Document 70e4DbG5raVKwggmwXpXk31eV
DATE: SUBJECT: FROM: THRU: TO:
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION 5
77 WEST JACKSON BOULEYARD CHICAGO, ILLINOIS 60604
APR O4 2019
CLEAN AIR ACT INSPECTION REPORT Mull Iron, Rittman, Ohio
Gina Harrison, Environmental Scientist AECAB (MN/OH)
Brian Dickens, Section Chief AECAB (MN/OH)
File
BASIC INFORMATION
Facility Name: Mull Iron
Facility Location: 10 Mull Drive, Rittman, Ohio 44270
Date of Inspection: February 4, 2019
Lead Inspector(s): 1. Gina Harrison, Environmental Scientist
Other Attendees 1. Chet Mull III, Vice President/General Manager, Mull Iron 2. Char Dine, Air Emissions Consultant, Dinecomply, Inc.
Contact email address: chet3@mulliron.net
Purpose of Inspection: Determine facility compliance with the facility's pem1it, the Ohio State Implementation Plan and potential area source NESHAP applicability.
Facility Type: Structural Steel Fabricator
Regulations Central to Inspection: Ohio Permit PO 116695, Ohio State Implementation Plan, 40 C.F.R. Part 63, Subpart:XXXX:XX
Arrival Time: 1:35 PM EDT
Page 1 of 3
Departure Time: 3:55 PM EDT
Inspection Type: [:gJ Unannounced Inspection
D Announced Inspection
OPENING CONFERENCE
[:gJ Credentials Presented [:gJ CBI warning to facility provided
The following information was obtained verbally from either Chet Mull III or Char Dine.
Company Ownership: The facility has always been Mull Iron.
Process Description:
Mull Iron is a structural steel fabricator, producing very large structural steel for schools, bridges, and large buildings, including recently the Pro Football Hall of Fame. The facility began operating in 1982 and currently employs 95 people. Mull Iron purchases steel shapes from Nucor and unloads them in the receiving area of the yard attached to the manufacturing building. Mull Iron personnel then bring the steel shapes to the machine shop where they are cut into smaller pieces and welded, then painted according to each project's specifications.
The facility operates IO welding machines uses welding process type GMAW (gas shielded), and welding wire type "outershield 71M." Typically the shifts are 8 hours long, six days per week, around 50 weeks per year, for a total of 2400 hours per year.
The general process flow is:
Steel shapes>> machine shop cutting>> tack welding plates>> additional steel material taken off to be welded (spot-welded or finish-welded)>> paint area
Staff Interview: According to Mr. Mull, the facility retains a consultant (Char Dine) to perform emission calculations and keep records of welding and paint usage. Mr. Mull contacted Ms. Dine and requested that she send Ms. Harrison analysis of potential NESHAP applicability.
TOUR INFORMATION
EPA toured the facility: Yes
Data Collected and Observations: Ms. Harrison observed machining and welding operations and the paint booth area. The paint booth was not operating during the inspection.
Page 2 of3
The facility tracks paint usage monthly. Ms. Harrison requested copies of the facility's annual paint usage, including HAP content, for 2017 and 2018.
Photos and/or Videos: were not taken during the inspection.
Field Measurements: were not taken during this inspection.
RECORDS REVIEW
Records were not reviewed on site during the inspection.
CLOSING CONFERENCE
Ms. Harrison thanked Mr. Mull and Ms. Dine for their time and told them she would send a copy of the inspection report by email when it was completed. We confirmed that nothing we had discussed was Confidential Business Infonnation. Ms. Hamson stated that EPA may issue a Section 114 Information Request or follow up with questions via phone or email.
Requested documents: Requested documents were submitted via email from Char Dine on February 4, 2019.
Mull Iron 02-85-02-0433 Rule Applicability Detennination, Welding Operations -an analysis of potential applicability ofNESHAP Subpart XXXXXX.
Monthly Cleanup Record Keeping, Rolling 12-Month OEPA Calculations.
Compliance Assistance: General compliance assistance was provided by discussing potential applicability of the NESHAP Subpart XXXXXX.
Concerns: Apart from discussing the NESHAP and its potential requirements, no additional concerns were shared with the facility at the time of the inspection.
SIGNATURES
Report Author: Section Chief:
J ]/! f
t, ,.//,-: :/
'/C>ncJ ,, ~-
./'.,,
!""'-
/'...,
'
'
~./~ ) J.iift% )_,>{ u ~'flVf.,
r
--.. -
Date: 4 / L /1 1
Date: "/ ( '1(I"'
Page 3 of3