INDUSTRIAL PRODUCTS - INSULATION INSTALLATION OF EXPERIMENTAL CALSILITE AT SOUTH BOUND BROOK PLANT
INTRODUCTION: DISCUSSION:
On November 8, 1970, experimental Calsilite was installed on the exhaust duct of the asphalt stabilizer heater system at the South Bound Brook plant. However, during some routine maintenance on the stabilizer heater, the experimental Calsilite was removed and dis carded before it had been inspected. This duct has since' been insulated again with experimental Calsilite. This report presents the details of this installation.
On February 26, 1971, experimental Calsilite containing bleached
sulfate pulp was installed on the exhaust duct of the asphalt
stabilizer heater system at the South Bound Brook plant. The
material used for this installation was made at the Gloucester
plant on August 11, 1970. The lower 3 Foot section of the duct
was insulated with 6" x 36" x 2" thick block. On the north side
of the duct, regular Calsilite of the same dimensions was installed
as a control. The remaining 3 sides were covered with experimental
Calsilite. The upper 3 foot section of the same duct was covered
with 6" x 36" x 1 1/2" Calsilite. Again, the north side of the
duct has regular Calsilite to be used as a control while the re
maining 3 sides are covered with experimental Calsilite. The
Calsilite blocks are held in place by wires. No attempt was made
to seal any of the joints; nor was any covering placed over the
blocks. No difficulties were encountered with the installation
of this experimental material. Present plans call for the in
sulation to be inspected periodically to determine any adverse
effects due to the exposure on this duct which is reported to
operate at approximately 800*F.