Document 6xjvoRBgJYML7mL8G2JyXoDE

4 re for all particles, direct comparison is taken were the number of particles 10 n 94 percent of the whole. n um dual counts in million parliclea per cubic foot by plant and department Plant B Plant C Plant D Plant E Num \'um vr of rd.CS -jkeo Million pani cles per cubic foot of air Num ber of sam ples taken Million parti cles per cubic foot of air Num ber of sam ples taken Million ber of parti sam cles per ples cubic per foot of cubic air foot of Million parti cles per cubic foot of air air 9 *6-8 5 5 >4-1 (') 4 >4- H 8 2 -43 6 3-16>5 3 IK- 4K 8 *l - 3$4 6 3*4-10 15 i -7 3 30 -82 3 26 -76 3 3 ioh-iom 2 >4- H 1 Includes broad loom weaving. preparation room is practically all due to he case in the other departments. In the aving rooms asbestos comprises about 25 ised. On special jobs the percentage of ut in general the figure quoted is approximaterial consisting principally of cotton, ents of plant A, asbestos is but 5 percent In the molded brake-lining and clutch os comprises about 25 percent of the total isure to asbestos dust, therefore, is considd in the dust counts in table 1. TIOXS IN THE PLANTS >lants were very similar to those in cotton ration, the process in the preparation room at length: ags. These are emptied upon the floor and ito pug mills and run for about 5 minutes n the fibers. From there the asbestos is wheeled to hoppers with either horizontal to those used in textile mills. After passing natcrial is discharged into trucks. Waste > first run through a garnet machine and i 1 \ 5 January 4,1935 discharged into trucks, which are wheeled to the openers, and the material is fed into these in the same manner as is the new material. After being discharged from the opener, the material is put onto a vibrating or shaking screen, where the long fibers are picked off by a suction hood and blown into a bin to be used again in textiles. The short fibers falling through the screen are either sold as such or used in making an asbestos cement. The cotton is received in bales, opened, and also run through vertical openers. It is discharged into trucks. The filled trucks from the vertical and horizontal openers containing either the asbestos fiber, the cotton, or tho waste material are taken to separate storage bins. As needed, these materials are weighed and . dumped onto the floor in proportion to tho mixture desired, and the resulting mixed materials are then passed through a mixing picker. As this mixture is discharged from tho picker, it is sprayed with a light mineral oil. The material is then taken by a mechanical conveyor to the storago bin in the card room. Two of these mixing pickers discharge onto this conveyor system, while a third machine is equipped with a suction device which conveys the material to a storage bin in tho card room. The object of the two systems is to facilitate the handling of two grades of material at the same time. The third machine is not equipped with an oil spray. The object of the oil spray is pri marily to entrap tho small asbestos fibers and hold them enmeshed in the cotton fiber throughout the processes of carding, spinning, and weaving. Incidentally, it is apparent that it also diminishes tho amount of dust. The material is saturated with about 4 percent of oil at this point; but by tho time it reaches the looms, the oil had diminished to less than 1 percent. While mineral oil was used in the preparation room of plant C, it apparently was not as efficacious as in plant B. In plant E oil was not used, nor was there any attempt at humidification or any system of dust exhausting. Carding machines were fed by hand. In plant A there was a humidifying, ventilating, and heating system, whilo plant B depended on natural humidity. In plant E the carding machines were equipped with a dust-exhaust system, but it was not efficiently used. In plant C carding was done in 2 buildings, 1 of which was equipped with an air-conditioning system, and in both buildings tho machines had exhaust equipment. Two plants, B and C, had artificial humidity installations in their spinning rooms. In the former tho temperature was 76 F., relative humidity 7S percent. One plant, C, had a humidification system in the twisting department and also in the weaving department, where the relative humidity was 76 percent with a dry-bulb temperature of C9 F., as compared with a relative humidity of 44 percent in the weaving room of plant A.