Document 6wZ4eexVgXojVymmEDNeb3Mp1
r-
;/ PR&D WORK PLAN
Dell Haupt Landwchr Jessce Miller Williams Arnett Brown llovjard Wright Savage - G.O. DcGarmo - Queeny Richard - G.O. Hodges - G.O. Smith - G. 0.
COST:
Estimated per diem PRM) Coot Mandays Total Estimated Cost
$87 10 $870
EXPERIMENTAL: l. Run adsorption isotherms with the waste water at 10*C and ambient temperatures utilizing the following absorbents:
a. Carbon (different types) b. Attapulgus cloy c. Purocel d. Silica a. Molecular sieve f. Aroclor 5460
. ,
Target Completion Date 5/8/70
2. The data obtained in the above test v7ill dictate the direction of future work. Another work plan will be issued upon completion of this work plan.
SAFETY:
`
The waste water effluent from the Aroclor department contains mainly HC1 and Aroclor (i.c., in low concentrations). HC1 fumes and acid arc very corrosive to the skin and mucous tissue. Repeated exposure to Aroclor can cause a condition of chlorancc. Hence, any area exposed to the waste water should be washed thoroughly with copious amounts of water. If exposure is in a critical area as the eyes, consult a physician.
Xshmcnl Ransaw
/bs HONS 033855