ALCOA
Engineering Standard
Mechanical
l
EXCESS XIR FLOW SAFETY VALVES
16.4.1 1986 APRIL
PAGE 1
1. SCOPE
This Standard covers the use, selection and location of excess air flow safety valves, intended to shut off air flow upon failure of a hose or fitting carrying compressed air.
iSi
Mote that:
2. CEHERAL
1) Serious personal injury can result from compressed air hoses whipping, as might be caused by rupture, accidental cutting, or being suddenly disconnected.
2) Federal Regulations require that compressed air hose greater than 1/2 inch I.D., be fitted with a safety device at the source of' supply or branch line to reduce pressure in the event of hose failure. This includes plaoement at air line take offs used with air-operated hand tools and portable hoses, but not necessarily every column air drop or outlet and excludes lines piped directly to stationary equipment.
Reference Figure 1, below, which shows a typical valve in cross section, noting that:
1) During normal operation, the poppet is held in position by the retaining ring and spring pressure, as shown in "A".
2) Upon rupture or other failure, the surge of air causes the poppet to close, as shown in "B".
3) The poppet will remain closed so long as upstream pressure exceeds downstream
( pressure.
4} A small amount of air bleeds through the closed valve, to equalize pressure during repairs and facilitate the valve opening automatically.
Reference Appendix, Table 1, for a partial listing of acceptable valve manufacturers,
valve sizes and ratings, noting that these are not intended as reco--endations. Mote that: 1) Flow rates in an air hose depend on compressor output (volume and pressure), line
and hose diameter and length, pressure drop through the fittings and capacity of the pneumatic power tool. 21 Shut-off flow rates for valves vary with manufacturer.
SUPERSEDES 198S APRIL
A ALCOA
Engineering Standard
EXCESS MR FLOW SAFETY VALVES
Mechanical
14.4.1 1948 APRIL
PACE 2
o Proper valve functioning depends on selecting a valve with a shut-off flow rate somewhat higher than the normal flow rate for the system.
o Check flow rate using a flow meter or using the following procedure:
1) Install an excess air flow safety valve based on estimated required flow, and
2) Install the highest capacity air tool to be used on the line.
3) Turn on the air supply and assure that the tool works properly. If not. Install an excess flow rate valve with a higher shut-off flow rate.
41 Substitute a high capacity shut-off valve for the air tool.
S) Grasp the closed chut-off valve and open It fully. The safety valve must close. If not, an excess flow rate valve with a lower closing flow rate must be used.
MOTE: Installation of a safety flow valve without verification of its suitability for the system may not comply with the intent of OSHA regulations.
4. LOCATION
o Locate safety valves as shown in Figure 2, below, noting that in the middle figure:
1) A valve is required at the upstream end of ch branch, as well as at the source.
2) A valve at only the line source may not be sensitive enough to halt flow if a rupture occurs in a smaller branch, since It must have capacity to feed both branches.
3) A valve is required at the source of a line feeding the branches, to prevent whipping should a rupture occur upstream from the "Y".
(
t
| figure 2. Location of valves in typical air lines.
S. REFERENCES c 29 Code of Federal Regulations, Fart 1924, Section 1924.102, Paragraph 1 - "Power- -
Operated Hand Tools*.
4683461055
1
0
ALCOA
Engineering Standard
EXCESS AIR FLOW SAFETY VALVES
0
Mechanical
16.4.1
1988 APRIL PACE 3
6. APPENDIX TABLE 1
EXCESS AIR FLOW SAFETY VALVES1
Manufacturer
Valve Size (NPT)
Approximate Shut-Off Flow at 100 psig Inlet Freasure2
sent
Hansen
1/4
40S0 W. ISO St.
3/8
Cleveland. Ohio 4413S
1/2
3/4
1
1-1/2
2
Le-Hi Valve and Coupling
3/4
Parker-Hannifin 30240 Lakeland
1
Vickliffe. Ohio 44092
Perfecting Service Div. C. W. Murphy Industries
1/4 3/8
F. O. Box 1949
1/2
Charlotte. N. C. 28201
3/4
1
1-1/4
1-1/2
( Rego
2 3 3/8
4201 W. Peterson Ave.
1/2
Chicago. 111. 60046
3/4
1
20 SO 80 110 210 4S0 8S0 130 210
26 58 92 180 300 470 710 1050 2700 SI 8S 110 200 3S0 300 400 600 ii2
Saap-tite Onion City, Pa. 16438
Thomas C. Wilson, Inc. 21-11 44th Avenue Long Island City. N.Y. 11101
1-1/2
2
3
4 175--------------------------------------3/4 1 1-1/2 2 174---------------------------------------3/8 1/2
3/4
1 1-1/4 1-1/2 2
420 693 4S3 721 1268 906 3690 3171 5T5o
tip to 7<H up to 100 up to ISO up to 300 up to 700
i5
42 68 84 120 140 190 260 470 680 840
1 This is < pirtiil list. These manufacturers are not
2
listed. For shut-off
flow rates
at
other
Inlet
pressures.
P.
Shut-Off Flow m (SCFM at 100 psigl /P * 14.7
V 104.7 3 f MS to 130 psi working pressure.
recommended
over
others
not
.
4683461056
q
ALCOA
Engineering Standard
Alcoa
Safety and Industrial Hygiene
ENTERING AND WORKING IN CONFINED SPACES
18.1 1990 JUNE
PAGE 1
: -c
ii?
-I?
1. SCOPE
I i
Hit rila
Use this Standard as the resource for the fundamentals to be employed in the development and application of a location confined space program. These procedures and practices shall be applied to protect Alcoa and Contractor's employees from the potential hazards that may be encountered in entering and working in confined spaces. Confined spaces may be described as, but not limited to, the following:
f-5! s
si|j I? ss
f?|f f|5l
ibt
!*!:
52**
ill: llii
fin SrSs sm
o o o
Large enough to permit an employee to enter and perform work, Has limited or restricted means for entry or exit, Is not equipped for routine employee occupancy, and may contain one or more of these characteristics:
- Has potential to or contains a hazardous atmosphere, - Contains material with the potential to engulf the employee, - Is configured internally in a way that an employee may become trapped,
disoriented, or asphyxiated by changing wall configurations or smaller cross sections, - Contains other established safety or health hazard(s) such as radioactive gauges, etc.
2. DEFINITIONS
Acceptable Environmental Conditions
Confined space workplace conditions with all uncontrolled hazardous atmospheres removed or controlled, and additional environmental criteria in place as required by the location's permit system for entry.
Observer
An -employee stationed outside the confined space, trained as required by this Standard, assigned to monitor the employees inside this space, and other spaces vlthin the limits as authorized by the location.
Entrant
!I Blanking or
1ih*51i Blinding iii
An employee authorized to enter a confined space may serve as an observer if this is approved by the permit. Hay be a fully trained employee vith authority to approve entry by others, and may enter the space covered by the permit provided the observer is informed.
the effective closure of a pipe, line, or duct by fastening a solid plate which covers the inside diameter, extends at least to the other edge of gasket on the flange to which it is fastened, and is capable of withstanding the maximum upstream pressure.
4683461057
SUPERSEDES 1989 AUGUST
H
ALCOA
Engineering Standard
Alcoa Safety and Induatrtal Hyvlane
OTTERING AND WORKING IN CONFINED SPACES
18.1 1990 JONE
PAGE 2
,1!;
Double Block and Bleed
Emergency
Engulfment
Entry
Entry Permit
Entry Permit System
Hazardous Atomosphere
Hot Vork Permit
Immediately Dangerous to Life or Health(IDLH)
Immediate Severe Health Effects
The closure of a pipe, line, or duct by locking and/or tagging a drain or vent which is open to the atmosphere in the line betveen two locked-dosed valves.
Any occurrence or event(s) internal or external to the confined space that could endanger the entrants.
Surrounding and effective capture of an employee by a liquid or finely divided solid substance.
The act by which an employee intentionally passes through an opening into a confined spece. Includes ensuing vork activities in the space.
Written or printed document, established by the location, containing the location's hazard identification and evaluation for that confined space. It may cover a class or family of confined spaces if they contain similar hazards, and is the method by which the location authorizes its employees to enter the permit confined space. It defines the conditions under vhich the permit confined space may be entered, states the reason(s) for entering the space, the anticipated hazards of the entry, identifies the individual authorizing the entry, lists the eligible entrants, observer's department, the personnel who may be in charge of the entry, and establishes the length of time for vhich the permit may remain valid, not to exceed one year.
The location's written procedures for preparing and issuing permits for entry and returning the permit space to service. Designates by name or job title, and the department who authorizes the entry.
Atmosphere vhich exposes an employee to a risk of death, incapacitation, injury, or acute illness.
Location vriten authorization to perform operations vhich could provide a source of ignition such as riveting, veldlng, cutting, burning, heating, or grinding.
Any condition vhich poses an immediate threat or loss of life, may result in irreversible or Immediate health effects, may result in eye damage, irritation, or other conditions vhich could impair escape from the permit space.
Any acute clinical sign(s) of a serious, exposure related reaction developing vithin 72 hours after exposure.
4683461058
a
ALCOA
Engineering Standard
Alcoa
Safety and Industrial Hygiene
ENTERING AND WORKING IN CONFINED SPACES
j,
18.1 1990 JUNE
PAGE 4
1: \ i
ii-H
ia|l
Mil
a.
Ul l
? i'!&sZl
= f- i
K~-~:|mcEC& -SSi
* *S
Hh
o Provide properly maintained equipment for safe entry and working conditions. This includes the monitoring and testing, as well as personal protecive and communications equipment.
o Provide complete training for all personnel in the proper application, use, and inspection of the equipment.
o Conduct the necessary follov-up and inspection to insure that the application and use of all equipment is correctly applied.
The employee(s) is responsible for:
*ltcjS
HI!
f li? "iff
o o
Evaluation of their work area for potential confined space entry situations as an integral part of their job before beginning work of any kind.
Consideration of potential hazards that may develop in the confined space associated with the task, and those associated with the entry into the space.
o Consideration of the hazards surrounding the outside of the space that may affect the overall safety of the space, for example, activities or equipment overhead, fumes adjacent to the space, etc.
o Using a questioning attitude and anticipating the unexpected during the evaluation phase of the job.
o Discussing any potential hazards with the supervisor before action is underway.
o Immediately evacuating the space at the first indication that something is wrong.
o Avoiding the entrance to any confined space vithout following the procedures as defined by the location confined space entry program.
4. WRITTEN CONFINED SPACE ENIRY PROGRAM
As a general rule, these fundamentals shall apply to location programs:
o Establish a written confined space entry program for the proper preparation, issuance, and implementation of confined space entry permits at the location containing the following:
- An inventory of confined spaces by proprietor, department, area, etc. - Identification of the hazards by classifications of the individual confined
spaces. - A written permit system for authorization of entry into a confined space. - Training for users, outside observers, and others. - Equipment for safe entry, monitoring and testing. - Rescue procedures and equipment needed to implement an effective response to
any emergency.
4683461059
EJ
ALCOA
Engineering Standard
Alcoa Safety and Industrial Hygiene
ENTERING AND VORJONG IN CONFINED SPACES
18.1 1990 JUNE
PAGE 3
fill
ii. = t
mt
Ss*
IftI
**S j
ifji
nuf-l#
Hss
litl
nh sit m
lif||lc!
S*l t III
Inverting
Isolation
Line Breaking
Low-Hazard Permit Space
Non-Permit ted Condition
Rendering the atmosphere of a permit space non-flammable, non-explosive, or otherwise chemically non-reactive by displacing or diluting the original atmosphere vith steam or a gas that is non-reactive to that space.
The separation of a permit space from unvanted forms of energy by tagout/lockout, double block and bleed, blanking or blinding, or the removal of spool pieces to disconnect for piping disconnects.
The intentional opening of a pipe, line or duct that has the potential to deliver materials, gases, or fluids that are capable of causing injury.
A permit space with an extremely low likelihood that an IDLE or engulfment hazard could be present, and where all serious hazards have been controlled.
Any condition or set of conditions whose hazard potential exceeds the limits stated in the entry permit.
Oxygen Deficient Atmosphere
An atmosphere containing less than 19.5 percent oxygen by volume.
Oxygen Enriched Atmosphere
An atmosphere containing more than 22 percent oxygen by volume.
Retrieval Line
A line or rope secured at one end to the worker by a chest-waist or full-body harness, or vristlets with the other end secured to either a lifting (or other retrieval) device or to an anchor point located outside the entry portal.
3. RESPONSTBIUTT
The supervisor(s) of the employees involved shall be responsible for:
o Evaluating those areas of his/her proprietorship that could be expected to result in a confined space entry as defined above. The areas may include bins, hoppers, tanks, pits, process vessels, furnaces, machinery, railcars, ships, barges, trucks, and transportatin equipment in general.
o Develop a written program that identifies the means, procedures, and practices for entering the confined space safely.
o Conduct training for personnel immediately supervised as veil as any others who may support the effort on the proper practices, procedures, and equipment to be utilized.
4683461060
0
ALCOA
Engineering Standard
entering and working IN CONFINED SPACES
Alcoa Safety and Industrial Hygiene
18.1 1990 JUNE
PAGE 6
7. WORK PRACTICES - TESTING j
Maintain and use the proper sampling equipment as indicated by the confined space
entry procedures.
J
Document the inspection and calibration of this sampling equipment along with maintenance as specified by the manufacturer.
Train and certify those personnel vho are selected to conduct tests on the confined space for the presence of hazardous atmospheres.
8. WORK PRACTICES - CLEANING
Identify the contents, and empty or drain or clear the confined space as completely as possible.
Use hot or cold water flush, steam, chemical neutralization, or purging.
Apply steam only above the liquid level in tanks and vessels and allow the confined space to cool properly for safe personnel access.
O Bond low pressure steam lines to the space or enclosure to prevent auto-ignition and elimination of static spark potential. Prevent the use of free falling water unless the nozzles or hoses are bonded to the confined space.
9. WORK PRACTICES - VENTILATING AND PURGING
Purge gases lighter than air from the confined space by introducing an inert gas at the bottom of the space and discharging at the top.
Purge gases heavier than air from the confined space by introducing an inert gas at the top of the space and discharging at the bottom.
Conduct sampling of the atmosphere during the purge process. When this atmosphere reaches a point of stabilization, hold at this point for a period of time to ensure that a non-hazardous environment is maintained.
Introduce air with non-hazardous oxygen levels to displace any inert purge gas. Test for adequate oxygen (19.52 - 20.82) before permitting entry.
10. WORK PRACTICES - OTHER .PRECAUTIONS
o Remove all burning and velding equipment from the confined space vhen not in use,.
o Store compressed gas cylinders outside the confined space. The only exception are cylinders used with self-contained breathing aparatus.
J \
4683461061
1
o f ih a m e ifm tft, p *e c *i% *x fm o d u c it o (voc*<VnM rte v n t> e fi o *etm m *dAd
o m ehtad *> m a d * 11 m in un.i.et ot tHo>en-
a *. .v s ...........
otrwN Hum A tco * Mn
**es * h i i<m | i i )I i.%,*
ov**n<ei o* to*MnUN)n%,
H d I t not ndd Io 6 --COwvttfrvliHom lu awy
tum ttn) it
0
ALCOA
Engineering Standard
Alcoa Safety and Industrial Hygiene
ENTERING AND WORKING IN CONFINED SPACES
18.1 1990 JUNE
PAGE 5
- Protection from internally generated confined space hazards like welding, grinding, spray painting, and the use of any portable equipment.
- Information containing confined space hazard procedures and requirements associated with location equipment and facilities for use by Contractors.
5. WORK PRACTICES - ADMINISTRATIVE CONTROLS
As a general rule, apply these fundamentals to the administrative areas of each project:
o Develop written procedures for permanent confined spaces or groups of confined isolation points, hazards, etc. Include specific items like tagout/lockout, and blinding that are fitted to the space; also general hazards, special safety precautions, and the equipment to be employed. (See Attachment 1).
o Include schematic diagrams and/or checklists which indicate the specific valves, motors, piping disconnects, etc., which are part of the required sequence to be followed for each entry procedure. (See Attachments 2 and 3).
o Attach the diagram and/or checklist to the copy of the entry permit posted at the confined space. Have copies available for personnel on all shifts, and retain a centralized copy with the central confined space program file.
6. WORK PRACTICES - ISOLATION
o Use isolation procedures that are developed in accordance vith location tagout/lockout procedures and Standard 18.3.
o Assure that all radioactive gauges inside or in-the proximity of the confined space are effectively isolated by dosing, locking, and tagging the shutter. Verify this by using the appropriate Geiger-Mueller Counter.
o Disconnect, bind, or drop feed and discharge lines to the confined space in such a vay as to protect occupants of the space and personnel outside the space.
o Attach personal danger tags to blinds used to achieve isolation.
o Follow "Double Block and Bleed" or other location specific isolation procedures when alternate methods must be substituted for blinding. Obtain approval of location Engineering and Safety and Industrial Hygiene staff for this method.
o Design blinds for the materials and pressures as required. Provide complete coverage for the flange and opening to eliminte the possibility of leakage.
l*w*
on bn*u o* oM *i lhan AM M nwm company e* n a vta W a tia v
i ' < * * 4 9 t t It tttN flQt b t *p>edgcw O' Cepfcd. I * * * * 0 In
t**t pN ^M flv 9 t Aktmlmtm C o * * * * f e t A m td c * And m*i* W
*NnH (m w iite A
tfol t i H
t, <*
4683461062
ALCOA
Engineering Standard
ENTERING and working in confined spaces
Alcoa Safely and Industrial
18.1 1990 JUNE
PAGE 8
*< i
iniritii*.*in..r**t` tmmnmui
o 'l'f1* ('i'* *
th m
n i
i i
** w*
.
n
*
*
i
i
nnp.wsi >* p*n<eiiwM
0ua*r*i*i ot le fu ttm iA tio n v e*p>ess ot el lb# miiiott. rw oeottot, P*oilicn ot
Aiwfln not Mttn>wlra11<hn m 'omitirnifatMtM (in Ay
hol fM hi tu6tHHtt<ev
o Follow the requirements of Standard 18.2 for properly securing ladders and scaffolds used inside confined spaces.
o Follow Standard 33.053 and suppliers material safety data sheets for all painting required inside confined spaces.
11. OUTSIDE OBSERVER
Use an outside observer for personnel inside the confined space when:
o Potential exposure is hazardous to life,
o Rescue may be difficult.
o The hazard warrants according to location assessment.
Use a retrieval line and body harness to provide safe emergency removal of the entrant by the outside observer when the size, shape, and location of the confined space specifies the use of this equipment in the permit.
Train outside observers for the duties as required by the permit as follows:
o Maintain contact with entrants at all times.
o Monitor conditions inside and outside the permit space to identify potential hazards and recall the entrant from the confined space when appropriate.
o Order entrants to evacuate the permit space immediately when:
- Conditions develop that sure prohibited by the permit. - Detection of behavioral effects of the hazard develop. - Situations outside the space develop that could endanger the entrants. - An uncontrolled condition begins to develop within the confined space. - An observer is monitoring more than one space and must focus efforts on the
rescue of entrants from another space.
o Entry to or leaving the confined space entrance is not pemitted until properly relieved.
o Use a radio, alarm, vhistle, or some appropriate means of communication to summon assistance in case of emergency.
o Attempt to remove the entrant only by the use of a retrieval line.
o Where additional adequate outside assistance is present, enter with all protective equipment and retrieval line as required by the permit.
4683461063
iItn
l
IucM Ot cofMttf.
ym co**te*"V ot
mpkm
AM fiM
ttoh*eeN
tohi t**N*
n ol
Ni w*'*Ht l
w tiri^ tt |MM*fMttfm
o* i f on
I* o*
0
ALCOA
Engineering Standard
Alcoa Safely and Industrial Hygiene
ENTERING AND WORKING IN CONFINED SPACES
18.1 1990 JUNE
PAGE 7
o Turn off all cylinders stored outside the space immediately after use.
o Use personal protective equipment specifically designed for the potential hazards normally encountered in a "worst case situation" as they apply to a given confined space.
o Use respiratory protection according to Standard 18.1.1 with the assistance of the location industrial hygienist as required.
o Use of canister type masks vhich operate on chemical absorption or mechanical filtration is not permitted where the potential for oxygen levels below 19.5 percent are possible.
o Use supplied air respirators with emergency escape bottle or SCBA when there is a likely condition such as:
- Reduced oxygen level below 19.5X or - Release of toxic contaminants from chemical sludge or deposits within the
confined space or - Likelihood of toxic chemical concentrations exceeding the limits where other
types of respiratory protection are permitted (See Standard 18.1.1, Table 1).
Last minute substitutions to facilitate the schedule without protection from the worst hazards shall be prohibited.
o Secure confined spaces vith rotational capability such as kilns and ball mills before entry.
o Secure personnel lifelines to the proper structure as specified in Standard 18.2.
o Use double insulated, GPCI protection, and low current - low voltage (24V max.) electrical systems when working in damp or metallic confined spaces.
o Follow all grounding and isolation techniques before beginning electrical welding in the confined space.
o Select electric and pneumatic tools according to the National Electric Code Classes I, II, or III as required by the conditions in the confined space.
o Thoroughly clean all portable power tools and inspect for defects that may affect safe operation, and follow prescribed grounding techniques before use in any confined space.
o Clean and inspect hand tools selected for use before entry. Use spark resistant tools as required.
o Empty finely divided solids with engulfment potential from storage tanks or protect the entrant(s) with proper lifelines before entry is permitted.
4683461064
q
ALCOA
Engineering Standard
Alcoa Safety and Industrial Hygiene
ENTERING AND WORKING IN CONFINED SPACES
18.1 1990 JUNE
PAGE 9
-i|!
rill
SS =*
ctSl
s 2
-P*lies
t? ;;
(fHii
o o o
Provide additional rescue equipment outside the space and adequate fire fighting equipment appropriate for the potential hazards expected.
Limit the number of entrants in the confined space to an absolute mininum at all times.
Suspend activities, and recall entrants from the confined space when new or different hazards are detected. New procedures, equipment, and further training shall be developed and provided by the supervisor(s) before continuing.
till
l;|: S *
fit?
iii?
rill
12. RESCUE
Location choices for the use of an in-plant rescue team shall include:
o Train all team members in the proper use of personal protective and rescue equipment that is required by the location's entire permit confined space program.
o Train all team members in the proper rescue functions and the requirements for authorized entrants to the confined spaces.
o Conduct simulated rescues at least every twelve months. Use a variety of dummies, mannequins, or personnel and openings and spaces to closely approximate the conditions under which the rescues at that location may be required.
o Ensure that each rescue team has one member that maintains the current certification in first-aid and cardiopulmonary resuscitation (CPR) skills.
or.........
Choose an outside-the-plant rescue service that is completely qualified and trained to meet all hazards and has complete familiarity vith the location confined space program.
13. REFERENCES
- Proposed OSHA Standard 1910.146, 1989 June 5. - National Safety Council Accident Prevention Manual, Ninth Edition. - Proposed OSHA Standard 1910.269, 1989 January 31.
- Standard 18.2 Fall Prevention. id - Standard 18.3 Tagout and Lockout Procedures.
- Standard 33.053 Safety in Painting.
4683461065
a
ALCOA
Engineering Standard
Alcoa Safety and
Industrial Hygiene
WTKRTNn AND VORKTNr; PI CONFINED SPACES
18.1 1990 JUNE
PAGE 10
iu
jfl WORK PERMIT
jJ s
v{ <<e pi
REQUIRED FOR:
|ta'*| 1. Uelding or cutting in any location other than shops or auxiliary shops. 2. Hot work in hazardous and semi-hazardous areas.
\n 3. Entering or working in confined spaces.__________________ ___________________
ill Date
From A.M.
To A.M.
Type of Work
mstl
ill Issued for work on/in !f|
P.M.
P.M.
Workman Assigned to Job i *i
iff Outside Observer Assigned to Job
Department Assigned Job Authorizing Supervisor
CHECK ( ) ONLY IF ANSWER IS
1. Is welding and cutting necessary?
2. Are lines carrying material to or from equipment blinded or removed?
Flammable
Corrosive
Steam
Toxic
*2 3. Are shut off valves tagged or locked in off position?
Flammable
Corrosive
Steam
* A
4. Equipment Preparation
Steamed
Washed
Toxic Purged
F! Are sources of power for agitators and pumps locked in off position?
iJ?i Electrical Switches
Belt Removed
* 6. Protective equipment needed
Respiratory Protection
Goggles
Air Mover
Hard Hat
Fire Protection
Clothing
Safety Belt
Safety Shoes
Will an Operating Representative be present?
8. Has the equipment been checked for residuals?
9. Have hazards of nearby areas been considered?
Other Floor Levels
Welding Machinery Properly Grounded
Severs
Other Machinery
4683461066
i
3
a
ALCOA
Engineering Standard
ENTERING AND VORKTNG IN CONFINED SPACES
Alcoa Safety and Industrial Hygiene
18.1 1990 JUNE
PAGE 11
v
'*
i-'***->"
c
0 0 * * *COJ N a t lo in * n m m n> M e hc<j or omvneo<fe<j
d not mlftfidmd to b * ft rfC*w*l*l`or,i l **y
I 'ml l #!<}><tm H tg t i* iiit * t ii ts fv o ie ii id * '* < mw o> O v in - "y ** >*. f. r i 1
| ( ttw M d n )< 9 M li II |h 4ll not b HcJwC>q tn copied. In wbote 0 In
* tb * im optr'y * AM**bm**i C o w y -v * Am *le* and m u ti
III-10
VESSEL ENTRY PROCEDURE
mM
<vc
o imphied or procaduret
t, products
n
.
tftti io
Quftnio*i ot (etesn oi tba methods, |hoc
Vessel:
R-35L TANK
Date Approved: 1983SEPT09
Department:
CLARIFICATION
Location:
R-35L
Industrial Hygiene Test Required: Yes No X
Classification:_____ Class C
Procedures
1. Empty tank. Look in top manhole to determine that it is completely empty.
2. Blind sump line.
3. Blind all thickener underflow lines to tank.
A. Blind second stage overflow line and causticizer discharge to tank.
5. Blind discharge line to pump suction header.
6. Roll off solid blind on bottom of cone.
7. Fill out and set entry permit at base of ladder leading to top of tank.
8. Each man to enter the tank is to affix his personal white tag to entry permit.
>**i. ot wtotf on bftbftit At otbort ibon Aluminum company o* Mt u b tid iftM tt.
mhowl pernwtainn
61
Superintendent
Safety Manager
JAjCr
4683461067
Itw *
a
ALCOA
Engineering Standard
ENTERING AND WORKING IN CONFINED SPACES
Alcoa
Gaiety add
Industrial Hyytone
18.1 1990 JUNE
PAGE 12
VESSEL ENTRY PROCEDURE
Vessel:
R-S3 A AND B STORAGE TANKS
Date Approved: 1987 NOVEMBER
Department:
RAU MATERIALS 6 MARINE
Location:
R-53
Industrial Hygiene Test Required: Yes ____ No
Classification: Class E
X
Procedures
Before entering these tanks the following oust be observed:
1. Clearence Bust be obtained froa the departaeot supervlaor In charge.
2. The unit supervisor In charge Bust open the svltches. tag and lock out Conveyors #35 36, 37, and 38 before entering the tank.
3. The supervisor In charge should check the level Inside the storege' tank before having the boccoa entry door reaoved by Maintenance.
A. The supervisor should fill out Space Entry Permit Form IPC-1390-76 and place for display at entry of tank.
5. An outside observer Bust be present and In position to observe work Inside the vessel at all tlaes. The observer Bay assist the people Inside as long as the observer does not enter the-'tank or leave the observation station.
6. A procedure must be established for the observer to signal or roBBunlcate with other esployees for assistance in case of an emergency. Employees should be equipped with walkie-talkies.
7. All personnel entering tank Bust attach their white personal danger tag to the entry permit.
6. The supervisor in charge aay ase the group tag procedure. 9. All current tagging procedures are to be followed before entry.
10. If a dusty condition exists Inside the storage tank, respiratory protection should be worn.
11. Do not atteupt to walk on notarial If it Is more than three (3) feet deep (danger of sinking).
12. A rescue harness, wrist straps, or other appropriate Beans of removing a disabled person Bust be adjacent to the point of entry.
4683461068
a
ALCOA
Engineering Standard
FALL PREVENTION/PROTECTION
Alcoa Safety and Industrial Hygiene
18.2 1990 JUNE
PAGE 1
iz X?
'rSa fUc
nil5-!l
ills iiii
**SS
ifsl
im
fitf Sar
ifS?
-w
ill*
ml
f?l!
";*?!saccr
1. SCOPE.
Falls in the construction and manufacturing environments can occur in a large variety of work situations. This standard establishes fall prevention/protection guidelines for Alcoa employees and outside contractors exposed to heights of eight (8) feet or more and at lover heights where especially hazardous circumstances such as over open vessels, machinery, or moving equipment; over water, in ship holds; or over objects which may impose impalement hazards exist. Lifelines and harness systems used solely for rescue operations in confined spaces, etc., are not covered by this standard.
The standard also covers access to portable and fixed ladders, cranes, girders, mobile equipment such as rail cars, roofs, tanks, pits, etc. Portions of this standard have been taken from the National Safety Council's Accident Prevention Manual, and Introduction to Fall Protection (J. Nigel Ellis, 1988), OSHA 29CFR 1910.66 Appendix C, and proposed OSBA 29CFR 1910.128 - .131.
2. DEFINITIONS.
Access Movement by physical or mechanical means to reach a workstation.
Aerial Lifts Mechanical devices such as manlifts, manbaskets, scissor lifts and bucket trucks used for access to heights. The term "skipbox" is reserved for materials use only on construction sites.
Anchorage A secure point of attachment for lifelines, lanyards, or deceleration devices.
Body Belt A strap that a worker can secure around his waist and to which he can attach a lanyard or device for fall arrest.
Deceleration Distance the vertical distance between the belt or harness attachment point at the activation of the fall arrest equipment and that attachment point once the individual comes to a complete stop.
Isf D-Ring An attachment point(s) on the belt or harness for a device or lanyard. I** (Sometimes erroneously named for a carabiner snap hook).
Fall Arrest or Fall Protection System A lanyard or device along with other necessary components that are designed and tested to function together in preventing a fall from occurring or to minimize the potential for compounding injury.
Free Fall Distance The vertical distance between the belt or harness attachment point (at the time of an unrestrained fall) and any obstruction or grade level... or the activation of fall arrest equipment.
Replaces 18.2 Safety Belt Tie-Off
4683461069
a
ALCOA
Engineering Standard
Alcoa Safety and Industrial Hygtone
FALL PREVENTION/PROTECT!ON
18.2 1990 JUNE
PAGE 2
Full Body Harness The design of single or multiple straps that can be secured around the body to which a lanyard or device can be attached. The design distributes the arresting forces over the buttocks, thighs, chest, and shoulders.
Gate Snap hook closure which swings closed to secure.
Hardware Snap hooks, D-rings, buckles, caribiners, adjuster, and 0-rings, that are used to attach the components of a fall protection system together.
Horizontal Lifeline A rail, rope, wire, or synthetic cable that is installed in a horizontal plane and used for attachment of a worker's lanyard or lifeline device while moving horizontally. Used to control dangerous pendulum-like sving falls.
Independent Anchorage A point of attachment that is not part of the working or walking surface or equipment rigging points.
Independent Lifeline A lifeline that is not attached to the work surface..one lifeline per person.
Lanyard A flexible line of webbing, rope, or cable that may be 2, 4, or 6 feet long, and used to secure a body belt or full body harness to a lifeline or an anchorage point.
Lifeline A vertical line from a fixed anchorage or betveen two horizontal anchorages, independent of walking or working surfaces, to which a lanyard or device is secured. Part of a fall protection system used as back-up safety for an elevated worker.
Locking Snap Hooks- A connecting snap hook that requires two separate forces to open
the gate; one to deactivate the gate keeper, and a second to depress and open the
gate which automatically closes when released. Used to minimize roll-out or accidental disengagement.
Retracting Lifeline A fall arrestor whose integral line extends as a worker moves downward and automatically removes slack as the worker moves up towards the unit...Can have a centrifugal locking mechanism or alternatively centrifugal braking mechanism for controlled descent.
Roll Out Unintentional disengagement of a snap hook caused by the gate being depressed under torque or contact with single-action snap hooks that do not have a locking gate keeper.
Rope Hay be wire rope or synthetic rope used for lifelines.
Rope Grab A fall arrestor that is designed to move up and down a lifeline suspended from a fixed overhead anchorage point to which the belt or harness is attached. In the event of a fall, the rope grab locks onto the compatible rope through compression to arrest the fall.
4683461070
a
ALCOA
Engineering Standard
Aleos
Safety and
Industrial
Hygiene
FALL PRFVENTTON/PROTBCTION
18.2 1990 JUNK
PAGE 3
of
Safety Belt A generic terra usually used for raeans of body support.
ss* *1?;
iln
flsf
if t*
'?!
i-fl
fl!i
|l
Shock Absorber A component of a fall protection system that dissipates energy by creating or extending the deceleration distance.
Shock Absorbing Lanyard A flexible line of vebbing, cable, or rope used to secure a body belt or harness to a lifeline or anchorage point that has an integral shock absorber.
Single-action Snap hook A connecting snap hook that requires a single force to open the gate which automatically closes when released.
fifs ss$i
0!
fmZf. Cli_
llo
Snap Hook A self-closing connecting device with a gatekeeper latch or similar arrangement that vill remain closed until manually released. This includes single action snap hooks that open when the gatekeeper is depressed and double action snap hooks that require a second action on a gate keeper before the gate can be opened.
Suspended Scaffold A single point or multiple point work platform used for powered or un-powered access up and/or down the side of a structure.
Synthetic Fibers A manufactured fiber such as nylon, polyester, or polypropylene.
Tie-off The act of a worker securing the end of a lanyard to an anchorage point, the
-S 4
?*t terms tied off, and tying off, are related to tie-off. An anchorage point is
!i! sometimes referred to as a tie-off point. Hi 3. RESPONSIBILITIES.
The supervisor(s) of the employees Involved shall be'responsible for:
o Evaluating the need for personal fall prevention/protection equipment and systems as an integral part of pre-planning the job.
o Supplying and maintaining the proper equipment for the job.
;* o Thoroughly training the personnel in the proper application, use, and inspection of the equipment and systems.
o Conducting the necessary follow-up and oversight to insure that the application and use is correctly applied to the situation.
o Selecting either or both options below as a result of their evaluation of the potential hazards to personnel.
4683461071
q
ALCOA
Engineering Standard
Alcoa
Safety and Industrial Hygiene
PALL PRKVFNTTON/PROTKCTION
18.2 1990 JUNE
PACE 4
Option l....Pall Prevention.
Eliminate the fall hazard during all phases of the job. This includes traveling to and from elevated work areas as as veil as during the tasks. Temporary barricades and signs may be used to deny personnel access. The proper application of scaffolding or platforms vith 42 inch minimum height guardrail and handrail systems, manlifts, secured ladders, etc., may also be used to reduce the risk of falls.
Option 2.^..Fall Protection System.
Select and install a fall protection system that eliminates the fall hazard during the performance of the task as veil as travelling to and from the elevated vork area. Personnel fall protection systems shall meet OSHA 1910.66 and 1910.129 criteria vhen stopping a fall:
- Limit maximum arresting force on an employee to 900 pounds (4kN) vhen used vith a body belt; (reference Figure 1)
- Limit maximum arresting force on an employee to 1,800 pounds (8kN) vhen used vith a body harness; (reference Figure 1)
- Bring an employee to a complete stop and limit maximum deceleration distance an employee travels to 3.5 feet (1.07m); and
- Shall have sufficient strength to vithstand tvice the potential impact energy of an employee free falling a distance of six feet (1.8m), or the free fall distance permitted by the system, vhichever is less.
NEW OSHA STANDARDS FORCE LIMIT
RETRACTING
'NYLON LANYARD
FORCE
IMTFOR
^ HARNESS
--------------------------
Tg7
OSHA FORCE
UWTFOR SOOT BELTS
100 200 300
WORKER WEIGHT (LBS) CONCLUSION: SHOCK ABSORBING UFEUNES 4IAMYAROS MUST BE USEO
FIGURE 1
4683461072
0
ALCOA
Engineering Standard
PALL PREVENTION/PROTECTION
Alcoa Solely and Industrial Hygiene
18.2 1990 JUNE
PAGE 5
he-n
uNMttet o* recommended
Of
or Imputed or* mods ss to Of proeodiMSS dtsCMbod
end Is nol Mended 10 bo *comm*ndiion Iof eny roelpitni ome*i tmon* a teas No *ri<M ict.
thl> engine*lg * i* * * f d is po*kted eotely ig n putpost of d 's e to ^ g avios i eucxcucu
ts
gOluermeniemeet*hoordt*e,c vpertoefetlfaftltl lo,nt.p ro d u c
fh it *1*14*0 i t rn* p m o *tv o f AlurrUrivm C a m p ** Of Am fk and m v*i
be **tued on *equ>t. It shsll not bo loptodueoo 01 ceplod. In ho*o ot In port. Of vte d on belted of eUte** t*o n Aluminum comosny o* Its wbskflerlet. nltnowt poifnlsslon.
The employee is responsible for:
o Evaluation of the need for fall prevention/protection as an integral part of their job before beginning work of any kind.
o Consideration of hazards during the task as veil as travelling to and from the elevated work area.
o Considering the use of temporary scaffolding, handrails, aerial lifts, etc..
o Using a questioning attitude and anticipating the unexpected during the evaluation phase.
o Discussing any potential hazards that may develop during the job with the supervisor before continuing.
Work commences when the supervisor and the employee(s) are agreed that the job can begin and be completed safely.
4. VORK PRACTICES.
As a general rule, these fundamentals shall apply to all jobs as required.
o Provide fixed platforms, ladders, and stairways 4 feet or more in height with the appropriate guardrails, handrails, midrails, toe boards, etc., according to Standard 33.013.
o Use the parameters contained in Standard 33.013 for the design and arrangement of fixed ladders, platforms, and stairways.
o Employees working on suspended staging or scaffolding either inside or outside of a building shall use a lifeline (vith 50001 load capacity per person) that is independent of the other lines connected to the scaffold.
o Employees working on tubular or other scaffolds shall utilize a fall protection system unless it meets the handrail and guardrail requirements of Standard 33.013.
o Use personnel safety nets where appropriate. Install nets as close to the work as possible, not lover than 25 feet, and extend at least 8 feet outvard from the structure. Use manufacturer's installation requirements and instructions.
o Use a fall protection system if there are no fall prevention measures (temporary scaffold, aerial lift, etc.) when working on top of elevated ~ equipment that exposes employees to hazardous situations as defined by the scope of this standard.
4683461073
*1
1
0
ALCOA
Engineering Standard
FALL PREVENTION/PROTECTION
Alcoa Safety and Industrial Hygiene
18.2 1990 JUNE
PACE 6
o Use fall protection systems where fall prevention equipment is not available or applicable when working on crane rail girders. See Figure 1.
o Connect the fall protection system's lanyard in such a manner as to limit the potential free fall to less than 3 feet where practical, and no more than 6 feet in any case.
o Vear safety belt securely fastened and tight enough to prevent slipping out of it. Fit should be snug between the chest and pelvic crest. The "0" ring should be positioned in the center of the back. This is especially true with tongue and buckle belts.
o Punching extra holes to extend the use of the belt is prohibited.
o Use a body harness instead of a body belt where the potential for a "severe free" fall exists, or where the harness would provide additional assistance for a difficult rescue. The harness lanyard positioning for a body harness should be at the shoulder level as a minimum attachment point.
o Select anchorage points for fall protection systems carefully. Anchorage points to which personal fall protection equipment is attached shall be capable of supporting 5000 pounds (static load to failure) per person. In the case of descent devices, they shall at least equal the strength of the line. Anchorage points for engineered fall protection systems shall main tain a safety factor of at least two (2) times the manufacturers fall arrest peak dynamic load test data. Generally, fall protection anchorage points which are permanent should be designed by a competent engineer.
o Equip portable extension ladders vith shoes.. -Tie-off lines at the top of the ladder shall be used to anchor the ladder to an adequate support structure. Maintain lines in good condition. In busy work areas, protection at the bottom of the ladder may be required vlth someone holding it in place.
o Use both hands while climbing. Sliding over the rails is preferred to grasping the rungs.
o Use a fall protection system (provided a fall prevention system is not in place) secured to an appropriate anchor when both hands are required for the task, or the employee is vorking from planks supported on ladder jacks.
o Use a fall protection system (provided a fall prevention system is not in place) when employees are vorking over concrete reinforcing bars, process tanks, vertical pipe, or conduit which constitues a hazardous area.
o Use a fall protection system or a fall prevention system in accordance vith applicable sections of OSHA 1926.500 and the National Roofing Contractors Association publication "Passport to Safety" for employees assigned to roof work.
46B34ei074
a
ALCOA
Engineering Standard
Alcoa
Safety and Industrial
Hyvlone
FALL PREVENTION/PROTECTION
18.2 1990 JUNE
PACE 7
SZc 4z * 5
5r3vi5i1
o Work from aerial lifts as covered by OSHA 1926.556 shall require the use of a body belt and lanyard attached to the boom or basket. Personnel shall not anchor to an adjacent pole, structure, or equipment vhen working from an
aerial lift.
lift
Ifll fill
S5
?:r
i!H
?SStf
|||!?i|i
K{!
s?|r no
5. EQUIPMENT SELECTION.
Select and purchase fall protection systems and components that meet the capacity and performance requirements of this standard and the appropriate national standards for the task in question.
Snap Hooks Use locking snap hooks that require two separate forces to open the gate for disengagement. The use of single action snaps is not recommended.
Safety Belts Body Belts Material choices are cotton or nylon webbing in herringbone or basket weave construction. Avoid leather construction. The belt vidths that normally bear on the employees body may range from 1 3/4 to 4 inches. Wider vidths usually add support and comfort to the mid-section before and after a fall arrest. However, the benefits of the vider width are believed to be relatively small. Local choices for the task and employee preference should be made within the range of materials and capacity requirements to meet the current national standards.
Full Body Harness These are available from several nationally recognized suppliers. SI f The advantage of a full body harness is the ability to distribute arresting forces
over the seat as opposed to the soft, vulnerable mid-section of the body. The absence
of a waist belt can help achieve unrestricted breathing.
Lanyards Select from a variety of materials such as spun nylon, filament nylon, polyethylene, and polypropylene. The use of steel cable is not permitted. Position the lanyard to limit the free fall to 3 feet (.9m), and not more than 6 feet (1.8m) with a shock absorber or full body harness. Shock absorbing lanyards reduce arresting forces, offer tell-tale indications that shock loading has occurred, are best choices with steel lifelines; all require replacement after being shock loaded and stressed. Final positioning snd use of lanyards shall include the proximity of beams, rotating equipment, velding operations, electrical lines, and any obstruction which could add injury to the employee during a free fall. Careful consideration of all factors shall be thoroughly evaluated in the final selections among these choices.
Lifelines The material choices include nylon, polyester, polypropylene, other materials, or steel cable. Haterial choices should take into, account the materials ability to resist rot, mildew, vet strength, and deterioration from sunlight and chemical exposure. For example, nylon may quickly deteriorate from exposure to strong mineral acids. Check with the supplier for details regarding material performance. Capacity shall be provided to support a 5000 pound (2220 kg) dead-weight load per person applied to the center of the lifeline betveen two fixed anchorages* Rope diameters selected for use with a rope grab type fall protection system must meet the
4683461075
a
ALCOA
Engineering Standard
Alcoa
Solely <*
Industrial Hygiene
FALL PREVENTION/FROTECTION
-J
18.2 1990 JUNE
PAGE 8
grab manufacturers specifications. Steel lifelines are best suited for heat or spark protection, or at heights vhere lifeline elongation is limited. Steel lifelines are available vith plastic coating for resistance to oxidation and certain chemicals. Steel cables should be preformed, and the use of either stainless steel or galvanized vire rope can be considered for corrosion resistance. Self-retracting lifelines vhich automatically limit free fall distances to tvo (2) feet or less shall have components capable of withstanding a minimum tensile load of 3000 pound (13.2kN) applied to the device vith the lifeline in the fully extended position.
Personnel Safety Net Shall be manufactured and tested in accordance with ANSI
byA10.ll, OSHA 1926.105, and 0SBA 1910.128. Hesh openings are limited to 6 6
inches. Each net shall bear a label indicating the manufacturer's name, date of manufacture, and test data.
6. INSPECTION AND TESTING.
Safety belts, harnesses, lanyards, and similar fall protection devices shall bear permanent identification marks of the supplier, date of manufacture, and the identification of the Standard to vhich it was constructed. This information shall be indelible for the life of the equipment. The supplier shall certify that the presence of that standard number indicates that the minimum requirements have been met.
Belt, harness, and lanyard assemblies shall be inspected before each use, and receive a documented inspection at least twice per year while flexing the components as follows:
o Visually examine for cuts, cracks, tears, enlarged eye holes, and other signs of wear that might effect strength.
o Visually examine stitching for breaks, ragged strands, loose or rotted threads.
o Visually examine metal hardware for breaks, cracks, fractures, loose anchorage, and corrosion.
o Other requirements as specified by the manufacturer.
Cleaning shall be done according to the manufacturer's instructions vhere appropriate. Testing of fall protection equipment in service is not permitted. In the case of tests performed on an a sample belt, harness, or lanyard, they shall be destroyed to prevent any use. Belts, harnesses, or lanyards that are inspected and rejected for further use should also be destroyed to prevent further use and suitable disposition made of the inspection record.
4683461076
a
ALCOA
Engineering Standard
PALL PREVENTION/PROTECTION
Alcoa Solely and Industrial Myylene
18.2 1990 JUNE
PAGE 9
7. TRAINING
mi
Many belt, harness, and fall protection equipment manufacturers have literature and video training programs on hov to properly inspect and care for their products. It is recommended that each location vork vith their equipment manufacturers to develop specific programs based on their needs and suppliers recommendations.
Training shall be conducted in accordance vith the applicable OSHA or MSHA regulations as a minimum.
It!
?ts *I *c
n In
Ui
i-i fill
issi
lill
i*3
4683461077
h
ALCOA
Engineering Standard
TAGOUT AND l/XXOUT PROCEDURES
Alcoa Safety and Indus trial Hygiene
18.3 1990 JUNE
PAGE 1
i
of m mafhoda, p/ocaitaa. producil or proeadwrai d tte rtb a d o t racommandad M'#n
A
*
a
e
ih
Aico*.
itiiiti o
m man io ma u t
io at
rtclpiAn rt mada
n io o lo i any or tmpfltud a
O tfi #olnt*ilfl H in d i* I t p*v*dd idloty foi tM p u rp o ti o< d u c to H ** a m o ii h k o<<'*
roco rrw ftd
ltona. aapratt
n im d id <o bo of rapfatanla
nniomU
Int
tgoudi
Po?fno ipotMnvtafviVtooftohlAanbM*nAflweupwmuinnduOwcmowmcpoo0fmt>pyaOonfOy0lAotdm.h#Iinl leiuw tbitaonWlidlaromlfauIlal,n
1. PURPOSE
Use this standard to develop the fundamental concepts to protect all employees rom injury. A theoretical boundary line of protection exists for each machine, piece of equipment, or process that separates safety from hazard for the employee. No machine, piece of equipment, or process shall be operated when any-danger tag, either personal or equipment, is attached to an associated isolation device. No supervisor, or employee, or contractor's employee shall cross the boundary of -protection provided by these procedures while the equipment is still energized, or where the appropriate tagout/lockout procedure has not been fully implemented, for the puropose of facilitating continued operation. Any supervisor or employee who fails to follow these tagout/lockout procedures shall be guilty of a major rule infraction, and be subject to the appropriate disciplinary action.
Use those portions of these procedures to customize a program for control of hazardous energy sources. Comply with the-appropriate OSHA, MSHA, or other applicable safety standards.
These are minimum safety requirements. More stringent procedures may be necessary. For example, complicated process systems with several departments involved employing multiple isolation devices and techniques.
Review periodically to confirm that procedures are current vith changing processes, operating practices, and personnel. Verify the contents of this standard vith the attachments to assure no conflicts exist. Use the most conservative alternative to resolve any conflict.
2. DEFINITIONS
Use these definitions:
Affected Employee
- An employee whose job requires him/her to operate or use a machine or equipment on which servicing or maintenance is being performed under lockout or tagout; or whose job requires him/her to vork in an area in which such servicing or maintenance is being performed.
Authorized Employee
A person who. locks or implements a tagout system procedure on machines or equipment to perform the servicing or maintenance on that machine or equipment. An authorized employee and an affected employee may be the same person when the affected employee's duties also include performing maintenance or service on a machine or equipment which must be locked or a tagout system implemented.
4683461078
SUPERSEDES 1988 APRIL
ll
t i
im
t
h a
rtinowl p o rm ittio fv
part, or wiad on b t
l
wo
**
a
d
o
an td
H m
i
v
N
ftt
f
0*
a
ALCOA
Engineering Standard
Alcoa Safety and Industrial Hygiene
i
TAGOUT AND IXXXOUT PROCEDURES
18.3 1990 JUNE
PAGE 2
HU
S|*S
< j5| f|
in?
?ili
ill! O
ifll
Capable of Being Locked Out
An energy isolating device will be considered to be capable of being locked out either if it is designed vith a hasp or other attachment or integral part to which, or through which, a lode can be affixed, or if it has a locking mechanism built into it. Other energy isolating devices will also be considered to be capable, if lockout can be achieved without the need to dismantle, or rebuild, or replace the energy isolation device or permanently alter its energy control
capability.
Energized
Connected to an energy source or containing residual or stored energy.
lifi Energy
||Ii Isolating Device
llsi
SSIe
Ml oo
- A mechanical device that physically prevents the transmission or release of energy, including but not limited to the following: a manually operated electrical circuit breaker, a disconnect switch, a manually operated switch by which the conductors or a circuit can be disconnected from all un-grounded supply conductors and in-addition, no pole can be operated independently: a slide gage: a slip blind: a line valve: a block: and any similar device used to block or isolate energy. The term does not include a pushbutton, selector switch, and other control circuit type devices.
Energy
Source
?* S:
Hot Tap
Any source of electrical, mechanical, hydraulic, pneumatic, chemical, thermal, or other energy.
A procedure used in the repair, maintenance and services activities which involves velding on a piece of equipment (pipelines, vessels, or tanks) under pressure, in order to install connections or appurtenances. It is commonly used to replace or add sections of a pipeline vithout the interruption of service for air, gas, water, steam and petrochemical distribution systems.
Lockout
Is the act of padlocking, or padlocking and tagging a switch or other isolating device in the off or safe position. Isolation devices may have the lockout means built in or may require modification before locks can be used. In cases where more than one department (employee) is involved, provision shall be made for multiple use of padlocks with a white personal danger tag by each department/employee. Lockout is more positive than tagout particularly where the hazard potential is great and it can be properly implemented.
Lockout Device
A device that utilizes a positive means such as a lock, either key or combination type, to hold an energy isolating device in the safe position and prevent the energizing of a machine or equipment.
Normal Production Operation
- The utilization of a machine or equipment to perform its intended production function.
4683461079
a
ALCOA
Engineering Standard
TAGOUT AND LOCKOUT PROCEDURES
Alcoa
and Industrial
18.3 1990 JUNE
PAGE 3
Servicing - Workplace activities such as constructing, installing, setting up,
and/or
adjusting, inspecting, modifying, and maintaining and/or servicing
Maintenance machines or equipment. These activities include lubrication, cleaning
or unjamming, and making adjustments or tool changes, where the
employee may be exposed to the unexpected energizing or start--up of
equipment or release of hazardous energy.
Setting Up - Any work performed to prepare a machine or equipment.to perform its normal production operation.
Tagout.
- Is the act of placing a switch, lever, valve, gate, or other isolating device in the off or safe position and tagging it to eliminate
operation until the tag is removed. Personal identification is provided for by using the signature, date and department spaces.
Power
- A specific procedure or method used to assure that power transmission
System
and distribution lines are de-energized for the purpose of protecting
Distribution employees.
and
Transmission
Clearance
Try - The act of testing start controls to determine that the appropriate disconnect or isolation device has been successfully de-energized.
3. RESPONSIBILITIES
The supervisor(s) of the employees involved shall:
o Be knowledgeable in the potential energy hazards and personal protective equipment requirements; select energy isolation devices, work procedures to be used, and proper energy control plans as an integral part of the preplanning for the job.
o Train personnel completely in the recognition of the obvious energy control hazards and the potential hazards that can develop within the scope of the job.
o Develop complete energy control procedures governing the assignments on or near the obvious and potentially hazardous energy sources.
o Assure that implementation of energy control procedures as defined by this standard are done only by authorized personnel properly trained for the job.
o Furnish properly maintained equipment for the job, including but not limited to personal protective equipment, and hardware like tags, locks, chains, blinds, self-locking fasteners, test equipment, etc.
4683461080
ALCOA
Engineering Standard
Alcoa Safety and Industrial
Hygiene
i
TAGOUT AND LOCKOUT PROCEDURES I|
18.3 1990 JUNE
PAGE 4
o Provide employees with a clear definition of the work area, type, magnitude, hazards, and methods to be used to control the hazardous energy.
o Oversee the correct application of this standard to all aspects of the work.
o Assign a competent lead person to be in charge of auditing the energy control plan where several personnel have been assigned to the job.
o Coordinate plans for process and/or equipment shutdowns vith the appropriate department representatives, communicate plans and schedules to all involved.
The employee(s) involved shall:
o Evaluate the potential for hazardous energy contact, the need for additional personal protection, and other safety precautions before beginning work of any kind.
o Unplug electrical devices fed by a cord,, and develop exclusive control of the plug under conditions vhere unexpected energizing may occur.
o Question all aspects of the job, expected or unexpected, during the evaluation phase of a job.
Stop vork immediately and resolve unusual or unexpected situations at the moment they arise.
Inspect and test all safety equipment before use.' Assure that any prescribed inspection by others is current, and inspect before use as required.
Participate in-a group review of safety instructions for correct interpretation, on major jobs or jobs vhere specific concerns exist. Check vith your supervisor if questions still exist.
Consult vith the appropriate supervisor on any question of tagging an isolating device(s).
4. ENERGY CONTROL PROGRAM
i
Each location shall establish a program of energy control procedures and employee training consistent vith the fundamentals of this standard , using one of the following options:
Option 1
o Use a lockout program when the location energy isolation devices are capable of being locked out.
o Use a tagout system for those devices at the location vhere the lockout of energy isolation devices is not possible. Vhere a lockout program is in effect, a job safety analysis, safety rule, or other written procedure should address the specific situations vhere tagout is acceptable.
AKR3461081
0
ALCOA
Engineering Standard
TAGOUT AND LOCKOUT PROCEDURES
Alcoa Safety and industrial Hygiene
18.3 1990 JUNE
PAGE 5
Option 2
o Use a tagout program vith the tag attached to the same device vhere a lock wouldnormally be used.
o Demonstrate that the location tagout program matches lockout safety provisions as follows:
- Complete compliance with all tagout related provisions - Implementation measures which may include removal of valve handles, etc.
5. HARDWARE AND TAGS
Use the yellow equipment tag, SF-1500 or equivalent, as shown in Figure 1 (See Page 13) to prevent the operation of the following:
o Unsafe equipment or machinery.
o Machinery undergoing repairs that carry over into the next shift or for extended periods of time.
o Machinery that would be damaged by operation.
o New equipment or machinery that has been or is about to be connected to an energy source.
The yellow equipment warning tag does not provide personnel protection. .
The yellow equipment warning tag can only be removed-by the employee who attached the tag or by another authorized employee.
Identify local employees authorized to remove the yellow equipment warning tag. It is recommended that each location include the list of these employees as part of the written procedures and training. See Attachment 1 for an example.
Use the white personal danger tag, SF-7396 or equivalent, as shown in Figure 2, (See Page 14) to provide personal protection. Attach to isolation devices individually as in the case of -the tagout program, or in conjunction vith a lock as in the case of the lockout program.
The white personal danger tag can only be removed by the employee who attached the tag when:
The necessary work has been completed.
o The work has been reassigned.
4683461082
ALCOA
Engineering Standard
Alcoa Safety and
Industrial Hygiene
TAGOUT AND LOCKOUT PROCEDURES
18.3 1990 JUNE
PAGE 6
o At the end of the shift by the employee.
o Vhen the employee leaves the area prior to the end of the shift with the vork incomplete. i
Furnish locks, tags, chains, wedges, key blocks, adapter pins, etc., for the isolation, securing, blocking, and controlling of equipment and process energy release.
Readily identify lockout devices and tags exclusively for controlling energy from other devices and tags that may be similar for other purposes.
Standardize location tagout and/or lockout devices by color, shape, or size; tagout devices by print and format.
Furnish durable lockout and tagout devices that withstand the environmental conditions to which they are exposed. Furnish tagout devices that will not deteriorate or beedme illegible as the result of weather or environmental conditions.
Furnish lockout devices that are constructed to prevent removal without excessive force or special tools.
Provide tagout devices and attachments that are substantial enough to prevent inadvertent or accidental removal.
Furnish tagout attachment devices that are non-reusable, self-locking and non-releasable, and attachable by hand. (Such as a one piece nylon cable).
Furnish lockout and tagout devices that identify the ovner.
Use expressions such as "Do Not Operate", "Do Not Open", "Do Not Close", "Do Not Energize", on the tagout devices to warn against hazardous conditions.
6. COMPLIANCE AUDITS
Conduct an annual audit of the energy control procedures to assure that they are adequate and being applied in the field according to the program requirements. See Attachment 2 for a sample audit form.
Maintain documentation of the audits including the type of equipment or process audited, the employees participating in-the job, the department, the date of the audit, and those persons conducting the audit protocol- and checklist.
Correct deviations or inadequacies in procedures of work practices immediately.
4683461083
0
ALCOA
Engineering Standard
TAGOUT AND LOCKOUT PROCEDURES
Alcoa Safety and Industrial Hygiene
18.3 1990 JUNE
PAGE 7
7. TRAINING
Use OSHA 1910.147.c.7 for mandatory training requirements if the location is under OSHA jurisdiction.
oe2
If?- Use MSHA Subpart 48 for mandatory training requirements if the location is under HSHA
jurisdiction.
All vorldvide locations must, as a minimum, conduct initial orientation training for all employees (excluding clerical and administrative) on the locatipn's tagout/lockout procedures. Production, craft, supervisory, and technical employees should be given a proficiency test folloving the orientation in the form of an oral quiz, vritten exam, hands on demonstration or a combination of these.
Conduct refresher training vhen the results of inspections, audits, observations, or accident experience indicates a lack of understanding or compliance.
Update energy control programs and refresher training vhen changes in the process, equipment, procedures, or audit results warrant a revision to the energy control program.
8. ENERGY CONTROL PROCEDURES
T0/L0 Procedures for Electrical or Electrically Povered Equipment
Use the folloving sequence for implementing these procedures:
apt o Review proposed vork with the supervisor in charge of the equipment or facility. Reach agreement of potential operating interference and whether an immediate
shutdown is required to protect employees and/or equipment.
o Use normal stop procedures to shut down equipment (depress stop buttons, open toggle switches, etc.,.)
o Stand to the side of the panel and open main disconnect svitch(es) or circuit breaker(s).
o
ssf
Tagout (white personal danger tag) or lockout (vhite tag and padlock) the svitch in the off or safe position. Each employee must perform their own tagout/lockout, even if another person has taken the equipment out of service. The supervisor or a member of the crew can be responsible for the crew with their approval. The individual must sign the tag, perform the tagout/lockout, and be responsible for every member of the crew on that job.
o Provision must be made for anyone who desires to add their personal tagout/lockout, even if someone does this for the entire crew.
4683461084
EJ
ALCOA
Engineering Standard
<
Alcoa Safety and Industrial Hygiene
TAGOUT AND LOCKOUT PROCEDURES
18.3 1990 JUNE
PAGE 8
o Test the disconnect or switch handle ater lockout to make certain it cannot be moved to the "on" position.
o Try the machine "start" controls after tagout/lockout to make sure that the main isolation device is open or in the "safe" position. This shall be done before other employees who have tagged/locked out have begun work and while they are positioned safely.
o Verify blade opening visually (when possible) when working on electrical conductors or energized parts.
o Test* for no voltage on phase-to-phase and phase-to-ground before beginning any work.
Only electrical or other authorized personnel shall open an enclosure to operate a disconnect device on the electrical system.
The use of pushbuttons, toggle switches, pressure switches, limit switches, and similar control circuit devices for isolation purposes is not permitted.
Pulling a fuse shall never be the sole substitute for lockout or tagout. One switch may feed several motors individually fused, and svitch tagout may shut dovn equipment unnecessarily. In this case, disconnect, tape, and tagout the vires from the load side of the fuse clips. litssi
?f! CAUTION; If vessels and piping systems are involved, refer to the procedures for these facilities later in this section.
i>;
%9t TAGOUT/LOCKOUT PROCEDURES FOR HECBANICALLY POVERED EQUIPMENT
Equipment powered by internal combustion engines, air, gas, water, steam, etc. are examples for this category. Use the following procedures:
o
til o
ijii
|I5I o
2&1 o
Review proposed work with the supervisor in charge of the equipment or facility. Reach agreement on potential operating interference and whether an immediate shutdown is required to protect employees or equipment.
Use normal stop procedures to shut down equipment (depress stop button, shift lever, operate valve, etc.)
Operate mechanical isolating device such as a valve, or lever, to the safe position.
Tagout (white personal danger tag) or lockout (white tag and padlock) the mechanical isolating device in the safe or off position. Each person must perform their own tagout/lockout, even if another has taken the equipment out of service. The supervisor or a member of the crew can be responsible for the crew with their approval. The individual must sign the tag, perform the tagout/lockout, and be responsible for every member of the crew on that job.
4683461085
ALCOA
Engineering Standard
TAGOUT AND LOCKOUT PROCEDURES
Alcoa
S<ely and
industrial Hyflleoe
18.3 1990 JUNE
PAGE 9
ol iha m aihodt, procaaiaa, p ro a v c li or procaouraa d a tc io o d or racommaodao nem
G 0 '0 *c ht
g g m n iM i or ropraaaniattoot, o c p ro tt or Impntad a rt m od* a t to in# v iM ik t or
tt ol OitdOtiAd Aieo* oiOor toao Ateo*. No
trhrcpipu r<tpoo(
r*
lfyorf *o
to it too
pflfrW d mm#odn
t
o
HandNtf I
to b* a f*c
muodod
Thli to d la not
*hoU or to a v O a M la rla i,
i tm
,f
ftd or
04 ftproOucod or cop o Aluminum company
fN a XftAtfaid la i r * p to c w t* o f Alum fnvflt C w np*r Pi AmoHoo a4 muat
o Provision must be made for anyone who-desires to add their personal tagout/lockout to make sure than it cannot be operated or have its state changed.
o Try the machine "start" controls after tagout/lockout to make sure that the isolation device has provided a complete shutdown. This shall 'be done before other employees who have tagged/locked out have begun work and while they are positioned safely.
Test and inspect for stored air, gas, steam, hydraulic fluid, etc., that remains under pressure in piping, accumulators, and cylinders. Operate enough combinations of controls to eliminate stored energy of this nature in the mechanical systems. Compare equipment component positions with those shown on equipment drawings to bring energy stored in springs or elevated devices latched into position to a zero state.
TAGOUT/LOCKOUT PROCEDURES FOR VESSELS AND PIPELINES
These systems require preplanning to identify all potential hazards before starting work. Include a review of Standard 18.1, Entering and Vorking in Confined Spaces. The supervisor and other employees shall be in complete agreement of the procedures to be followed. Of special interest are:
o Closed valves may leak. Entrance or release of fluids may constitute a hazardous condition. Capping, blanking, blinding, or even disconnecting all service, process, vent, or overflov lines may be required. Bleeding or purging are other alternatives.
o Upstream and downstream pressure may exist adjacent to a hydraulic or pneumatic control valve. Both pressures must be relieved by bleeding off, or disconnecting the proper piping connections. Tag open bleed valves. Consider tagging both sides of disconnected piping.
After these planning steps are complete, follow the appropriate steps as outlined in previous paragraphs.
9. RESTORATION OF EQUIPKENT/PROCESSES TO SERVICE
Each employee shall remove their lock and white personal danger tag when agreement has been reached that the vork is complete.
Vhen all locks and personal danger tags are removed, the yellov equipment tag shall be removed by its owner or another authorized employee.
Employees are prohibited from removing any personal danger tag or lock other than their own. If employees leave the job site before work is complete, and someone else is going to complete the repair, they should remove their lock and personal danger tag, leaving a properly completed yellow equipment warning tag in place to protect the equipment from operation.
4683461086
not tria
*
thati o ttw
H or
M hovt oorrrPaatorv
#*iwAtO oo loowotL t, Of waod on b th a il
b#
pu
tss
ALCOA
Engineering Standard
TAGOUT AND LOCKOUT PROCEDURES
*
Alcoa Safety and Industrial Hygiene
18.3 1990 JUNE
PAGE 10
HI?
When an authorized employee(s) who applied the lockout or tagout device is not available to remove it, that device may be removed under the direction of a supervisor from the missing person's department having a thorough knowledge of the process and equipment involved. The supervisor shall investigate all circumstances related to the lockout/tagout with regard to personal safety and before reaching the conclusion that it is safe to remove the lockout/personal danger tag.
Following the removal of a personal danger tag and/or a lock, a complete written report shall be filed with the employee's supervisor and a copy sent to the Safety Department and the employee. (See Attachment 3)
Employee(s) that have had their lock(s) and/or personal danger tag(s) removed in this manner shall be informed by their immediate supervisor before returning to work.
10. SPECIAL TESTING OR POSITIONING OF HACHINES
Special testing or positioning of machines or equipment must, as a minimum, meet the procedures specified in OSHA 1910.147,f,l.
11. GROUP LOCKOUT OR TAGOUT SITUATIONS
Vhen servicing and/or maintenance is performed by a crew, craft, department or other group, they shall utilize a procedure vhich affords the employees a level of
in protection to that provided by the implementation of a personal lockout or tagout device.
General
Group lockout or tagout devices shall be used in accordance with but not necessarily limited to the following procedures:
o Primary responsibility is vested in an authorized employee for a set number of
employees vorking under the protection of a group lockout or tagout device.
f!
j HI o Provision for the authorized employee to ascertain the exposure status of individual group members with regard to the lockout or tagout of the machine or equipment, and
o
Uf
111
Vhen more than one crev, craft, department, etc., is involved, assignment of overall job-associated lockout or tagout control responsibility to an authorized employee designated to coordinate affected vork forces and ensure continuity of protection: and
o Each authorized employee shall affix a personal lockout-or tagout device to the group lockout device, group lockbox, or comparable mechanism vhen he or she begins work, and shall remove those devices when he or she stops vorking on the machine or equipment being serviced or maintained.
4683461087
0
ALCOA
Engineering Standard
TACOUT AND IXXXOUT PROCEDURES
Alcoa and
Industrial
Hyglen
18.3 1990 JUNE
PAGE 11
Power System Utilization, Distribution and Transmission Applications
o When work requires employees and their equipment and/or materials to be within the clearances defined in Alcoa Engineering Standard 32.60 for energized, non-insulated conductors or their associated components, a power system clearance
shall be implemented.
o Procedures for location power system clearances shall meet the minimum standards as set forth in Alcoa Engineering Standard 32.60 and OSHA 1910.269, Sections (m) "Deenergizing Lines and Equipmeny for Employee Protection" and (n) "Grounding for Protection of Employees".
12. CONTRACTED SERVICES AMD OTHER OUTSIDE PERSONNEL
HU
Where outside personnel are engaged in activities at a location, the location and the
contracted services employer must communicate their respective energy control
procedures to each other.
j
Each party is responsible for ensuring that their respective employees who are likely to interface with each other, understand and honor the other's energy control procedures.
The word contractor may be stamped on both sides of a standard Alcoa tag as a method of distinguishing between the two separate work groups. Another method for a location where a lockout program is in effect would be using color coded locks for 'the tvo groups.
13. ENGINEERING AND MAINTENANCE PRACTICES
After 1989 October 31, energy equipment isolation devices shall be designed and installed to accept a lockout device on all major replacement, repair, renovation or modification of machines or equipment.
Main disconnect devices in the facility shall be clearly identified.
Control devices for field devices that are inputs or outputs for PLC control need to be clearly identified for maintenance personnel or they must be interrupted with auxiliary contacts on equipment main disconnects.
Complex equipment may have several devices located in remote locations or on master panels. Equipment records such as circuit or machine drawings shall be revised promptly to reflect changes in the operations of these devices.
Preplanning of the proper sequence and location identity of the devices must be provided to establish consistency on complex installations.
4683461088
1
0
ALCOA
Engineering Standard
TAGOUT AND LOCKOUT PROCEDURES
Alcoa
Safety and Industrial Hygiene
\
18.3 1990 JUNE
PAGE 12
For large shutdown, the folloving shall apply:
o Procedures and practices for control of hazardous energy sources should be veil established before the work begins. Last minute vork decisions should be avoided.
o
;sii o
Large shutdowns should be covered by specifically written shutdown procedures supplemented by specially marked-up electrical drawings vhich cover the scope of the vork.
Where appropriate, operating employees should be involved in the preplanning of shutdown vork.
o Large scale shutdown jobs should be reviewed with 'the employees involved and should cover the folloving:
- A description of the job to be done and its location. - Identification of the employee(s) in charge and other employee(s) who need to
be informed throughout the job (production supervisors). - What communications have taken place and vhat will continue to take place to
maintain safe working conditions. - The energy control plan for the job, a review of the tagging/locking methods,
available prints for the job, and additional information as required. - Special safety procedures and practices that apply like the installation of
grounding circuits, tests for voltage, tagout/lockout, etc. - Emergency procedures to be used and the location of equipment that has been
provided for these procedures. - Time for additional questions from employees.
Shutdovn notices vhich communicate starting times, temporary feeds, restricted areas and equipment to be affected shall be utilized for large shutdowns.
!s<{
fill
i*;i
4683461089
H
ALCOA
Engineering Standard
TAGOUT AND JjOCXOUT PROCEDURES
Alcoa Safety and Industrial Hygiene
18.3 1990 JUNE
PACE 13
WARNING
DO NOT USE, HOVE 08 OPERATE WHILE THIS TAG IS ATTACHED
00 NOT DETACH UNTIL REPAIRS HAVE BEEN COMPLETED.
This Equipment Ready for Service and Tag Removed By Name ________________ Ho. Dept _______________Date
PROTECT YOUR FELLOW WORKER
ALUMINUM COMPANY OF
AMERICA
.
TAG NO. 161720
Pate..
WARN ING
THIS TAG HAS BEEN ATTACHED BECAUSE: (Write reason In space'below)
DO NOT USE, MOVE OR OPERATE WHILE THIS TAG IS ATTACHED
Tag Attached By
Name_______________ Dep't
Ho.
OSE THIS STUB IN ACCORDANCE WITH SAFETY RULES.
si?
SE-ISOO Rot- >1-01
TAG NO. 161720 Date^_
Has been attached to___________ Because___________ _________
Signed_ _ _ _ _ _ _ _ _ _ _ _ _ Ho.
FIGURE 1
4683461090
*683461091
FIGURE 2
WORK in progress
DO NOT OPERATE
SIGNED BY,__________________ _______ DATE______________________________ DEPT._________________________ ____
SR.73M REV. M44
DANGER
DO NOT OPERATE OR REMOVE THIS TAG. ANYONE DOING SO WITHOUT AUTHORITY IS SUBJECT TO DISCIPLINARY ACTION.
SEE OTHER SIDE.
* i lit* !
M rt
p#*l,
*
r* 4 9n
v#d 9
ni
t
q
wm
*
9 fctfttlt
p--9 t n y
n tb*rl
l A
991
MbMun
vm C9m ptod w tw
pt9
|
91
eop
91 o fh tia !9 n AtwmlAvm company
Am
ltd,
or i
trk t *94
n(n
whola awb>ld
m ull
o< In iif)v
wfmotfi 99tmiaiioA.
*Thu tr>al9t l 9a ttod It n o tin ttm M
tu to
n b
o t
ie
k
It prpitdtd to M y io m t owuet 9* 9 K io " ^ a e o rw rw n d ttk * lor any n<ip**At 9M *M hn Aw ta
oi 1 *uo-oio
ogfualhraanmi#t*t*rtoordfoi,ppn
totnciat
ttki
ot tn,
a, p
0pr*M roouctt
or or
ImpHi^o a> m m )* a 10 m# wii** o* tiie o - o n *v procodw at ockmooo ot r*oomn>*noto
Alco* Safety and Industrial Hygiene
18.3 1990 JUNE
PAGE 14
tagout and iocxoot procedures
Engineering Standard
C3
ALCOA
a
ALCOA
Engineering Standard
TAGOUT AND LOCKOUT PROCEDURES
ATTAGIKEKT 1 III-2
TAGOUT/LOCKOUT AUTHORIZATION FORM
Alcoa Safety and Industrial Hygiene
18.3 1990 JUNE
PAGE 15
i me m aihodi. proeaaaot, product* or procadcraa datertoed or tom m *noad nee*n
or ait*chtna
*'"* akoo%awoc'> A*o. no M Hinort
gua/aniM i 0* repreienutfont, aap/ai* or Impllieo ire mada 10 iho
ltoUbn#da/*cop*m0*mWa*n<Jd*!M*t*ollyotion l?hmpOuo*UMmUoioh<feli-mK len* i
Tula nqhiilnfl end l nol )nnd*d
iItn
l
not bo toptotocod or eoplutf. Ihen Aluminum company or
whole or In. a u b iid U rta t,
fhi tttndftftf > th pfOp*fl ot Aluminum Company ( Amulet and m u ii
Department: __CLARIFICATION Persons or Classifications Authorized:
AREA II GENERAL MECHANIC
Tagout/lockout the following:
1. Pumps and valves on the R-35U caustic cleaning system.
2. Pumps and valves on the hose water, process water, and potable w^tcr systems.
3. Pumps and valves on the R-37 mud circulating system.
4. Pumps and valves on the press drain system.
5. Pumps and valves on the R-36C caustic cleaning system.
6. Pumps and vajves on the filter-aid injection system.
7. Pumps and valves on the washer overflow system.
8. Vasher underflow pumps and valves.
9. Pumps and valves on the R-35A filtrate system.
10. Thickener underflow pumps and valves.
11. Pumps and valves on the R-35L system.
12. Pumps and valves' on the R-35D press feed system.
13. Pumps and valves on the R-35J causticizer system.
14. Sump pump motors and block valves.
15. Vasher and thickener rake drives.
4683461092
th in oihtn
N
of
iikquI p *m U ito n .
*o on rapiMat. wt*0 on b a h til
t*r
or
t r*
perl,
H
ALCOA
Engineering Standard
Alcoa Safety and Industrial Hyglana
TAGOUT AND LOCKOUT PROCEDURES
18.3 1990 JUNE
PAGE 16
111!
s:i*fsI 16.
sfsi^lilf 17.
*!{
18.
lit!
lzl
iffl 19.
fill 20.
Pumps and valves on the synthetic flocculent and starch system. Pumps and valves on the R-35E-1 lime recovery system. Pumps and valves on the R-38 Zimpro pump system. Pumps and valves on the R-35 press dump system. Pumps and valves on the R-35 caustic cleaning system.
-v r
fill
-sg VX
21. 22. 23.
Pumps and Pumps and Pumps and
valves on the R-35 oxalate system. valves on the R-35 rake classifier overflow system. valves on the R-35 rake classifier sand transfer system.
tiff
24. Pumps and valves on the R-35 spiral classifier overflow and sand transfer
Mi? e*o
system.
25. Sand line valves from the sand traps to the classifiers.
26. Press manifold valves (liquor, water, caustic, precoat, and acid).
i#f :h lit
lit
Ssi
Ji:
r* l
I)sl1l
Ah
!ii!
.58 5 zt
sit
27. Press header valves. 28. Pumps and valves on the hydraulic vater system. 29. Pumps and valves on the ff4 residue disposal lake system. 30. Pumps and valves on the storm lake system. 31. Pumps and valves on the process recycle lake system. 32. Pumps and valves on the clear lake system.
Date Approved:
88-12-27
Date Approved:
89-01-03
R.E. Ustruck. Area Superintendent - Clarification
John Palmer Production Manager - Alumina
Date Approved:
89-01-04
G.D. Mlakar Manager - Safety 6 Hygiene
4683461093
ALCOA
Engineering Standard
Alcoa Saloty and Industrial
"yytono
ol Iha maihoda, proeaaaaa. piodueia of pfoeadwiaa daaeiioad of roeommandad haa.n
puaraniaaa of fapraaaniaitoni, atpraaa of Impniad a n mada aa 10 ma vumiaa Of atiaciienti
and la not intandad 10 ba a feonw>andaiion lof any re ip fo n i o m man Alcoa no m h a i>m
aoiaty i m * pgrpoaa i o<cioa>no a * * a ic x v o ic "
tund II
rhi*
TAGOUT AND LOCKOUT PROCEDURES
18.3 1990 JUNE
PAGE 17
ATTACHMENT 2
Audit Protocol for Tagout/Lockout/Isolation Procedures I. Probable Contacts:
A. Safety Contact B. Maintenance Supervision C. Production Supervision D. Safety Committee Personnel E. Craft/Production Personnel F. Contractors G. Engineering Personnel
II. Assess Strengths/Weaknesses from Checklist:
o Target on fair criteria - if they can't meet fair criteria rate as poor.
o If it appears that elements of fair exist, quickly shift to good criteria.
o If it appears that elements of good exist, evaluate for excellence.
III. Verification:
Inquiry (vho do you vant to talk to and vhat special questions do you vant to ask?):
Safety Contact, Maintenance Supervision, Production Supervision
o Describe the tagout/lockout procedures used at this location. Are they vritten?
o Vhat methods are used to communicate these procedures (posting, rule book, etc.?)
o Vhat type of training is provided on this procedure? Describe. Any practical application tests used?
o Vho is trained, hov frequently, and by whom?
o Is training documented? Please describe hov.
4683461094
pail, Of waad oa oaftalt p i omara man AM M Aum company of ha awbaldiaflaa,
a raovaiL h n*H n ba rapaodwcad Of to o l ad. In whoia o# in
rM nandanj t the p o o r ly AM wtmuw Cofi wy ( A itm k * A m v tiy
im oot pormlaaion.
ba
h
ALCOA
Engineering Standard
Alcoa Safety and Industrial Hygiene
TAGOUT AND LOCKOUT PROCEDURES
18.3 1990 JUNE
PAGE 18
0a*
fill lui
*A*i
ipt II!
m
jo Vhat hardware is available to employees for tagout/lockout? (Locks, tags, hasps, etc.)
o How do employees access this hardware? (Individual locks/tags, central tool
cribs, etc.)
I
o How are violations handled? Any examples?
Craft Production Personnel
SSJ*
mill?
flu
ZC
il!
o Are you aware of any recent incidents where tagout/lockout procedures were violated? If yes, please describe.
o IS there hardware or protective equipment for tagout/lockout that is not available? If so, what is it?
o What weaknesses, if any, currently exist in your department's tagout/lockout
program?
I
Observations (Procedures, Practices and Facilities):
o Obtain a copy of any written procedures or rules on tagout/lockout. Compare
it.with the requirements of Alcoa Engineering Standard 18.3.
Iit4s* o Based on Alcoa Engineering Standard 18.3, assess the hardware available for
tagout/lockout, such as tags, fasteners, locks, isolating devices, etc.,
during a facilities tour.
,
o During a facilities tour, note ary jobs not-protected by tagout/lockout that you want to question.
o Review appropriate training records.
Testing (Vhat Activities Do You Want To Employ To Increase Your Confidence?);
K
11Ij1s!
Hi I Si
o Through sampling, verify tagout/lockout procedures by checking tags, locks, isolating devices and by asking questions.
o Through interviews in the field, verify tagout/lockout procedure knowledge among employees and contractors.
TAGOUT/LOCKOUT PROCEDURES
POOR
____ No formal procedure exists to render equipment and production systems/processes to a zero energy state before repair/maintenance, clearing jams, etc.
^gg<j4A095
a
ALCOA
Engineering Standard
Alcoa ?*lely and Industrial
Hyfllan*
TAGOUT AND LOCKOUT PROCEDURES
IB.3 1990 JUNE
PAGE 19
5 T ?
PAIR
A formal procedure exists to render equipment and production systems/processes to a zero energy state before repair/maintenance, clearing jams, etc.
Copies of the procedure are available via wide spread posting, or distribution and have been reviewed with employees.
Maintenance employees have been adequately trained on the procedures and appear to have the best knowledge of them.
The procedure utilizes tags similar to those described in Alcoa Engineering Standard 18.3.
____ The procedure covers all energy sources mechanical, electrical, hydraulic, pneumatic, and stored potential.
Provisions exist for use of lockout in conjunction with tagout, but it is not mandatory.
Excluding group tagging provisions, each employee is required to place and remove their own tag/lock.
;c
____ If written provisions exist to permit group tagging, a clearly identified person/persons is authorized to initiate the group tag.
____ If group tagging is permitted, a procedure exists (i.e. sign in, tag collection, individual tagging at a designated point, etc., ) to insure all .employees protected by the tags are identified and accounted for by the -group tagger.
All tagout/lockout procedures require a check of the tagout/lockout using the following methods as a minimum:
- Test the disconnect to be sure it cannot be moved to the "on" position.
- Try the machine start controls to verify that the right machine was tagged/locked or that the isolation was successful.
- For authorized personnel (as defined and trained by location policies, rules and procedures), verification of the blade openings and test for voltage phase to phase and phase to ground before work.
Pulling fuses is not allowed as a substitute for proper tagout/lockout. Pushbuttons are not permitted for isolation.
4683461096
0
ALCOA
Engineering Standard
Alcoa
Safety and Industrial Hygiene
TAGOUT AND [jOCKOUT PROCEDURES
10.3 1990 JUNE
PAGE 20
GOOD *
fill ____ All the above elements of FAIR are present. ItU
?Ui
Sill
ifii
ji|[
The procedure is vritten and copies of the procedure are available via vide spread posting, and personal copy safety rules for each employee.
____ Production and staff employees (i.e. Engineering, etc.) as veil as Maintenance employees have been adequately trained on the procedures, records of training are documented and examples can be verified.
--i
S lii
Iff |
____ Interviews vith personnel confirm their knovledge of the procedures.
____ The procedure covers all energy sources such as mechanical,- electrical, hydraulic, pneumatic, and stored potential.
____ Where hydraulic or pneumatic energy sources may exist, the procedures provide
mi
more detail and discuss points such as bleed-off, disconnecting and blinding lines, etc.
____ The applicability of tagout/lockout to contracted services is specifically addressed.
____ The use of a lockout in conjunction vith tagout is mandatory, hovever, this may be one lock and not necessarily individual locks.
____ Vritten procedures clearly exist for defining the accepted method for removal of personal danger tags and/or locks vhen an employee fails to remove their tag/lock/lock at the end of a shift.
____ Observations during the plant tour confirm compliance vith tagout/lockout procedures.
EXCELLENT
____ All the above elements of GOOD are present.
aji ____ Individual locks are required vith individual keys and a closely controlled
lii! master.
*3
____ Complex production systems or processes, vessels and confined spaces, et<^., have
preplanned documented tagout/lockout procedures vith identified isolation point references to assist in assuring that all isolation points are properly identified and isolated.
____ It is a model program in all facets.
4683461097
Thla anglnaaitog H andl'd I t provided toU ty to* u*a purpota Ol disclosing a k o * \ ioo '*ojc >
and is nottoleAded lo be a recommendation lor any recipient oirwt man Alcoa n o *i i h i.m
guarantee! or repreaentatlona, erpress or impmed are mede as lo the utim tet or efiacNverwu Ol Ihe m alhodt, proeetiea, products or procedures described or recommended h e n .a
Q
ALCOA
Engineering Standard
TAGOUT AND LOCKOUT PROCEDURES
ATTACHMENT 3
WHITE PERSONAL DANGER TAG REMOVAL REPORT 1. Describe reason for removal of White Personal Danger Tag.
Alcoa Safety and Industrial Hygiene
18.3 1990 JUNE
PACE 21
2. Name of Employee Who Left Tag ______________________________________________ Department Employee Normally Assigned to____________ _____________________ Date Noted on Tag __ _________________________________________________________
3. Supervisor or Specifically Authorized Person Who Removed Tag__________
Date Removed Shift Time
Location of Tag _____________________________________________________________
4. Method Used to Verify Employee was not at Risk (Check All Applicable):
Called Employee's Home and Talked to Employee
____ Called Employee's Supervisor
____ Check Time Card at Clock
____ Reviewed With Other Employees to Determine Presence
____ Walked Equipment/Process
_____ Paged Employee
_____ Checked Security Sign-In
Comments
____
fh l atndtrd l i m properly Ot Alum inum Company of America $no m u ll
ba returned on request, n then not be reproduced or copied, in whole or In perl, or used on behalf o I others then Alum inum company or Its lu b tfd ta rta t, wtmoul permlttlOA.
Date
Signature
4683461098
a
ALCOA
Engineering Standard
Alcoa Safely and Industrial Hygiene
ASBESTOS REHOVAL STANDARD
18.18 1990 JUNE
PAGE 1
Sst*
r c
3S-I i* b i <3-| f*s5*i!1
This standard
covers
1. SCOPE the precautionary measures
to follov when removing
iffl
sl*$
Isl^ ;J
3fil
asbestos-containing materials as veil as legal requirements as mandated by 29 CFR 1926.58, the standard which covers all construction work involving asbestos. The scope of this engineering standard is limited to those requirements and recommendations having to do vith asbestos removal. Other requirements of 29 CFR 1926.58 such as the labeling of intact asbestos insulation and the general industry
pi! requirements from 29 CFR 1910.1001 will not be discussed here. Hore than half of the
ff 5=
111
s ww6
gi !: 5*e S2 2*
fill
as -5
111 re ?*
I &o
states have lavs related to asbestos. Those unique state regulations are not covered in this standard, but whenever state or local requirements are more stringent, they should be followed over the Federal regulations.
Asbestos was used extensively in the past for insulating boilers, furnace linings, steam pipe covering, duct work, gaskets, brake linings, sound insulation, roofing, floor tiles, and for general fireproofing. Vhen materials are suspected of containing asbestos, assume that they do unless cujrrent analytical testing confirms otherwise. Samples of bulk material can be analyzed by the Environmental Health
Laboratory at Alcoa Technical Center. Additional discussion of sample analysis is
included in Section 2.2 on sampling. For purposes of this engineering standard,
materials will be classified as asbestos containing materials (ACM) if they contain
greater than 0.1X asbestos.
ASBESTOS REMOVAL CHECKLIST
1. Industrial hygienist and/or environmental engineer must be contacted prior to removal of any materials suspected of containing asbestos.
2. Obtain current, reliable analysis of materials suspected of containing asbestos.
3. Notification procedures consistent vith Federal and local regulations must be folloved.
4.
i't
u*|
ill!
}5 lit
5.
6. 7.
Employees involved in asbestos removal operations must have had training or certification where required within the last 12 months.
Appropriate medical surveillance as well as employee fitness to wear a respirator must be addressed. Employee respirator fit tests must be current.
Appropriate protective clothing must be specified and worn for each job.
Regulated areas, vith asbestos warning signs, must be established where air concentrations could exceed the PEL.
J
SUPERSEDES 1989-08
4683461099
1
Q
ALCOA
Engineering Standard
Alcoa
Safety and Industrial Hyglana
ASBESTOS REMOVAL STANDARD
r*U
18.18 1990 JUNE
PAGE 2
Ml! 8.
?is| |HI
9.
llli
lifl
10.
sj!
Large Asbestos Demolition/Renovation Projects oust be done in negative pressure enclosures whenever feasible.
Develop a vritten contingency plan for dealing vith any asbestos release emergencies vhich might occur.
Competent persons must supervise activities vithin regulated areas of large scale jobs.
fsa
n\iJVJV
Hit
?*2et:i
fill fill
t 4 DO
11. 12. 13.
14.
Initial personal exposure monitoring is required at the beginning of each job.
Daily exposure monitoring is required for large scale demolition renovation projects.
Vork area must receive a thorough visual inspection after the clean-up phase to insure adequate clean-up. Air monitoring may also be warranted to document safe exposure levels.
All waste materials including used disposable protective clothing must be properly containerized and labeled as asbestos.
15. Placard vehicles carrying asbestos waste on public roadways per D.O.T. requirements.
iIsISI
16. Use Alcoa Form HS-8702 Non-Hazardous Vaste Manifest except in states or municipalities where more stringent requirements are in effect.
Is*
III 17. All asbestos waste must be deposited in a permitted landfill vith state approval
I for asbestos disposal. Notification of the disposal facility prior to asbestos waste shipment is recommended. All local regulations concerning asbestos vaste
disposal must be followed.
i*s
U\
2. REQUIREMENTS
P1 2.1 Notification Procedures. The plant industrial hygienist and/or environmental engineer must be contacted prior to removal of any materials suspected of containing
Tifi asbestos to insure the implementstin of adequate health protection measures and also to arrange for required notification and proper waste disposal. Federally mandated
ilii notification rules for asbestos Demolition/Renovation vork are found in the USEPA
mi National Emission Standards for Hazardous Air Pollutants (NESHAPs) Asbestos
*ii Regulations 40 CFR 61, Subpart M.
Some states, cities, and counties have notification rules in addition to the NESHAPs* notification. All legally mandated notifications are to be made in conjunction vith each asbestos job.
W8346tI00
a
ALCOA
Engineering Standard
Alcoa Safety and Industrial Hygiene
ASBESTOS REMOVAL STANDARD
18.18 1990 JUNE
PAGE 3
NESHAP regulations require the owner/operator to notify the Program Administrator before beginning any renovation or demolition involving asbestos removal. Typically, State Pollution Control Agencies have authority for EPA Clean Air Programs including the NESHAPs Program. EP Regional office can be contacted to determine what agency has NESHAPs authority in your location.
Notification of Scheduled Renovation/Demolition
Days (prior to start of job)
20
Quantity of Friable ACM Being Removed Advisory < 260 ft. or < 160 ft.2 or < 35 ft.3
10 >260 ft. or > 160 ft.2 or > 35 ft.3
If there are no standard notification forms required by local regulations, the following form, designed by Pittsburgh Environmental Control, is recommended (Attachment 1). NESHAPs require the following information as a minimum.
- Company name and address, contact name and phone number.
- Contractor name and address, contact name and phone number.
- Location of renovation or demolition.
=.i
- Scheduled starting and completion dates of renovation or demolition. - Description of facility to be renovated or demolished (including size, age,
prior use, estimated of friable asbestos.)
- Nature of the renovation or demolition and method(s) to be used.
- Procedures to be used to insure compliance with Emission Standards (40 CFR
61.22d and Vaste Disposal Standards 40 CFR 61.22J).
- Scheduled starting and completion dates.
- Name and address of waste disposal site.
- Name, title, and authority of government agent, if demolition is a result of
government order.
2.2 Sampling . This section describes sampling to be conducted during all phases of asbestos jobsfrom planning, through removal as veil as after cleanup. Some of this sampling is required by the 0SHA Standard while other aspects of sampling are highly recommended as good practice during conduct of asbestos removal.
2.2.1 Bulk Sampling During planning phases of asbestos removal jobs, it is essential that asbestos bulk sampling be conducted to determine the extent of asbestos containing materials (ACM). Bulk sampling conducted previously is sufficient to serve this purpose if the results of that previous sampling were conducted using methods sufficiently sensitive to detect the presence of asbestos at 0.1X and the results are considered by the location Industrial Hygienist to be reliable. Recommended test methods are polarized light microscopy (40 CFR Part 763, Appendix A, Subpart F), or other methods of equal or greater 'precision. Alcoa's
4683461101
EJ
ALCOA
Engineering Standard
Alcoa Safety and Industrial Hygiene
iiii
Jjtt
hi* IiIfIi!l
f is*
*1*1
!|ii ?!i*
fIbmt
i-i$ ;>i:
fils
lip
tjit
Mk
ASBESTOS REMOVAL STANDARD
18.18
1990 JUNE PAGE 4
Environmental Health Laboratory has the capability of conducting this analysis and is involved in an N.B.S.(National Bureau of Standards) quality assurance program to maintain analytical accuracy. Arrangements can be made vith EHL to analyze rush samples by contacting them prior to sampling and by sending samples via overnight express mail. Any outside laboratory used for bulk asbestos sample analysis must use comparable analytical methods and maintain a quality assurance program.
2.2.2 Air Monitoring - Personal Exposures Personal air samples are required by the construction standard. Appendix A, a mandatory appendix to the Asbestos Standard, describes NIOSH Method 7400 including both sampling and analytical procedures. NIOSH Method 7400 utilizes a 25 mm diameter open face cassette vith a 50 mm extension covl. Written justification must be made if another method is used. Additionally, the Asbestos Standard mandates a laboratory quality assurance program to be instituted by laboratories conducting analysis of samples required by this standard. ATC's EHL has instituted a quality assurance program to meet the specific requirements of 29 CFR 1926.58. If other laboratories are used, they must also have acceptable QA programs.
All personal air samples are required to be taken in the employees breathing zone. For comparison vith the PEL and action level, sufficient samples should be taken to be representative of each employee's 8-hour (full shift) exposure.
iIt Personal Exposure Sampling
Minimum Sample Volume
Action Level
0.1 f/cc
Permissible Exposure Level 0.2 f/cc
Short Term Exposure Limit 1 f/cc
190 minutes 380 liters 90 minutes 180 liters 20 minutes 40 liters (vith 25 mm filter)
Reference IH Technical Bulletin 89-03
Pfiil*l
'Sii
Effected employees, or their designated representatives, have the right under the 0SHA regulation to observe any monitoring of employee exposure to asbestos. Written results of personal asbestos monitoring are required to be made available to effected employees vithin 15 days of the receipt of such results. Just as vith all personal sampling results, 0SHA Record Retention Requirements, 29 CFR 1910.20, mandate that they be kept for the duration of the individual's employment plus 30 years.
Initial monitoring is required at the beginning of each asbestos job to determine the asbestos concentrations to vhich employees vill be exposed. Exceptions to this requirement are vhen there is objective data to indicate that the ACM cannot release fibers in concentrations exceeding the action level or * vhen there is historical data for closely resembling conditions.
4683461102
0
ALCOA
Engineering Standard
Alcoa Safety and
Industrial Hygiene
31 S s 4l*i1td;*CA
ini
fill
SS =
* 52
i{?
inf *si
?&
jtt
l?s =
>iv
a|*1 :?<
Ill i
Ii|5
mf=2i*l5l
r?n
I--I3
ASBESTOS REMOVAL STANDARD
18.18
1990 JUNE PAGE 5
Daily monitoring is required for large scale demolition renovation projects. Large scale demolition renovation projects are defined by examples under Section 2.6 Vork Practices. The definition of large scale demolition renovation projects pre-supposes that the employee exposures vill exceed the action level of 0.1 fibers per cubic centimeter of air (0.1 f/cc). There must be sufficient samples to represent exposures of each employee assigned to vork in the regulated work area. Regulated vork areas are also explained further in Section
2.6.
2.2.3 Air Sampling - Area Sampling Vhile area sampling is not required by the asbestos regulations, it may be prudent in some circumstances. Area sampling is recommended in the non-mandatory Appendix E of the OSHA Construction Standard for Asbestos for large scale asbestos removal projects vhich utilize negative air pressure enclosures. Area samples are recommended in the vork area, in the clean change room at the periphery of the restricted area, and in the area of the portable ventilation unit exhaust. Additional area samples are recommended in the asbestos removal area folloving cleanup. The enclosure should not be dismantled unless final clearance samples are belov the OSHA action level of 0.1 f/cc. EPA recommends that these clearance samples be less than 0.01 f/cc for schools. Areas such as offices, lunchrooms, and control rooms should meet the EPA's recommended "clearance level" of 0.01 f/cc. Clearance sampling for the purpose of determining the adequacy of cleanup is done after surfaces in the vork area have been alloved to dry thoroughly. Use of forced air equipment is sometimes used to conduct aggressive sampling in order to dislodge any stray fibers from surfaces and thereby represent vorst case conditions.
Minimum Sample Times for Area Samples
Clearance Level
Minimum Sample Volume
0.1 f/cc
120 1
0.01 f/cc
270 1 (540 1 is preferable)
2.3 Employee Training Training shall be provided annually to all employees involved in asbestos removal operations. All Alcoa employees and outside contractors exposed to asbestos > 0.1 f/cc must have completed required training at some time vithin a 12 month period prior to assignment to any asbestos job. If asbestos vork occurs infrequently during the year, JSAs and/or training materials should be available to employees for their reviev prior to the job.
The plant industrial hygienist can offer assistance in employee training programs. Attendance at these training sessions should be documented. OSHA requires that records of asbestos training be kept for a period of one year. This should be considered a minimum requirement. The training program should include the folloving:
4683461103
ALCOA
Engineering Standard
Alcoa Safely and Industrial Hygiene
ASBESTOS REMOVAL STANDARD I
18.18 1990 JUNE
PAGE 6
(a) Recognition of asbestos. (b) Health effects associated vith asbestos exposures including the
relationship betveen asbestos and smoking. (c) Nature of job which could result in exposure. (d) Protective measures including engineering controls, work practices,
housekeeping, and personal protective equipment used to reduce potential
exposures. (e) Respirator fitting and use. (f) Medical surveillance requirements.
Some states have adopted additional regulations requiring standardized training and licensing of asbestos removal contractors. In locations where this additional requirement is in effect, appropriate licenses and certifications must be obtained.
2.A Medical Surveillance. Employees vearing negative pressure respirators and employees exposed at or above the action level of 0.1 f/cc for 30 or more days a year are required to be in a medical surveillance program as outlined in 29 CFR 1926.58. For Alcoa employees, this periodic evaluation vill be conducted according to Alcoa Medical Protocol B7, Occupational Medical Evaluation, Asbestos. Medical records made in accordance vith the OSHA Asbestos Standard are subject to record keeping requirements as set forth in 29 CFR 1910.20. Medical records are required to be maintained for the duration of employment plus 30 years.
5i
?! 2.5 Personal Protective Equipment.
2.5.1 Respirators. Respiratory protection used for employees involved in asbestos jobs must be used in accordance vith Alcoa Engineering Standard 18.1.1 as well as OSHA regulations (29 CFR 1910.134 (b), (d), (e), and (f). This engineering standard describes minimal requirements of a Respiratory Protection Program including medical evaluation of respirator users, training, and fit testing. Fit testing under the Construction Standard is required prior to the initial job assignment and every six months thereafter. All respirator fit testing done in conjunction vith this standard must be carried out according to the provisions of Appendix C to the OSHA asbestos standard for construction, vhich is mandatory.
%iil
The plant industrial hygienist can assist in the selection of appropriate respiratory protection. OSHA does not allow single use disposable respirators to be used to meet respiratory protection requirements of the asbestos standard. The selection of appropriate respiratory protection depends upon the concentration of asbestos in the vork environment. An additional consideration in respirator selection is that the OSHA standard gives employees a choice of using a powered air purifying respirator (PAPR) rather than a negative pressure regulator so long as the PAPR provides adequate protection. Although OSHA would not require respiratory protection for employees exposed to less than the PEL, it is a good practice to use respiratory protection in any vork situation where accidental exposure might occur due to some event such as rupturing of a glove bag or breakage of an asbestos waste container.
4683461104
a
ALCOA
Engineering Standard
Alcoa
Safety and Industrial Hygiene
ASBESTOS REHOVAL STANDARD
m y4 * 3 o| ? 2Z! 5<m 6
Xc S
i6liUo*
ijii
i||l
Si** ft Sr if fl lUi ?-siifx:
fill
Z
Exposure Level (X) PEL = 0.2 f/cc X < 10 (PEL) 10 (PEL) < X < 50 (PEL) 50 (PEL) < X < 100 (PEL)
100 (PEL) < X < 1000 (PEL)
X > 1000 (PEL)
Respirator Type
- 1/2 mask HEPA
- Full facepiece HEPA
- PAPR HEPA - 1/2 mask supplied air
(positive pressure mode)
- Full face supplied air (positive pressure mode)
- Full face supplied air with auxiliary SCBA
18.18 1990 JUNE
PAGE 7
too HEPA - High efficiency particulate absolute SCBA - Self contained breathing apparatus
Reusable respirators should be thoroughly washed to remove any asbestos contamination prior to sanitization and storage (refer to Engineering Standard 18.1.1).
2.5.2 Clothing Appropriate work clothing is required to be provided to employees when they are exposed to asbestos above the PEL and when the possibility of eye irritation exists. The purpose of special clothing for asbestos jobs is to prevent the contamination of street clothing that will be worn home by the employee. The type of work clothing which is necessary depends on the type of work that will be done.
For large removal operations, where there is a greater possibility of contamination, employees vill need whole body coverings including:
Coveralls or Vork Clothes - These can be either disposable garments or reusable garments which are dedicated to asbestos work.
Footwear - Molded rubber boots with safety toes can be washed or wiped clean of asbestos contamination following the job. Disposable rubber shoe coverings can be used to protect work shoes from contamination and- they are available in styles of sufficient durability to withstand use in the work environment. Tyvek shoe covers would only be adequate under the most controlled conditions and they do present a greater slipping hazard than rubber shoe coverings. Pant legs should be worn outside any boots or shoe coverings and taped to them around the ankles.
4683461105
a
ALCOA
Engineering Standard
Alcoa Safety and Industrial Hygiene
ASBESTOS REHOVAL STANDARD
18.18 1990 JUNE
PAGE 8
Work Gloves - Work gloves to be used should be selected on the basis of hand protection required. Inexpensive cotton vork gloves are a good choice because they can be laundered during the job and disposed of at the job's completion. Sleeves of coveralls should be brought down over gloves and taped at the vrists.
Head Coverings - Disposable head coverings are recommended when jobs involve removal of overhead asbestos or are excessively dusty. Tyvek hoods are available attached to disposable coveralls or as a separate garment.
Eye Protection - Safety glasses, faceshields, vented goggles, or other appropriate eye protection must comply vith the provisions of 29 CFR 1910.133.
Respiratory Protection - Refer to Section 2.5
Small aspestos jobs such as removal of pipe insulation |n a glove bag or removal of an entire asbestos covered pipe or structure also requires some protective clothing. Due to the nature of these jobs, appropriate protective clothing may not need to be as extensive as that required for large scale asbestos jobs.
Coveralls - Even though exposures during these small jobs should not exceed the PEL, disposal coveralls are recommended as a precaution against contaminating vork clothing vith asbestos fibers.
l
Gloves - Disposable vork gloves may be necessary for some small scale asbestos jobs depending on the need for hand protection from sharp or abrasive objects.
Shoe Coverings - The need for protecting vork shoes from asbestos contamination vill depend on the nature of the job. If there is a risk of contamination, disposable shoe coverings or deanable vork boots are recommended.
Eye Protection - Facility requirements for eye protection must be met.
Respiratory Protection - Half mask, negative pressure respirators should be used during glove bag jobs.
2.5.3 Disposal of Personal Protective Equipment. Before leaving the vork area, specific procedures should be folloved for removal of protective garments so as not to contaminate the employee or the surrounding areas. Section 2.7 of this* standard discusses personal hygiene practices and hygiene facilities in more detail.
All disposal protective equipment (garments, gloves, etc.) is to be treated as asbestos-containing material and disposed of accordingly. (See Section 2.8).
1683461106
3
a
ALCOA
Engineering Standard
Alcoa
Safety and Industrial Hygiene
ASBESTOS REMOVAL STANDARD
18.18
1990 JUNE PAGE 9
2.6 Work Practice and Engineering Controls. Vork practices and engineering controls should be used to achieve compliance with the PEL of 0.2 /cc.
2.6.1 Restricted Areas. OSHA regulations require the establishment of regulated areas whenever concentrations of airborne asbestos exceed or could reasonably be expected to exceed the PEL. The regulated area is meant to keep the number of employees in the vork area to a minimum, to restrict access to authorized persons who are properly trained and outfitted in adequate personal protective equipment as well as to protect persons outside the vork area from exposure to asbestos.
Warning signs are required to be posted around the perimeter of the regulated area so that employees have the opportunity to read them and take appropriate measures before entering the vork area. Unless local regulations require more stringent measures, signs must conform to OSHA Regulation 29 CFR 1926.58 (k)(l), and read as follows:
DANGER
ASBESTOS CANCER AND LUNG DISEASE HAZARD
AUTHORIZED PERSONNEL ONLY RESPIRATORS AND PROTECTIVE CLOTHING
ARE REQUIRED IN THIS AREA
2.6.2 Large Asbestos Demolition/Renovation Projects. All requirements in 29 CFR 1926.58 (g) (1) apply to asbestos removal, renovation, and demolition projects. Exceptions to these requirements are made in the case of small scale short duration operations which are discussed in Section 2.6.3 of this standard. Engineering and vork practice requirements for large scale asbestos demolition/renovation projects include the following:
(a) Negative pressure enclosures must be constructed in the regulated area vhenever feasible. Feasibility is not determined by cost, rather it relates to factors such as space limitations or greater hazards. It is recommended that this enclosure comply vith guidelines in the Appendix F to
Hi the Asbestos Construction Standard. This non-mandatory Appendix is entitled "Work Practices and Engineering Controls for Major Asbestos Removal, Renovation, and Demolition Operations". Enclosures may be temporary structures lined vith a double layer of 6 mil flame retardant polyethylene sealing all of the seams and penetrations through the plastic sheeting. A single means of access and egress should be provided vith all other doors sealed. This doorway should be covered vith a double flap of
4683461107
a
ALCOA
Engineering Standard
Alcoa Safely and Industrial
Hygiene
ASBESTOS REMOVAL STANDARD
18.18 1990 JUNE
PAGE 10
plastic sheeting to separate the work area from the hygiene facility which vill be discussed further in Section 2.7. Ventilation is to be provided using a number of HEPA filter units sufficient to achieve three to four air changes per hour in the enclosure. OSHA also recommends a pressure of -0.02 inches of water within the enclosure. By definition, HEPA filters must be capable of removing 99.97X of the asbestos particles from the air. HEPA units are to be operated 24 hours a day during the entire project. Exhaust air must be adequately filtered for asbestos removal and should go, if possible, to the outside of the building where the asbestos project is being conducted.
(b) Competent persons must supervise activities vithin regulated areas, including setting up negative pressure enclosures and ensuring its integrity, ensuring that engineering controls are functioning, controlling access to the regulated area, ensuring that employees entering regulated areas are properly outfitted vith PPE, ensuring that employees are adequately trained, sampling exposures, inspecting employees work clothing for rips and tears, ensuring that employees follow decontamination procedures. Responsibilities of competent persons are described in 29 CFR 1916.58 (b),(e) (ii) (A)-(H), and (e) (6) (iii).
(c) Only authorized persons are to be allowed within the restricted area. All such persons must comply with training requirements (Section 2.2), medical surveillance requirements (Section 2.4), and the personal protection requirements including respiratory protection (Section 2.5).
2.6.3 Small-Scale Short Duration Asbestos Jobs. Engineering controls and safe work practices are required to be used to control exposures during small scale asbestos jobs to levels below the action level of 0.1 f/cc. OSHA does not require negative pressure enclosures, supervision by a "competent person" or decontamination facilities for small-scale, short duration tasks. Examples of such tasks include pipe repair, valve replacement, installing electrical conduits, installing or removing dryvall, roofing, and other general building maintenance or renovation involving only limited exposure to asbestos. Any asbestos removal which can be accomplished in a glove bag is considered to be a small-scale job. Controls and vork practices which can be used to control exposures during small-scale jobs include:
(a) Vet methods - Amended water or removal encapsulants. (b) Removal methods such as carefully cutting asbestos from pipes or other
surfaces. (c) Glove bags. (d) Removal of entire asbestos insulated pipe or structure. (e) Mini-enclosures.
4683461108
a
ALCOA
Engineering Standard
Alcoa
Safety and Industrial Hygiene
ASBESTOS REMOVAL STANDARD s| |'
alls
18.18 1990 JUNE
PAGE 11
mI
SS3U *1Z
*-O
o!-S
ss5
if Is
t* s;
ifii
|Si
TIif?S*s88 -i*v
SiS* ?*?: S2SX
mslssi
|?|?
"!li
2.6.4 Dust Suppression Techniques. Wherever feasible, vet removal methods are required to be utilized. In a very limited number of situations vet removal is not feasible such as:
1. Situations vhere electrical hazards exist such as removal of asbestos from a "live" electrical box.
2. Removing asbestos insulation from a live steam pipe.
Where it is not possible to disconnect electricity or to turnoff the steam, asbestos material can be removed in a dry state. Prior to removal, asbestos material should be sprayed vith water containing a vetting agent to enhance penetration. Airless sprayers are recommended for application of vetting agents. The vetting agent should consist of 50X polyoxyethylene ester and 50X polyoxyethylene ether in a concentration of one ounce in five gallons of vater. The material should be kept vet during all stages of vork to minimize exposure to employees and emissions to outside air. Water should not be used if this would introduce other hazards (i.e., electrical, generation of toxic gases, etc.).
2.6.5 Work Practices. Written asbestos removal plan is recommended for large scale asbestos renovation/demolition vork in Appendix F. Such a plan vill describe the vork practices as veil as control methods. Such a plan vould have information that is also required to be reported as part of the NESHAPS requirements (40 CFR 61, Subpart M).
Asbestos material should be removed in small sections and handled very carefully. While still vet, the pieces of material should be carried and lovered to ground level rather than dropped, and then placed into appropriate vaste containers. Section 2.8 has more information on waste disposal.
I**
??? *P| 1**|
lill
!?*!
If the vork is regulated under U.S. EPA Clean Air Act regulations, and vater cannot practically be used for dust control, a dust collection/exhaust system is required. Such a dust control system may be necessary even if not mandated by regulation, depending on the specifics of the job, and potential for airborne emissions and employee exposure.
2.6.6 Housekeeping and Clean-Up.
(a) All surfaces in the vork area must be cleaned using vacuum cleaners equipped vith HEPA exhaust.
(b) All vaste materials should be placed promptly into labeled containers to reduce asbestos dust hazard in the vork area.
^461109
0
ALCOA
Engineering Standard
Alcoa
Safety and Industrial Hygidw
ASBESTOS REMOVAL STANDARD
18.18 1990 JUNE
PAGE 12
(c) Vhen asbestos removal job is complete, all surfaces should be cleaned vith a HEPA-filtered vacuum or vith damp rags. Do not dry sveep asbestos materials, as this vill create airborne dust.
The asbestos vork area must receive a thorough visual inspection after the clean-up phase to insure adequate clean-up. Industrial hygiene monitoring may also be warranted to document safe exposure levels. The EPA recommends that a "clearance level" of 0.01 f/cc be achieved for schools. Clean-up in areas which vill be reoccupied by people for more than eight hours a day such as offices, lunchrooms, and control rooms should meet the EPA "clearance level". All plastic sheeting, cleaning materials, clothing, and all other disposable items used in the vork area shall be packed into vater impermeable containers and properly disposed of as described in Section 2.8.
2.6.7 Prohibitions. The folloving vork practices are specifically prohibited during asbestos jobs.
(a) Employee rotation is not considered by OSHA to be an acceptable vay to reduce employee exposures to asbestos.
(b) High speed abrasive disk savs are not permitted to be used for asbestos vork unless they are equipped vith HEPA exhaust.
(c) Compressed air is not permitted to be used to remove asbestos unless it is used in conjunction vith an enclosed ventilation system.
2.6.8 Contingency Plans. Written asbestos emergency plans are recommended for
* dealing vith asbestos release emergencies and for unexpectedly encountering ACM during jobs, CERCIA RQ 1 lb. (0.454 kg.)
2.7 Personal Hygiene Practices and Hygiene Facilities.
IIs? 2.7.1 Smoking and eating are not permitted in the vork area. Employees should
thoroughly wash their hands, faces, and arms before smoking or eating during
i breaks and upon job completion. Lunchrooms vith airborne concentrations less than the action level must be available to employees vorking in regulated areas.
fl I
2.7.2 Decontamination Facilities. Use of decontamination facilities for employees in jobs where they are exposed to concentrations of asbestos greater than the PEL is mandatory. These facilities are comprised of a clean room, a
shover room, and an equipment room vhich is directly connected to the vork area.
The design of these hygiene facilities is described in non-mandatory Appendix F-
to the Construction Standard.
4683461110
0
ALCOA
Engineering Standard
Alcoa Safety and Industrial Hygiene
ASBESTOS REMOVAL STANDARD
18.18 1990 JUNE
PAGE 13
u\
rt
in
|!|i
till
.?tj
2U
(a) Equipment Room - The equipment room, also known as the dirty room, is the area connected directly to the work area with a double flap type doorvay. This is the area in which the vorkers remove contaminated work clothing before proceeding to the shower room. It also serves as an equipment storage area. Asbestos waste containers may also be decontaminated and moved out of the work area via the equipment room. Separated from the equipment room by a double flap is the shower room.
(b) Shower Room - Shower facilities should be contiguous with both the equipment room and the clean room. All workers leaving the work area are required to shower. Showers can also be used to clean contaminated equipment and materials such as respirators and work boots which are being taken out of the restricted area for further sanitization. Shower facilities could also be used to decontaminate the outside of asbestos waste containers. Separated from the shower room by a double flap is the clean room. The subject of contaminated shower water is addressed in Section 2.8.A.
(c) Clean Room - Clean rooms or change rooms ihould provide for storage of
workers' street clothes and personal belongings. They should also be equipped with towels (disposable towels are available) and Clean PPE needed for the job.
Vhen it is not feasible to construct decontamination facilities adjoining the worksite because of space limitations or the lack of water, the Construction Standard allows for some alternative procedures to prevent spread of asbestos contamination between the job site and remote shower facilities.
(a) HEPA vacuum protective clothing at the worksite, then proceed to showers or
(b) Change into new disposable suits at the worksite before proceeding to the showers.
(c) Exposed skin areas should be viped clean with vet toweling or premoistened tovelettes.
2.7.3 Exceptions. Small scale asbestos jobs do not require the use of decontamination facilities, however, practices oust be adopted to prevent spread of asbestos away from the job site. HEPA vacuuming disposable clothing is strongly recommended as such a practice. Following this, disposable clothing can be removed and properly discarded with other asbestos vaste.
2.7.4 Laundering. Reusable asbestos work clothing or other personal protective equipment (PPE) should be stored in containers labeled with asbestos warning labels. Any person who launders or cleans contaminated PPE or work clothing is required to be informed of the potential harmful effects of asbestos and protective measures that should be taken. Contaminated work clothing should not be shaken or handled in a way that is likely to create airborne fibers.
4683461111
1
a
ALCOA
Engineering Standard
Alcoa Salely and
Industrial Hygltnc
ASBESTOS REMOVAL STANDARD
18.18 1990 JUNE
PAGE 14
2.8 Waste Disposal. Federal regulations which deal with asbestos waste are contained in the NESHAPS (40 CFR 61, Subpart M 61.145 - 61.147). As part of the notification procedure described in Section 2.1, generators of asbestos waste from renovation/demolition projects are asked to describe the method of containing asbestos waste as well as the name of the waste site to which waste will be taken for disposal.
2.8.1 Containers To reduce generation of airborne fibers, asbestos waste should be placed into disposal containers while wet. The type of container which is appropriate for asbestos waste is dependent upon the type of waste. . All asbestos waste containers shall be free of asbestos dust before leaving the restricted area.
OSHA regulations require that asbestos waste containers be labeled with the following:
id? ail
DANGER
CONTAINS ASBESTOS FIBERS AVOID CREATING DUST
CANCER AND LUNG DISEASE HAZARD
it!
iitl.l*
I4.*
f
ill
fS
SB,
Dil
(a) Recommended containers are 6 mil thick polyethylene bags.
(b) sturdier waste containers such as metal drums, fiber drums, or poly-lined plywood boxes.
<c) Pipes and equipment insulated with asbestos being removed in large sections can be wrapped in 6 mil plastic to create leak-tight containers.
2.8 .2 Transportation. In the United States, containers should be transported vith shipping documents and identification. Shipping Name: Waste Asbestos
RQ ORM-C. Pittsburgh Environmental Control recommends the use of Form HS-8702 Non-hazardous Waste Manifest except in states or municipalities where asbestos has been designated as a hazardous waste and manifests are required. There are no Federal regulations concerning the type of vehicles which should be used to transport asbestos waste, however, some state regulations specify that asbestos waste be transported in closed vehicles. As a minimum, the load must be veil secured and transported in such a vay to prevent damage to containers during transport.
2.8.3 Landfills. Waste asbestos is a "non-hazardous" solid vaste under Subtitle D of the Resource Conservation and Recovery Act (RCRA). All asbestos vaste must be deposited in a permitted landfill vith state approval for asbestos disposal.
4683461112
H
ALCOA
Engineering Standard
Alcoa Safety and Industrial Hygiene
*
o l ih t m tih o d t. p ro c ttttt, poducit o* ptocedu>e* d e tc i-o to ot iK om m fA O eO n e rc ''
"
*
i*
o
e
m * o t A t 10 ih t uirM*# o* e M
><.<)AS
No
tiuH iM "v a mn AK04
t i 01 <
0IAt
iinol
%I **
mM
Ap
ttt
rH
p iiitd
tIifn^
tf
lo
H M lo ir
n e M )lllo n of im
iiitg |i iO iiO lip < o < M lo tM fCO rv p rtM n ia iio n v
iig H iim ol m ln m * o* it
tn<)Mli|llnt
q ua'A m
ASBESTOS REMOVAL STANDARD
18.18 1990 JUNE
PAGE 15
(a) Before using a landfill for asbestos disposal, it is recommended that the site be visited and investigated to confirm that it is permitted, operating in accordance with Part 61.25 of the Clean Air Act regulations, and is being operated by reputable management.
(b) Notification of the disposal facility prior to asbestos vaste shipment is recommended.
(c) To minimize air emissions during disposal, the EPA recommends that the landfill designate a special area for asbestos vaste vhich is separate and preferably isolated from other activities. It is also recommended that asbestos vaste be deposited in trenches or at the Mtoen of the slope and covered vithin 24 hours of disposal vith at least six inches of material. Asbestos vastes should be compacted only after being covered.
2.8.4 Other Vaste. Contaminated vater from asbestos renovation demolition jobs may be regulated in some locations. It is recommended that asbestos levels in any vater discharged from an asbestos renovation or demolition site be controlled to less than EPA's recommended Maximum Contaminant Level (MCL) of 7.1 million fibers per liter in drinking vater. The generally recommended disposal procedure is to filter the contaminated vater through a tvo stage disposable cartridge type filtering system (20 micron filter folloved by a 5 micron filter).
3. OUTSIDE OONIKACTORS
All asbestos contracts for Alcoa facilities vill be vritten by Pittsburgh Procurement in close cooperation vith field procurement offices. Outside contractors shall be required to follov.the provisions of this standard, -as veil as all Federal, state, and local regulations vhere applicable for the removal of asbestos-containing materials.
3.1 Contractor Requirements
(a) The Construction Standard for Asbestos also requires that contractors/employers inform other employers on the vorksite of the nature of asbestos vork and the requirements pertaining to regulated areas.
(b) Other Hazard Communication issues relevant to contractors vorking in Alcoa facilities are covered in Engineering Standard 33.032.4 "Application of the OSHA Hazard Communication Standard for Outside Contractors".
(c) The contractor must supply Alcoa vith copies of all documents (notifications, air monitoring results, landfill approvals, etc.) generated by the contractor in accordance vith regulatory requirements.
(d) It is recommended that the contractor afford Alcoa the opportunity to reviev the landfill to be used for disposal of the material.
4683461113
nm tl
O* In
tn e v
i
tm f
ft l
b ftM
w
tu
le i
iltA
A m a ConW M T I A w Itp iO ^ C M Of COpitd,l
AHm>tftum ee>A(n>y o r
NM
t ih tn
A l
t
I
A
upt<lv
ih lH o ih tt
| II
ol
|vl it tl l
fi*H
w tiriovl pc*nx**on
Q
b*
t
n
n
o
t
ttf std
n v
i
lw
o*
rf
t,
tit
pt
a
ALCOA
Engineering Standard
Alcoa Safely and Industrial Hygiene
ASBESTOS REMOVAL STANDARD
18-18 1990 JUNE
PACE 16
l'!
HI!
|!;S
llsl
?*
(e) Some local asbestos regulations require third party oversight of contracted asbestos removal work. While asbestos contractors are responsible for conducting asbestos removal in compliance vith all applicable regulations, Alcoa location Industrial Hygienist should be given the opportunity to evaluate asbestos control during removal work as deemed necessary by their
professional judgement.
ifiJ tH*
4. REPERBKBS
|ll|
i|S|
ilfi
f5 % *5 =si*
Itfit:f
till
For further information, you may find the following references helpful:
1. Bureau of National Affairs 49 BSP-57, "BNA Special Report, Asbestos Abatement: Risks and Responsibilities", 1987. (800)372-1033
2. EPA Report Number 530-SW-85-007 "Asbestos Waste Management Guidance: Generation, Transport, Disposal", 1985 May.
3. EPA Report Number 560/5-85-024, "Guidance for Controlling Asbestos-Containing Materials in Buildings", 1985 June. EPA publications are available by contacting EPA at following toll free number: (800)424-9065.
4. I.H. Technical Bulletin No. 86-4. Available through Pittsburgh Safety and Industrial Hygiene Division.
Is:
5. 0SHA Safety & Health Standard 29 CFR 1926.58 - Asbestos for the Construction Industry.
6. U.S. EPA Regulations for Asbestos (CFR Title 40, Part 61, Subparts M.)
The following references are not an endorsement of vendors, but may be of assistance:
1. Vacuum Cleaners --
Euroclean 1186 Stratfield Road Fairfield, CT 06432 (203)336-5432
Hako Minuteman, Inc. Ill South Route 53 Addison, IL 60101 (312)627-6900
Nilfisk of America, Inc. 300 Technology Drive Malvern, PA 19355 (215)647-6420
4683461114
0
ALCOA
Engineering Standard
Alcoa Safely and Industrial Hygiene
o l lh # m e th o d s . p ro c e s s e s . p ro d u e ls o p ro c e d u re s d e s c rib e d o* re c o m rn e n d e d K tie
g u t u n t M l o* it p r t t o n it t io n i, e p * c il o u n p liiro n m a d e a t lo lh < u liM ir i o e iir c iiv e r
o'
ia i<om
\
> ^ Ah .>a
A lco a H o
K
n
>V
lh
( O' 0
o<h#
i
o
n'
|<
-e
ui
'O
p
C
M<
y iT
>*
r an
S lo
j o 'C
lo n
l
6 <oi0<^1
om >nnr1t
<0 n
oc
a
|l/% nd to tM
ci>QifCMig
o o l i<tindd
It
am)
ASBESTOS REMOVAL STANDARD
18.18 1990 JUNE
PAGE 17
2. Dust Collection/Exhaust System --
Abatement Technologies 3305 Breckenridge Blvd. Suite 118 Duluth, GA 30136 (404)925-2761
Asbestos Control Technology, Inc.
P.0. Box 183 North Pine Avenue Maple Shade, NJ 08052 (609)779-1300 (Hicro-Trap Asbestos Filtration System 2 models available. Capacity 600 - 1,700 CFM)
Global Consumer 1721 N. Highland Los Angeles, CA 90028 (312)426-6980
GPAC Inc. (Owns patent for negative pressure enclosures) P.0. Box 662 Maple Shade, NJ 08052 (609) 486-1555
Sentry Equipment 2676 Sunset Lane Allison Park, PA 15101 (800)255-3362 (outside PA)
3. Vetting Agents --
Aquatrols Corporation of America Pennsauken, NJ
BVE/Better Working Environment 380 Stevens Road, Suite 206 Solana Beach, CA 92075 1(800)654-6792 (Asbestos removal encapsulant BVE 5000
recommended for amosite)
EPA recommended vetting agent: 502 polyoxyethylene ester, 502 polyoxyethylene ether
Ethylene glycol is the vetting agent recommended for amosite asbestos.
Liquid dishvashing detergents such a liquid Joy make effective and economical vetting agents.
Rohm & Baas V. Philadelphia, PA
4683461115
n
,
I
s
ion*t
n iu t<
i
and h o le
b tld
w
lu
u lc i
iItn
itny Ol A m
Or COp**d.l
rtoanr or
C o**i<
ducw co
m o
yu
Il fn
tym tM n
Onl ih o
I A
i
lr
lol
OW
tohl ha
(K O II
ol
l i t !*>
I tw tl
n Iw h itl
w ith o u t p e rn w ttiO n
H in d lH
on wa0 o
r
fto l
ri, o
t*
pa
H
ALCOA
Engineering Standard
Alcoa Safety and Industrial
Hygiene
o l the methods, processes, products or procedures described or recommended he>e<n
puetenteet ot tepreeenielione, eaprete ot tmpiiied ete meoe to the utiMies or iie tii'w n e tt
tr.e
Mo
e>tcK>*ng A t then Atcee
tt op'04cr<n *nant,ei
el he
t* w
pwpo cipnt
i*
m
u t
eoy
pn>mM4 aoMh mmeedeiioo to*
gir*wtmg tiaodan) It mieeoed io be e tec e
n el
endt Ihtie
ASBESTOS REMOVAL STANDARD
18.18 1990 JUNE
PAGE 18
4. Disposable Protective Garments --
Dupont Type 14 "Tyvek"; available through area distributors.
Kimberly Clark Corp. 1400 Holcomb Bridge Road Roswell, GA 30076 (404)587-8114 (Disposable coveralls, hoods, towels and wipers)
HSA
P.0. Box 426 Pittsburgh, PA 15230 (412)273-5000 (Protective clothing, gloves and headwear)
5. Decontamination Units --
Aerospace America, Inc. 900 Truman Parkway Bay City, MI 48706 (517)684-2121 (Showers and water filtration)
Creative Innovations P.0. Box 3257 Vest Chester, PA 19381 (215)696-4952 (Decon Chamber, Spot Shot Shower, and Vater Filtration)
Evergreen Safety Systems, Inc. 14045 V. 66th Ave. P.0. Box 1207
Arvada, CO 80001 (303)422r2185
(Portable decontamination units)
Personal Protection, Inc. P.0. Box 737 Crystal Lake, IL 60014 (312)658-2321 (Contaminent and decontaminatin systems)
Pezanni & Reid Equipment Co. 3960 Vest Ford Street Detroit, MI 48216 (313)554-4000 (Decontamination trailers)
perl, or weed o n b e h e il o l others then Aluminum eompeny o* He euoeidUdeft,
be ftlutnetf en lequeti. tl theN net b t mpraducW * copied, in whole ot m
o t Aluminum Comppny M Am w tc* *d m w ti
without pormleilon.