crInteroffice Communication
To J. A. DeBernar From C. E. Gremillion oat July 22, 1975 subject Inspection of Elevated Walking & Working Surfaces - VCM Plant
.*
Attached is the 1975 second quarter status report of the repairs to the priority II & III items. Completed priority items have been dropped from this list. Only the current items are listed herein.
The new structures for the Plant VCM Vent Recovery System and R-305 reactor will have the platform gratings secured by J-bolts as a part of the completion of the project.
This report includes repairs made through June 30, 1975.
C. E. Gremillion
bw CC: JRH
CCR 000016568
ATTACHMENT A PRIORITY II & III ITEMS VCM PLANT - LAKE CHARLES
title
ESTIMATED COMPLETION
Date
C-102 II - Remove foot obstruction behind the ladder at 6th level platform
8-1-75
H-485 Fin Fan III - Replace expanded metal grating or add supports
8-15-75
T-511 Anhydrous Ammonia II - Install handrails on steps to dike
8-30-75
T-101 III - Ladder rung not in alignment with platform.
Being reviewed
H-104 III - South of H-104 railing is substandard (28")
9-01-75
H-106 III - On both ladders top rung is not in alignment with platform
Being reviewed
T-503 II - Steam piping running vertically at top section of ladder obstructing
clearance of rungs.
Completed
Light Ends Column II - Add intermediate platform on ladder-exceeds 20 feet.
Being reviewed
Platform Over S-207A and 207B, S-108 & S-109 II - Remove top ladder rungs II - Install handrails on grating top S-109
Being reviewed Completed
Structure at T-103A, T-110 & T-102 II - Add safety screen at west ladder to platform over T-103A (43" opening)
9-15-75
Vertical Tanks West of HC1 Tank II - Install toe boards on west side of platform
9-15-75
C-500 Scrubber II - Provide intermediate platform or safety climbing device-ladder is
about 35' high.
Being reviewed
Tank Farm raPTKT'TT & C III - Install toe boards III - Cover floor holes
CCR 000016569
8-01-75 8-01-75
TITLE
T-402, 405 422, 452 & 460 III -"Tadder is substandard - side rails are 14" apart.
Dikes II - Install handrails on all cross over steps.
Warehouse II - Add toe board and midrail on handrail overhead storage area.
PRE-TURNAROUND INSPECTION OF WALKING & WORKING SURFACES - VCM PLANT
ESTIMATED COMPLETED
DATE
11-01-76
1-01 -76
10-01-75
C-l01 Steam Stripper Install vertical bars in opening between ladder cage and railing
Coolinq Tower Rungs should be replaced on all wooden ladders (same are broken and others in bad shape)
C-202, HC1 Column Screens should be installed on already existing metal platforms from ladder cages to handrails.
C-l03 Heavy Ends Column Install safety screens in opening between ladder cage and railing
8-01-75 Completed 10-15-75 10-15-75