W. A. KUHN - ST. LOXJXS DECEMBER 15, 1969 ARCCLOR - PLANTS* EFFLUENT K. S. BERGEN P. B. HODGES D. B. HQSMSR We are taking the following actions to meet an arbitrary, self-laposed target of 10 ppb of PCB's In the total effluent froa each Plant. In these atteapts, we face two probldas: the reaoval of undlsaolved PCB's (solubility Is about 500 ppb) and the further reduction and/or dilution to 10 PPb. ANNISTON Currently, all Aroclor sewers discharge through a large HC1 neutralization llaestone pit which also acts as a trap for undlssolved aaterlal. Effluent is visually free of Aroclors. Projects to s\ap and save are being considered as a acre certain long range systea. The Anniston plant is charged with the developaent of a process, suitable for all plants, to reaove dissolved Aroclors to the target level. A test unit Is near completion, but the Immediate effort will be handicapped by the lack of on-site analytical instrumentation necessary to determine these very low levels of contaminations Although a project to acquire this Instrumentation Is being prepared, delivery and set-up cannot be achieved before Nay 1, 1970. In the meantime, we will utilize the analytical service of S. Tucker to the extent that they are available. Bach Anniston sewsr has been tested and the Aroclor losses quantified. Total loaaes are in the range of 25-50#/day. Pish samples collected from Chocooloeoo Creek by Dr'a. Gunning and Suttkers, Tulane University consultants, are In St. Louis awaiting analysis. DSW 014234 STLCOPCB4003201 c -2- KKUMMRICH Spent Aroclor from using departments and tank ear cleaning la no longer being sewered except acci dentally. These materials are being sent to the land fill, tdilch Is a temporarily acceptable practice. Sewer losses from the producing department are estimated to be In the range of 100-150 #/day. A project Is being prepared (about $10,000 capital) to collect about half of this loss. Collection of the remaining undiaeolved losses will oost $40,000 to $70,000. Although samples of department sewers, total plant effluent, and the Mississippi river are being taken on a regular basis, little analysis has been achieved. Current pirns are to assess our position and take appropriate action after completion of the above mentioned project. MSWPOKT Ve are Just starting to assess the problems at Xewport. Ve will continue to supply all domestic Information developed on how to control Aroclor effluent with no more than a 2-3 week lag. OactRAL C2D Is charged with the problem of learning bow to destroy recovered Aroclor (from both producing plants and customers) which ssnmot be recycled. The recycle of recovered Aroclor will be studied on a ease basis as source and contamination Information becomes available. The possibility of producing only biodegradable Aroclors la being studied Jointly by Research and v, a. ran DSW 014235 STLCOPCB4003202