Any person authorized by the employer and required by work duties to be present in regulated areas. CATEGORY INONFRIABLE ACM DO A 031476 CONFIDENTIAL 36 Asbestos-containing packing, gaskets, resilient floor covering, and asphalt roofing products containing more than 1 percent asbestos as determined using polarized light microscopy (PLM). CATEGORY IINONFRIABLE ACM Any material excluding Category I nonfriable ACM, containing more than 1 percent asbestos as determined by PLM that, when dry cannot be crumbled, pulverized, or reduced to powder by hand pressure. CLEAN ROOM An uncontaminated room having facilities for the storage of employees' street clothing and uncontaminated materials and equipment. COMPETENT PERSON One who is capable of identifying existing asbestos, hazards, in the work place and who has the authority to take prompt corrective measures to eliminate them. The duties of the competent person include at least the following: establishing the negative-pressure enclosure, ensuring its integrity, and controlling entry to and exit from the enclosure; supervising any employee exposure monitoring required by the standard; ensuring that all employees working within such an enclosure wear the appropriate personal protective equipment, are trained in the use of appropriate methods of exposure control, and use the hygiene facilities and decontamination procedures specified in the standard; and ensuring that engineering controls in use are in proper operating condition and are functioning properly. CUTTING Penetrating with a sharp-edged instrument including sawing, but not including shearing, slicing, or punching. DECONTAMINATION AREA An enclosed area consisting of an equipment room, shower area, and clean room, which is used for the decontamination of workers, materials, and equipment contaminated with asbestos. The decontamination area may be adjacent and connected to the regulated area or located remotely. Workers must vacuum protective clothing, remove them and put on clean clothing before proceeding to the decontamination area if it is remotely located. DEMOLITION The wrecking or taking out of any load-supporting structural member of a facility together with any related handling, operations, or the intentional burning of any facility . EMERGENCY DEMOLITION / RENOVATION OPERATION 00 A 36 A demolition or renovation operation that was not planned but results from a sudden, unexpected event that, if not immediately attended to, presents a safety or public health hazard, is necessary to protect equipment damage, or is necessary to avoid imposing an unreasonable Financial burden. This term includes operations necessitated by non routine failures of equipment. EMJaQYEFLEXEPSURE Exposure to airborne asbestos that would occur if the employee were not using respiratory protective equipment. EQUPMEKXROOM (CHANGE-ROOM) A contaminated room located within the decontamination area that is supplied with impermeable bags or containers for the disposal of contaminated protective clothing and equipment. EXCURSION LIMIT An airborne concentration of asbestos of 1.0 fiber per cubic centimeter of air (1 fiber/cc averaged over a 30 minute sampling period. FACIUiy Any commercial, public, or industrial structure, installation, or building; any ship; and any active or inactive waste disposal site. EACIUTJLCOMEQNENI Any part of a facility including equipment. EffiER A particulate form of asbestos 3 micrometers or longer, with a length-to-diameter ratio of at least 3 to 1. FRIABLE ASBESTOS MATERIAL Any material containing more than 1 percent as determined using PLM, that, when dry can be crumbled, pulverized, or reduced to powder by hand pressure. If the asbestos is less than 10 percent as determined by a method other than point counting by PLM, the asbestos content must be verified by point counting using PLM. GRINDING Reduce to powder or small fragments and includes mechanical chipping or drilling. HIGH-EFFICIENCY PARTICULATE AIRiHEPA) FILTER 36 DO A 001478 CONFIDENTIAL A filter capable of trapping and retaining at least 99.97 percent of all monodispersed particles of 0.3 micrometers in diameter or larger. INEQ-ORCONPITION The binding of the material is losing its integrity as indicated by peeling, cracking, or crumbling of the material. INACTIVE-WASTE PISPOSAL SITE Any disposal site or portion of it where additional asbestos containing waste material has not been deposited within the past year. LEAK-ncm Solids or liquids cannot escape or spill out of. It also means dust-tight. MANUFACTURING The combining of commercial asbestos with any other materials and the processing of this combination into a product. Chlorine production is considered a part of manufacturing. MINLENCLQSURE An enclosure constructed of 6 mil polyethylene sheeting to restrict access to the area where smallscale, short duration asbestos maintenance or renovation work is to be performed. The enclosure must have a contiguous change room where workers vacuum off protective coveralls and remove them before Leaving the work area. NEGATIVE PRESSURE ENCLOSURE An enclosure for large-scale long duration projects constructed of 6-mil polyethylene sheeting and equipped with a ventilation system (which discharges through a HEPA filter) capable of creating a negative pressure of 0.02 inches of water inside the enclosure. Where feasible, a decontamination area should be continuous to the enclosure and should be the only means of egress. NONFRIABLE ASBESTOS-CQNTAININGJMATERIAL Any material containing more than 1 percent asbestos as determined using PLM, that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure. NONSCHEPULEP OPERATIONS Any individual renovation and/or demolition operation necessitated solely by the need for repair or maintenance of facility components, and involves a total of less than one cubic yard of RACM per 36 DO A 031479 CONFTDFNTT AL operation. An operation cannot be artificially sub-divided into several smaller operations for the purpose of meeting the less than one cubic yard requirement. PERMISSIBLE EXFQSUREXIMIXirELl No employee shall be exposed to an airborne concentration of asbestos in excess of 0.2 fibers per cubic centimeter of air as an eight-hour time-weighted average (8 hr. TWA.) PLAMSEaOEERAJIQNS A demolition and/or renovation operation, or a number of such operations, in which the amount of friable asbestos material that will be removed or stripped within a given period of time can be predicted. Individual nonscheduled operations are included if a number of such operations can be predicted to occur during a given period of time based on operating experience. REGULATED AREA An area established by the employer to demarcate areas where airborne concentrations of asbestos exceed or can reasonably be expected to exceed the permissible exposure limit and/or the 1 fiber/cc short-term excursion limit. The regulated area may take the form of a temporary enclosure, or an area demarcated to restrict area and minimize the number of employees potentially exposed to asbestos. REGULATED ASBESTQS-CONTAINING_MATERIAL_IRACM) Friable asbestos material; Category I nonfriable AC that has become friable; Category I nonfriable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading; Category II nonfriable ACM that has high probability of becoming or has become crumbled, pulverized, or reduced to powder by forces expected to act on the material in the course of demolition or renovation operations. REMOVE To take out RACM or facility components that contain or are covered with RACM from any facility. RENOVATION Altering a facility or one or more facility components in any way, including the stripping or removal of RACM from a facility component, that is to be returned or to remain in place. Operations in which load-supporting structural members are wrecked or taken out are considered demolitions. REEAJR Overhauling, rebuilding, reconstructing, or reconditioning of structures or substances where asbestos is present. 36 RESILIENT FLOOR COVERING Asbestos-containing floor tile, including asphalt and vinyl floor tile, and sheet vinyl floor covering containing more than 1 percent asbestos as determined by polarized light microscopy, SMALL-SGALE, SHQRX-PURATIQN ACUYITIES The tasks such as, but not limited to: the removal of asbestos-containing insulation on pipes to repair; the removal of small quantities of asbestos-containing insulation on beams or above ceilings; the replacement of an asbestos-containing gasket on a valve or a flange; the installation or removal of a small section of DRY WALL material containing asbestos; or the installation of electrical conduits, pipe, or cable through or proximate to asbestos-containing materials. SURFACTANTS Chemicals added to a material (e.g. soaps, herbicides, paints, etc.) to improve its wetting ability. VISIBLE EMISSIONS Any emissions, which are visually detectable without the aid of instruments, coming from RACM or asbestos-containing waste material, or from any asbestos milling, manufacturing, or fabricating operation. WASTE FROM ASBESTOS CONTROL DEVICES Any waste material that is placed or collected in asbestos control equipment. WASTE GENERATOR Any owner or operator of a source whose act or process produces ACM. WASTE SHIPMENT RECORD The shipment document (ADVF) required to be originated and signed by the waste generator or the owner or operator of a demolition or renovation activity, used to track and substantiate the disposition of ACWM. WEUUSMQVAL The application of a wetting agent to asbestos or asbestos containing material prior to and during removal and/or stripping work. WORKING DAY Monday through Friday, including holidays that fall on any of the days Monday through Friday. DO A 031481 36 CONF1 APPENDIX B VISUAL EMISSION MONITORING METHOD This method applies to the visual monitoring of each potential source of asbestos emissions from any manufacturing or fabricating facility, including air cleaning devices, process equipment, and buildings housing material processing and handling equipment, at least once per days during daylight hours for visible emissions to the outside air during periods of operation. 1. The log sheet included in Appendix C must be used to document the daily visual observations. 2. Both outside observation of sources of potential emissions (e.g. from building/structure, tanks/vessels, equipment vents, etc.), and inside observation for emissions directly emitted from the affected facility process. 3. The observer should select a position that provides a clear view of the potential emission points. 4. A position of a least 15 feet from the emission source is recommended. For outdoor locations, select a position where the sun is directly in back of point source if possible. For indoor observations, select a position where illumination is directly in back or over the source of potential source of emissions. 5. The observation must be made for at least 15 seconds per emission source. 6. During the observation period, continuously watch the emission source (condensed water vapor is not considered an emission). 7. The observation of intermittent or cyclic sources of potential emissions should coincide with that period of the process cycle. 8. Occasionally, the view of the potential emission source may be obscured due to atmospheric interferences (e.g., road dust, fog, smoke, etc.). When this situation occurs, the observation should be terminated, and the observer should clearly note this fact on the data form. bo bQtypr 0: 36 APPENDIX C RECORD OF VISIBLE EMISSION MONITORING The following instructions should be followed in filling out the visible Emission Monitoring Record Sheet (see attached copy). 1. Fill in date and time of each inspection. 2. Identify air cleaning device, process equipment, and buildings housing material processing and handling equipment. 3. Record presence (Yes or absence (No) of visible emissions observed, and corrective action taken to eliminate emissions if necessary. The monitoring must be a visual observation of at least 15 seconds per potential source of emissions. 4. Record daily hours of operation for each air cleaning device. 5. Individual performing visible emission monitoring must initial monitoring record. 6. Retain visible emission monitoring record sheet for at least 2 years. DO A 031483 conftdfntiai APPENDIX C RECORD QF VISIBLE EMISSION MONITORING Date of Inspection (imn/dd/yy) Time of Inspection (A.M./P.M.) Air Cleaning Device or Fugitive Source Designation or Number Visible Emissions Observed (yes/no) Corrective Action Taken Daily Operating Hours (A.M./P.M.) Inspector's Initial A 0314 84 CONFIDENTIAL APPENDIX D AIR CLEANING DEVICE INSPECTION CHECKLIST 1. Air cleaning device designation or number _____________ 2. Date of inspection _____________ 3. Time of inspection _____________ 4. Is air cleaning device operating properly (yes/no) ____________ _ 5. Tears, holes, or abrasions in fabric filter (yes/no) _____________ 6. Dust on clean side of fabric filters (yes/no) _____________ 7. Other signs of malfunction or potential malfunctions (yes/no) _____________ 8. Describe other malfunctions or signs of potential malfunctions. 9. Describe corrective action (s) taken. 10. Date and time corrective action taken 11. Inspected by: _________________ (Print/Type Name) Title Signature NOTE: Retain inspection checklist for at least 2 years. Date DO A 031485 CONFIDENTIAL 36 APPENDIX E NOTICE OF INTENTION FOR DEMOLITION OR RENOVATION The following instructions should be followed in filling out the Notice of Demolition or Renovation (see attached copy) for the purpose of obtaining an ADVF. 1. Fill out the specified sections explained in Item #3 below in pencil and forward to Industrial Hygiene for completion and transmittal to the DEQ. 2. Sections numbered IH, IV, V, VI, VII, VIII, IX, X and XI should be completed by the appropriate plant, building, or project associated Dow representative. 3. Section HI: Complete this section by specifying the type of operation. Section IV: Mark if asbestos is present or not. Section V: Complete this section by specifying the plant or building name, and the telephone number of the Dow person closely associated with the job. If the job directly involves a building then information on it's size, number of floors, age, present use, and prior use must be provided. Section VI: Specify whether a sample of the material was taken and I.D. analysis was performed or not. Section VII: Under the column designated RACM, list the amount of asbestoscontaining material being abated on the proper line. Place a check mark behind the unit of measurement in that portion of this section. Section VIII: Specify the dates on which asbestos removal will start and will be completed. Section IX: Specify the dates for the demolition or renovation work of which the asbestos removal is a part. Section X: Write a brief description of the demolition or renovation work to be done. Section XI: List the work practices and engineering controls (e.g. wet method, glove bag (s), plastic wrap, mini enclosure, total enclosure, etc.) that will be used to prevent emissions. 4. Forward the completed form to the Industrial Hygiene Department 18 - 20 days prior to start of any work associated with the demolition and/or renovation (Starting work is considered to be any activity that would break up, dislodge, or similarly disturb asbestos material). no * 03'4*f 36 CONFIDENTIAL FORM AAC-2 REV 7/17/91 NOTIFICATION OF DEMOLITION AND RENOVATION # of ADVFs Requested Parish # Source # I. TYPE OF NOTIFICATION (0=0riginal R=Revised II. FACILITY INFORMATION (Identify owner, removal contractor, and other operator) telephone (504)765-0219 ADVF # C=Cancelled): OWNER NAME: Address: City: State: Zip: Contact: REMOVAL CONTRACTOR: La. Contractor's License #: Tel: DEQ Supervisor #: Address: City: State: Zip: Contact: Tel: OTHER Address: City: State: Zip: Contact: Tel: III. TYPE OF OPERATION (D=Demo 0=0rdered Demo R=Renovation E=Emer. Reno): IV. IS ASBESTOS PRESENT? (Yes/No) V. FACILITY DESCRIPTION (Include building name, number and floor or room number) Bldg. Name: Fire Marshall Project #: Address: City: Zip: State: Parish: Site Location: Tel: Building Size: # of Floors: Age in Years: Present Use: Prior Use: VI. PROCEDURE, INCLUDING ANALYTICAL METHOD IF APPROPRIATE, USED TO DETECT THE PRESENCE OF ASBESTOS MATERIAL: Nonfriable VII. APPROXIMATE AMOUNT OF asbestos ASBESTOS, INCLUDING: material Indicate Unit 1. Regulated ACM to be removed 2. Category I ACM Not Removed 3. Category II ACM Not Removed RACM To Be Removed NOT TO Be Removed Measurement Below UNIT Cat I Catn Pipes Ln Ft: Ln m: Surface Area Sq Ft: Sq m: Vol RACM Off Facility Component Cu Ft: Cu m: DO A 031487 36 CONFIDENTIAL VIII. SCHEDULED DATES ASBESTOS REMOVAL (MM/DD/YY) start: IX. SCHEDULED DATES DEMO/RENOVATION (MM/DD/YY) START: COMPLETE: COMPLETE: REMIT TO: DEQ/AIR QUALITY DIV. P.O.BOX 82135 BATON ROUGE 70884-2135 ___________________NOTIFICATION OF RENOVATION__________________ (continued)__________ X. DESCRIPTION OF PLANNED DEMOLITION OR RENOVATION WORK, AND METHOD(S) TO BE USED: XI. DESCRIPTION OF WORK PRACTICES AND ENGINEERING CONTROLS TO BE USED TO PREVENT EMISSIONS OF ASBESTOS AT THE DEMOLITION AND RENOVATION SITE: Xn. WASTE TRANSPORTER # 1: Name: Address: City: State: Zip: Contact Person: Xn. WASTE TRANSPORTER # 2: Telephone: Name: Address: City: State: Zip: Contact Person: Telephone: Xm. WASTE DISPOSAL SITE: Name: Location: City: State: Z}EL Telephone: XIV.IF DEMOLITION ORDERED BY A GOVERNMENT AGENCY,PLEASE IDENTIFY THE AGENCY: Name: Title: Authority:_________________ Date of order (MM/DD/YY): Date ordered to begin (MM/DD/YY): XV. FOR EMERGENCY RENOVATIONS: Date and hour of emergency (MM/DD/YY):_________ Description of the Sudden, Unexpected Event:~ Explanation of how the event caused unsafe conditions or would cause equipment damage (or an unreasonable financial burden):___________________________________________________ XVI. DESCRIPTION OF PROCEDURES TO BE FOLLOWED IN THE EVENT THAT UNEXPECTED ASBESTOS IS FOUND OR PREVIOUSLY NONFRIABLE ASBESTOS MATERIAL BECOMES CRUMBLED, PULVERIZED, OR REDUCED TO POWDER.___________ _________________________________________________________________________ _ XVII. I CERTIFY THAT AN INDIVIDUAL TRAINED IN THE PROVISIONS OF THIS REGULATION (40 CFR PART 61, SUBPART M) WILL BE ON-SITE DURING THE DEMOLITIONOR RENOVATION AND EVIDENCE THAT THE REQUIRED TRAINING HAS BEEN ACCOMPLISHED BY THIS PERSON WILL BE AVAILABLE FOR INSPECTION DURING NORMAL BUSINESS HOURS. (Required 1 year after promulgation) (Signature of Owner/Operator)________ (date) DO A 001489 36 CONFIDFNTIAl XVII. I CERTIFY THAT THE ABOVE INFORMATION IS CORRECT. (Signature of Owner/Operator)________ (date)__________________ PURSUANT TO R.S. 40:1574 A&B, BE ADVISED THAT NO CONSTRUCTION OR RENOVATION CAN BEGIN UNTIL THE PLANS AND SPECIFICATIONS ARE REVIEWED BY THE OFFICE OF THE STATE FIRE MARSHAL OR IT IS DETERMINED BY THAT OFFICE THAT PLANS ARE NOT REQUIRED TO BE SUBMITTED. APPENDIX F ASBESTOS DISPOSAL VERIFICATION FORM (ADVF) The following instructions should be followed in completing the Asbestos Disposal Verifications Form (see attached copy). 1. Instruction for Generator of asbestos-containing waste material: a. An ADVF number and facility code will be assigned by the DEQ and will be located at the top of form. b. Line 15 - list name of waste transporter (i.e., Dow Environmental Operations). c. Line 16 - a project number will be assigned by DEQ for work for which the ADVF was issued. d. Line 17 - list quantity of individual loads of asbestos-containing waste material transported to landfill. e. Line 18 - list date of shipment for each load listed on line 17. f. Line 19 - list the following disposal site information - Dow Chemical U.S.A., Louisiana Division, Block 80, Solid Waste Landfill. g. Line 20 - list the date of final shipment of asbestos-containing waste material to landfill. h. Line 21 - name of project associated Dow individual. i. Line 22 - signature of individual listed on Line 21. j. Remove green copy of multiple copy ADVF form. k. Present remaining copies of ADVF to waste transporter on final shipment of waste material. 2. Instructions for Transporter of asbestos-containing waste material: a. Insure all asbestos-containing waste material is in leak-tight, undamaged containers. D0 A 031490 CONFIDENTIAL 36 b. Insure Generator has filled out all items that must be completed before acceptance of ADVF. c. Line 23 - list date of acceptance of ADVF. d. Line 24 - list date of delivery to landfill. e. Line 25 - name of individual who delivered asbestos-containing waste material to landfill. f. Signature of individual listed on Line 25. g. Remove pink copy of multiple copy ADVF form. h. Present remaining copies of ADVF to landfill responsible personnel. APPENDIX F (continued) 3. Instruction for Landfill Operator for asbestos-containing waste material. a. Insure all asbestos-containing waste material is in leak-tight, undamaged containers. b. Check expirations date (line 4) of ADVF. Expired ADVFs must not be accepted. c. Line 27 - list total quantity of asbestos-containing waste material received for work covered by the ADVF. d. Line 28 - list date material is buried. Material must be buried as per DEQ approved procedures. e. Line 29 - name of individual receiving last shipment of waste material for the removal work covered by the ADVF. f. Signature of individual listed on line 29. g. Remove gold copy of multiple copy of ADVF form and return it to generator listed on line 21. h. Retain yellow copy of ADVF. i. Mail original completed copy (white) of ADVF to the DEQ (address located on top of form). toft A 031491 36 OONFJDENTTAi State Of Louisiana Department of Environmental Quality Air Quality Division P.O. Box 44096 Baton Rouge, LA 70804-4096 APPENDIX F ADVF # Facility Code:, _____________________ASBESTOS DISPOSAL VERIFICATION FORM DEPARTMENT OF ENVIRONMENTAL QUALITY______________________ 1) OWNER'S NAME & MAILING ADDRESS-ZIP 3)ISSUE DATE 4)EXPIRATION DATE 2) OWNER'S PHONE () 5) CONTRACTOR S NAME & MAILING ADDRESS-ZIP ` 7)PROJECT START DATE 8)PROJECT COMPLETE DATE 6) CONTRACTOR'S PHONE () 9) PROJECT LOCATION & MAILING ADDRESS-ZIP 1 l)PROJECT START DATE 12)PROJECT COMPLETE DATE 101 CONTRACTOR'S PHONE ( 13) PRINTED /TYPED NAME OWNER/OPERATOR 15) WASTE TRANSPORTER 19) DISPOSAL SITE 20) DATE SHIPPED 21) PRINTED/TYPED NAME 1 14) SIGNATURE 16)PROJ# DATE 17)QUAN. 18)COMPLETED 2u-- 1. 3. 4. 22) SIGNATURE _______TRANSPORTER_____________________________________________________________ 23) DATE RECEIVED 24) DATE DELIVERED 25) PRINTED/TYPED NAME 26) SIGNATURE LANDFILL 271 QUANTITY RECEIVED281 DATE BURIED Do A 031493 36 confidential 29) PRINTED/TYPED NAME 31) SPECIAL CONDITIONS OR COMMENTS: 30) SIGNATURE COPIES: WHITE - DEQ; GREEN - OWNER; YELLOW - LANDFILL; PINK - TRANSPORTER; GOLD - OWNER Oo CQhJp 36 APPENDIX G PUBLIC HEALTH ORGANIZATIONS The following organizations provide smoking cessation information and program material: 1. Office of Cancer Communications National Cancer Institute National Institutes of Health Building 31, Room 10A24 Bethesda, Maryland 20892 2. American Cancer Society 3340 Peachtree Road, NE Atlanta, Georgia 30062 (404) 320-3333 3. American Heart Association 7320 Greenville Avenue Dallas, Texas 75231 (214) 750-5300 4. American Lung Association 1740 Broadway New York, NY 10019 (212) 245-8000 5. Office on Smoking and Health U.S. Department of Health and Human Services 5600 Fischers Lane Park Building, Room 110 Rockville, Maryland 20357 OO A 031494 OONFTOFNTIAI 36 APPENDIX H WARNING LABEL FOR BAGS / CONTAINERS In order to communicate the hazards of asbestos-containing waste material in plastic bags and containers, labeling must be done in accordance with the following requirements: 1. OSHA approved warning labels must be affixed to all bags, containers, or wrapped packages of asbestos-containing waste material. 2. Labels and lettering must be of sufficient size and contrast so as to be readily visible and legible. 3. Labels must display the following legend: Labels on bae/container/wrapped packages:. DANGER CONTAINS ASBESTOS FIBERS AVOID BREATHING DUST CANCER AND LUNG DISEASE HAZARD f>o C-Ohlp- 3: 36 NtTal APPENDIX I WARNING SIGN FOR VEHICLE LOADING/UNLOADING In order to communicate the hazards of asbestos-containing waste material during the loading/unloading operation, the transporting vehicle must comply with the following requirements: 1. Vehicles used to transport asbestos-containing waste material must be marked during the loading and unloading of the waste. 2. Vehicle marking must be visible and be displayed in such a manner and location that a person can easily read the legend. 3. The sign must be 20" X 14" with the spacing between any two lines at least equal to the height of the upper of the two lines. 4. The markings must display the following legend: DANGER ASBESTOS DUST HAZARD CANCER AND LUNG DISEASE HAZARD Authorized Personnel Only 00 A 03t496 CONFIDENT I A/,. 36 SecliQD-1 `La. Div. Requirements for Asbestos Demolition / Renovtlon WorkScope A. Introduction ( ____________________________________________________________ . Scope This module outlines the Louisiana Division guidelines, that shall be followed by those plants / departments involved with asbestos-containing material, in order to comply with the associated regulatory requirements. Authority The agency regulations governing the material asasembled in this module are listed in the following table: Agency Authority Environmental Protection Agency (EPA) Occupational Safety and Health Administration (OSHA) Louisiana Department of Environmental Quality, office of Air Quality and Nuclear Energy, Air Quality Division Law Clean Air Act Occupational Safety and Health Act Louisiana Emission Standards for Hazardous Air Pollutants Regulation/Permit 40 CFR 61 Subpart M 29CFR 1926.1101 29 CFR 1910.1001 Title 33, Part HI, Chapter 51, Subchapter M DO A 031497 CONFIDFNTIAI. February, 1995 Restricted for use within Dow Chemical Company M ^ Class II Activities covered by OSHA 1926.1101 involving the removal of ACM Asbestos Work which is not TSI or surfacing material (includes, but not limited to. asbestos containing wallboard. floor tile and sheering, roofing and siding shingles, and construction mastics). ___________ => Class m Activities covered by OSHA 1926.1101 involving repair and maintenance Asbestos Work operations where ACM. TSI and surfacing material is likely to be disturbed flimited to disturbance of small amounts (less than a single standard waste bag)lofACMZPACM, =* Class IV Activities covered by OSHA 1926.1101 involving maintenance and custodial Asbestos Work activities during which ACM and/or PACM are contacted cleaning_up waste and debris (e,g.. dusting, vacuuming, mopping in situations where there ts an indication that surfaces are coaminated with ACM/PACM). Clean Room An uncontaminated room having facilities for the storage of employee street clothing and uncontaminated materials and equipment. Competent Person One who is capable of identifying asbestos hazards in the workplace and selecting the appropriate control strategy for asbestos exposure, who has authority to take prompt corrective measures to eliminate them; for Class I and Class II work must be trained in a training course which meets the criteria of EPA'S Model Accreditation Plan for project designer or supervisor, and for Class HI and IV work is trained in an operations and maintenance (OAM) course developed by EPA or its equivalent. Cutting To penetrate with a sharp-edged instrument, including sawing, but not including shearing, slicing, or punching. = Crical Barrier ^ne or more laycrs f plastic sealed over all openings into a work area or any other similarly placed physical barrier sufficient to prevent airborne asbestos in a work area from migrating to an adjacent area. Decontamination Area Enclosed area adjacent and connected to the regulated area consisting of an equipment room, shower area, and clean room, which is used for decontamination of workers, materials, and equipment that are contaminated with asbestos. Demolition Wrecking or taking out of any load-supporting structural member and any Demolition does not have to involve asbestos for notification purposes. => Disturbance Contact which releases fibers from ACM or PACM. Includes cutting away small amounts of ACM or PACM, no greater than the amount which can be contained in one standard sized waste bag, in order to access a building component (not to exceed 60"x 60"). Employee Exposure Exposure to airborne asbestos that would occur if person were not using respiratory protection. Continued on next page February, 1995 OO A 031A98 CONFIDENTIAL Restricted for use within The Dow Chemical Company 3-2 => Intact => Major Fiber Release ACM that has not crumbled, been pulverized, or otherwise deteriorated so that it is no longer likely to be bound in its matrix. Continued on next page Uncontolled or unintentional disturbance of asbestos material which involves the falling or dislodging of mom than three square or three linear feet of triable material. =* Negative Initial Exposure Assessment An exposure assessment by a "competent person" immediately before or at the initiation of the operation to ascertain expected exposures during that operation. Nonfriable Asbestos Any material containing more than 1 percent asbestos that when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure. Nonscheduled Renovation and/or demolition operation necessitated solely by the need Operation for repair or maintenance of facility components, and involves a total of less than one cubic yard of RACM per operation. => Operations and Maintenance (O&M) Program of work practices to maintain friable asbestos material in good condition, ensure cleanup of asbestos fibers previously released, and prevent further release by minimizing and controlling the disturbance or damage of friable material. Planned Operation Renovation and/or demolition operation, or a number of such operations, in which RACM will be removal or stripped within a given period of time and that can be predicted. Individual nonscheduled operations are included if a number of such operations can be predicted to occur during a given period of time based on operating experience. => Presumed AsbestosContaining Material (PACM) Thermal system insulation and surfacing material found in buildings constructed no later than 1980. Regulated Area An area established by the employer to demarcate areas where Class I, II, and m asbestos work is conducted, and any adjoining area where debris and waste from such asbestos work accumulate; and work area within which airborne concentrations of asbestos exceed, or there is a reasonable possibility they may exceed, die permissible exposure limit Regulated AsbestosContaining Material (RACM) Means (a) friable asbestos material, (b) Category I nonfriable ACM that has become friable, (c) Category I nonfriable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading, or (d) Category II nonfriable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material in the course of demolition or renovation. Removal Operations where ACM and/or PACM is taken out or stripped from structures or substrates, and includes demolition operations. Continued on next page February, 1995 Restricted for use within The Dow Chemical Company 3-4 rJ? A 031499 C0NFTDFNT;rAj9 Visible Emissions Working Days Emissions, which are visually detectable without the aid ot instruments, coming from RACM or asbestos-containing waste material, or from any asbestos manufacturing operation. This does not include condensed uncombined water vapor. Means Monday through Friday and includes holidays that fall on any of the days Monday through Friday. DO A 031500 CONFIDENTIAL February, 1995 Restricted for use within The Dow Chemical Company 3-6 Asbestos4.2 Demolltlon/Renovatlon A. Demolition and Renovation Decision Chart Requirement Use the following decision chart to determine proper action that needs to be taken. IF-- AND__ THENTM. If asbestos material is job is a planned present or involved demolition Notify Abatement Contractor to evaluate job, and provide job dates Complete Notification Form found in Appendix D, and mail to Industrial Hygiene, Budding 3502W, 20 days prior to starting job. If asbestos material is job is a planned present or involved renovation Notify Abatement Contractor to evaluate job, and provide job dates Complete Notification Form found in Appendix D, and send to Industrial Hygiene, Building 3502W, 20 days prior to starting job. If asbestos material is job is a demolition not present or involved * Complete Notification Form found in Appendix D, and send to Industrial Hygiene, Budding 3502W, 20 days prior to starting job. If asbestos material is job is a renovation not present or involved Perform renovation job. No notification necessary. Notification Requirements State notification is required for maintenance work if: job is a demolition (wrecking or taking out of any load supporting structural member) and asbestos is or is not present. job is a planned renovation involving friable asbestos material: or asbestos-containing packings, gaskets, resilient floor coverings, asphalt roofing products that have become, or will become friable. February, 1995 Restricted for use within The Dow Chemical Company 4-7 A 031501 conftDFnttal of ADVE'a NOTIFICATION OF DEMOLITION AND RENOVATION FORM Pwith # tews*# FORM aac-1 rev S/12/9S ADVF * L TYPE OF NOTIFICATION (circle orb > ORIGINAL REVISED CANCELED IL FACILITY INFORMATION Contact: OWNER NAME: Telephone: Mailing Address: City; REMOVAL CONTRACTOR: State: La. Contractor', lirrtna #: Zip: DEQ ID#: Address: City: State: Zip: Contact: Telephone: OTHER OPERATOR: DEQ Project Designer #: Address; City: State: Zip: Contact: Telephone: HI. TYPE OF OPERATION (circle one) Demo Ordered Demo Renovation Emergency Reno IV. IS ASBESTOS PRESENT? (circleon YES NO Inspection Date: Inspector's Name: Inspector's Accreditation #: V. FACILITY DESCRIPTION (Include building name, number, and floor or room number) Building/Component Name; Fire Marshal Project #: Street Address: City: State: Zip: Parish: Site Location: Telephone: Building Size: # ofFlows: Age in Years: Present Use: Prior Use: VI. PROCEDURE INCLUDING ANALYTICAL METHOD IF APPROPRIATE, USED TO DETECT THE PRESENCE OF ASBESTOS MATERIAL: VIL APPROXIMATE AMOUNT OF ASBESTOS, INCLUDING: 1 Regulated ACM to be removed 2. Category I ACM not removed 3 Category II ACM not removed RACM to be Removed Nonfriable Asbestos Material Not to be Removed Cat I Catn Indicate Unit Measurement Below DO A CONFJDfwt j>.j UNIT Pipes LnFt: Surface Area SqFt: Vol RACM ofTFacility Component Cu Ft: Cu Yds: VIII. SCHEDULED DATES ASBESTOS REMOVAL (MM/DIVYY) Start: Complete: IX. SCHEDULED DATES DEMO/RENOVATION (MM/DIVYY) Start: Complete: REMIT TO. DEQ/AIR QUALITY DIV. P.O.BOX 82135 BATON ROUGE 70884-2135 TELEPHONE# (504) 765-0895