Document 6wbBoQeqgNGVyGaVByVG4QxvR
*k
FRAZER FAINT COMFANY 2475 Hubbard Avenue Detroit, Michigan
SCHEDULE I
TRADE NAAS: CATEGOHY: COLOR! NUMBER: QUALITY:
10C Pure House Paint Exterior Trim & Trellis French Green
15 First
Pigment: $1% #4464 Chrome Green #G271 Chrome Green Barytes Clay Litharge Stearic Acid
Lbs.
378 55
474 937
15 7
Vehicled 49 Raw Linseed Oil
Heavy Bocied Linseed Cil Drier Turpentine Spar Varnish
:
1425 38
U3 38
182
Yield in Gal Ions
Unit Cost
Total Cost
7'e ight per
gallon finished product. laboratory
record 12.2 lbs.
.255 .26
^6.39 24.70
.017
8.06
.01 .085
9.37 1.28
.1675
1.17
Storage & handling cost
through loss - \%
140,97 1.41
.13 1S5.25
143
5.43
.07 a 0.01
.10 3.80
.10 18.20
Storage 4 Handling cost
through loss - 3S?
222.69 6.19
Calculated Yield
Manufacturing Loss Actual Yield
9732
905.9 7.6
2RS.3
Cost Analysisi Material cost per gallon Direct labor <;ost per gall-on Factory overhead pdr gallon Bulk cost per gallon Complete package cost per gallon, including filling charge Factory cost in package per gallon
PRICES
(a) To a company owned or controlled outlet (b) To an independent wholesaler (c) By com.any owned or controlled outletto retail customer (d) To an independent retailer (Dealer) (e) To other (industrial)
(Contractor)
971.26
1,24 ,12 .09
1.41 .19
1.60
None None 3.15 2.63 2.68 2.55
N 5121