MULTI-SECTOR GENERAL PERMIT NON-FILER INSPECTION CHECKLIST
Inspection Date(s): Time: Weather Conditions: Media/Program:
2/7/2023
Entry: 9:24 AM
Exit: 11:20 AM
Cloudy with temperatures approximately 28 F
Water - CWA 301, 402 - Industrial SW/NEC
Operator Name: Facility or Site Name: Permit ID or Tracking #:
SIC Code:
Facility Address: (city, state, zip code) Geographic Coordinates: Mailing address: (city, state, zip code) County: Regular Days/Hours of Operation: # of Employees at location: Size of Facility (in acres):
Receiving Water(s): Date facility est. @ location:
Dutchland, Inc. Dutchland, Inc. Unpermitted at the time of the inspection 3272 - Concrete Products, Except Block and Brick
The Facility representative was unsure of the Facility's SIC code. The SIC code was determined by referencing Dun & Bradstreet, a global business data and analytics company, and was inferred by the Inspector based on the industrial activities occurring at the time of the inspection. 160 PA-41 Gap, PA 17527 39.9734, -76.0079 160 PA-41 Gap, PA 17527 Lancaster Monday - Friday, 8:00 AM - 5:00 PM Approximately 140 Approximately 22 acres according to the Facility representative Unnamed Tributary to Williams Run Business founded in 1969, exact original Facility startup was unknown by the Facility representative
Onsite Representatives: Name: Darrell Martin
Authorized Official:
Name: Darrell Martin
Title: Facility Manager Email: dmartin@dutchlandinc.com Contacted? Yes No Title: Facilities Manager Email: dmartin@dutchlandinc.com
Phone: (717) 442-8282 Phone: (717) 442-8282
Inspector(s): Taylor Fontaine (PG Environmental) Ivy Koberlein (U.S. EPA Headquarters) Monica Crosby (U.S. EPA Region III) Inspection Report Author:
Name: Taylor Fontaine
Title: Inspector Title: Inspector Title: Inspector
Signature:
Phone: (703) 956-1977 Phone: (202) 564-2549 Phone: (410) 305-2930
Date: 3/30/2023
Page 1 of 6
Supervisor Review: Name: Jessica Duffy
MULTI-SECTOR GENERAL PERMIT NON-FILER INSPECTION CHECKLIST Dutchland, Inc.
Stormwater Inspection Date: February 7, 2023
Signature: Digitally signed by JESSICA
JESSICA DUFFY DUFFY Date: 2023.04.18 13:40:13 -04'00'
Date4: /18/23
SECTION I - INTRODUCTION
Purpose of the Inspection
The purpose of the inspection was to determine compliance with the industrial stormwater requirements under 301 and 402(p) of the CWA and its implementing regulations found at 40 CFR Part 122.26. The inspection was unannounced and consisted of interviewing facility representatives, recording field observations, and taking photographs to document site conditions throughout the Facility at the time of the inspection.
Opening Conference
1) On February 7, 2023, U.S. Environmental Protection Agency (EPA) contractor, PG Environmental, conducted an unpermitted industrial facility stormwater inspection at Dutchland, Inc. located in Gap, Pennsylvania (Facility). Taylor Fontaine of PG Environmental, Ivy Koberlein of EPA Headquarters, and Monica Crosby of EPA Region III (EPA Inspection Team) met with the Facility representative. Taylor Fontaine displayed his Clean Water Act (CWA) credentials, and the EPA Inspection Team conducted an opening conference. The EPA Inspection Team explained the purpose of the inspection was to document the facility's industrial activity and any obligations to apply for a National Pollutant Discharge Elimination System (NPDES) Permit (Permit). At the time of the inspection, the Facility did not have coverage under the Permit.
Weather conditions at the time of the inspection were cloudy with temperatures of approximately 28 F. There was no precipitation during the inspection. According to precipitation data from the National Oceanic and Atmospheric Administration (NOAA)1, the Gap, Pennsylvania area received no rain the day before the inspection.
2) Credentials presented to: Darrell Martin - Facility Manager
3) Facility acknowledged receiving previous outreach materials or correspondence on Permit requirements? Yes No
4) Facility has been individually notified by permit authority or EPA that it is subject to stormwater requirements? Yes No
1Source: NOAA National Climatic Data Center (http://www.ncdc.noaa.gov/).
Page 2 of 7
MULTI-SECTOR GENERAL PERMIT NON-FILER INSPECTION CHECKLIST Dutchland, Inc.
Stormwater Inspection Date: February 7, 2023
FACILITY'S OPERATION & PRODUCT DESCRIPTION
The Facility comprises approximately twenty-two (22) acres located on Highway PA-41 in the City of Gap, Pennsylvania. The Facility is bordered by private land to the north, forested land to the west and south, and Highway PA-41 to the east. According to the Facility representative, the Facility manufactures precast concrete tanks and specialized concrete products, mostly for the water and wastewater industries. Manufacturing operations were observed to occur inside/undercover while other industrial operations (e.g., loading/unloading, concrete washout, and storage of rebar, forms, and admixtures) occur outside and are exposed to stormwater. The Facility's batch plant was not in operation at the time of the inspection, and they were receiving concrete from another supplier. The Facility includes one (1) office building, three (3) manufacturing/industrial buildings, several buildings for material storage, one (1) vehicle maintenance shop, and uncovered storage areas. Aggregate and manufacturing materials (e.g., polyvinyl chloride (PVC) piping and steel rebar) are stored in the north, central, and west portions of the Facility, while the manufacturing operations occur in the south portion of the Facility.
Other industrial facilities owned/operated by same business entity? Yes No
SECTION II - OBSERVATIONS
Pollutant Sources
Loading/Unloading Operations
Industrial Manufacturing/ Processing Operations
Industrial Machinery & Equipment Storage
Storage of Industrial Materials or Products
SITE EVALUATION
Observations
The Facility has one (1) entrance off Highway PA-41 where trucks and forklifts load and unload products for distribution and sale. The Facility representative stated that the Facility stores and maintains semi-trucks for loading and unloading and has over forty (40) vehicles onsite.
According to the Facility representative, Facility industrial operations (concrete manufacturing) occur primarily indoors and are not exposed to stormwater. Outdoor operations include materials storage, and loading/unloading (refer to Appendix B, Photographs DSCN5079, DSCN5091, DSCN5118, DSCN5138, and DSCN5148).
The EPA Inspection Team observed machinery and industrial equipment to be housed inside (refer to Appendix B, Photographs DSCN5127 and DSCN5128).
The EPA Inspection Team observed covered and uncovered storage areas for industrial materials (e.g., wood, steel rebar, metal casing), (refer to Appendix B, Photographs DSCN5079, DSCN5091, DSCN5118,DSCN5138, DSCN5147, and DSCN5148).
Page 3 of 7
MULTI-SECTOR GENERAL PERMIT NON-FILER INSPECTION CHECKLIST Dutchland, Inc.
Stormwater Inspection Date: February 7, 2023
Liquid Storage (e.g., Tanks, Liquid Storage Drums)
SITE EVALUATION
The EPA Inspection Team observed the following liquid storage tanks/drums at the Facility:
One (1) (275-gallon) tote and three (3) 1-gallon jugs of accelerating admixture located in the middle of the Facility (refer to Appendix B, Photograph DSCN5125 & DSCN5126) without cover or secondary containment.
Approximately six (6) 55-gallon drums of waste oil/coolant and gear fluid located inside the vehicle maintenance shop in the northern portion of the Facility (refer to Appendix B, Photograph DSCN5162).
A 750-gallon tank containing diesel for an onsite generator located in the southern portion of the Facility (refer to Appendix B, Photograph DSCN5185). There was no secondary containment around the tank; however, the EPA Inspection Team did not evaluate whether the tank was double walled. There was no spill kit evident in the vicinity of the tank.
Waste Storage/Disposal Areas (solid and/or hazardous)
The EPA Inspection Team observed three (3) dumpsters with lids used for general waste located in the middle of the Facility (refer to Appendix B, Photograph DSCN5137), and one (1) location used for concrete waste contained by concrete blocks on three sides in the western portion of the Facility (refer to Appendix B, Photograph DSCN5144).
The EPA Inspection Team also observed a three (3)-tiered earthen concrete washout areas in the north area of the Facility (refer to Appendix B, Photographs DSCN5152, DSCN5153, and DSCN5154).
Waste Treatment Facilities (e.g., Pretreatment Systems)
Fueling Stations/Equipment Maintenance Areas & Cleaning Areas
As referenced above, the Facility had an earthern concrete washout area that contained three (3) setting bays in sequence, managing runoff through a tiered system. (refer to Appendix B, Photographs DSCN5153 and DSCN5154). The Facility representative explained that once the lowest tier fills, the Facility will dig out the washout materials and dispose offsite. There was a truck utilizing the washout area during the inspection. The EPA Inspection Team observed the following fuel storage tanks located outside in the middle of the Facility. The tanks were double-walled and uncovered (refer to Appendix B, Photograph DSCN5140).
500-gallon tank of kerosene; 500-gallon tank of diesel fuel; 300-gallon tank of gasoline
These three (3) fuels storage tanks, in conjunction with the aforementioned six (6) 55-gallon drums containing waste oil/coolant, and the 750-gallon tote containing diesel equate to 2,380 total gallons for petroleum storage. He Facility does not have a management plan specifically designed for the stored liquid being discussed.
Page 4 of 7
MULTI-SECTOR GENERAL PERMIT NON-FILER INSPECTION CHECKLIST Dutchland, Inc.
Stormwater Inspection Date: February 7, 2023
SITE EVALUATION
Sediment & Erosion Controls
There were no sediment and erosion controls present onsite at the time of the Inspection.
Spills/Leaks Handling
The EPA Inspection Team observed spill cleanup materials located indoors. This included quick dry absorbent material and spill pads. However, the spill cleanup materials were not located adjacent to the fuel tanks listed above.
Outside Shelters
Temporary (Date Established___________________) Permanent None observed
Evidence of non-stormwater
sources/discharges (allowable if permitted
None observed.
under Permit)?
Evidence of process wastewater sources/discharges?
The EPA Inspection Team did not observe evidence of process wastewater sources/discharges onsite at the time of the inspection.
OUTFALL, STORMWATER DISCHARGE & RECEIVING WATER OBSERVATIONS
The EPA Inspection Team observed the following potential discharge locations that all convey stormwater to an unnamed tributary to Williams Run:
Number and description of each potential Stormwater Discharge Point from the Facility
A PVC drainpipe, connected to at least three (3) catch basins located in the southeast portion of the Facility, that leads or connects to the adjacent woods (refer to Appendix B, Photograph DSCN5074).
Another PVC drainpipe, leads or connects to the south portion of the Facility (refer to Appendix B, Photograph DSCN5084). The Facility Representative did not know the source of stormwater that discharges through this pipe.
A drainage channel leads or is connected to a drainage swale in the southwest corner of the Facility leads to an adjacent drainage ditch (refer to Appendix B, Photographs DSCN5092, DSCN5097, DSCN5099, and DSCN5103). This drainage ditch connects to an unnamed tributary to Williams Run located to the south of the Facility.
There are several areas that appear to receive discharges (overland flow) along the west fence line (refer to Appendix B, Photographs DSCN5100 and DSCN5101).
Page 5 of 7
MULTI-SECTOR GENERAL PERMIT NON-FILER INSPECTION CHECKLIST Dutchland, Inc.
Stormwater Inspection Date: February 7, 2023
Evidence of pollutants migrating offsite (stains, deposits, ponding) at discharge points, into Receiving Waters or in MS4
Evidence of Nonstormwater Discharges leaving site (authorized or unauthorized)
SITE EVALUATION Catch basins located in areas of outdoor industrial activity, appear to
be connected to several headwalls/pipes that are located along the west perimeter of the facility (refer to Appendix B, Photographs DSCN5112 and DSCN5145).
The EPA Inspection Team observed several locations along the west fence line over the course of approximately fifty (50) feet where sediment and debris had migrated offsite through the chain link fence and towards an adjacent unnamed tributary to Williams Run (refer to Appendix B, Photographs DSCN5100 and DSCN5101).
None observed.
The EPA Inspection Team observed that a PVC pipe in the southeast portion of the Facility appears to be connected to the adjacent woods (refer to Appendix B, Photographs DSCN5074 and DSCN5075).
Description of general gradients/slopes onsite, all apparent discharge points, and discharge pathway from Facility to Receiving Water or MS4 (storm drains, channel, swale, ditches, driveway, pipes, & etc.)
Ground contours in in the middle and south portions of the Facility appear to be graded to a drainage swale, which connects to a drainage ditch. The drainage ditch connects with an unnamed tributary of Williams Run, located to the south of the Facility (refer to Appendix B, Photographs DSCN5083, DSCN5088, DSCN5089, and DSCN5090).
Ground contours along the west perimeter of the Facility appear to be graded towards the west fence line, which is adjacent to an unnamed tributary of Williams Run (refer to Appendix B, Photographs DSCN5091 through DSCN5096).
Ground contours in the north portion of the Facility appears to be graded to a stormwater basin located in the northwestern corner of the Facility. The Facility representative was unsure if this stormwater basin was connected to the local sewer system (refer to Appendix B, Photographs DSCN5149 and DSCN5150).
SECTION III - AREAS OF CONCERN
1) The EPA Inspection Team observed concrete manufacturing at the Facility, an industrial activity classified under SIC Code 3272 - Concrete Products, Except Block and Brick. a. Businesses classified under SIC Code 3272 are regulated under 40 C.F.R. 122.26 for stormwater discharges associated with industrial activity.
Page 6 of 7
MULTI-SECTOR GENERAL PERMIT NON-FILER INSPECTION CHECKLIST Dutchland, Inc.
Stormwater Inspection Date: February 7, 2023
b. Concrete washout, steel rebar materials storage, and loading/unloading operations occur outside and are exposed to stormwater (refer to Appendix B, Photographs DSCN5153 and DSCN5154).
c. The Facility did not have coverage under a Permit at the time of the inspection.
2) The EPA Inspection Team observed what appeared to be stormwater discharge locations: a. A polyvinyl chloride (PVC) drainpipe connected to at least three (3) catch basins located in the southeast portion of the Facility connected to the adjacent woods (refer to Appendix B, Photograph DSCN5074). a. An additional PVC drainpipe that ends along the south portion of the Facility (refer to Appendix B, Photograph DSCN5084). b. A drainage channel connected to a drainage swale that is connected to an adjacent, unnamed tributary of Williams Run in the southwest corner of the Facility. (refer to Appendix B, Photographs DSCN5092, DSCN5097, DSCN5099, and DSCN5103). c. Several areas of along the western fence line (refer to Appendix B, Photographs DSCN5100 and DSCN5101). d. Catch basins located in areas of outdoor industrial activity, appear to be connected to several headwalls/pipes that are located along the west perimeter of the facility (refer to Appendix B, Photographs DSCN5112 and DSCN5145). These catch basins did not have any observable inlet protection best management practices (BMPs).
3) The EPA Inspection Team observed several locations along the west fence line where sediment and debris had migrated through the chain link fence and towards an adjacent drainage ditch that connects to an unnamed tributary of Williams Run (refer to Appendix B, Photographs DSCN5100 and DSCN5101).
SECTION IV - CLOSING CONFERENCE
After the site walk, the EPA Inspection Team met with the Facility Manager from Dutchland, Inc. for a closing conference and shared preliminary observations. The EPA Inspection Team reiterated that all preliminary observations discussed were not compliance determinations. Any and all preliminary observations shared were subject to further investigation by the EPA Inspection Team. Additional observations may be contained in this inspection report that were not identified at the time of the closing conference.
The inspection concluded at approximately 11:20 AM (EST).
SECTION V - LIST OF APPENDICES
Appendix A - Aerial Map Appendix B - Photograph Log
Page 7 of 7
Appendix A. Aerial Map
Clean Water Act Inspection Dutchland, Inc.
Inspection Date: February 7, 2023
Appendix A. Aerial Map Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 1 of 3
Dutchland, Inc. Inspection Date: February 7, 2023
Unnamed tributary to Williams Run
Concrete washout
Legend
Flow Direction
N
Water Body
Facility Boundary
Outfall Point
Figure 1. Aerial Image of Dutchland, Inc. from Google Maps (dated 2023).
Appendix A. Aerial Map Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 2 of 3
Dutchland, Inc. Inspection Date: February 7, 2023
Figure 2. Google Earth aerial view of the Facility (dated August 12, 2022). Note the red and blue lines depicting surface waterbodies, of which the red line is an unnamed tributary to Williams Run. It is estimated that this drainage ditch is connected to the unnamed tributary to Williams Run.
Appendix A. Aerial Map Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 3 of 3
Dutchland, Inc. Inspection Date: February 7, 2023
Appendix B. Photograph Log
Clean Water Act Inspection Dutchland, Inc.
Inspection Date: February 7, 2023
* Disclaimer: All photos were taken on 2/7/2023. Some photographs do not contain GPS coordinates.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 1 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Overview Map
Photograph Location
* Note - The two (2) identified "dots" located in the far south and west of the Facility are not accurate and were not visited. All other "dots" are accurate and were visited by the EPA Inspection Team.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 2 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Catch basin in the Facility parking lot that eventually discharges stormwater offsite. This area receives stormwater sheet flow from the parking lot.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 3 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Another catch basin in the Facility parking lot that eventually discharges stormwater offsite.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 4 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Estimated direction of stormwater flow from the parking lot towards a catch basin. View looking east.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 5 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Catch basin, as described in Photograph DSCN5071.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 6 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description View of a polyvinyl chloride (PVC) pipe/vent sticking out of the ground. The Facility representative was unsure if this was connected to the catch basins in the previous photographs.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 7 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description
Stormwater outfall that, according to the Facility representative, discharges stormwater collected from the catch basins in the employee parking lot in Photographs DSCN5069, DSCN5070, and DSCN5072.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 8 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Closer view of the outfall pipe shown in Photograph DSCN5074.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 9 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Southwest portion of the Facility where loading/unloading operations take place.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 10 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Facility-owned vehicles were parked outside between two Facility manufacturing buildings.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 11 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Catch basin that connects to a drainage swale to the south, prior to discharging offsite.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 12 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Outdoor steel casings materials storage.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 13 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description
Headwall and outlet structure that conveys stormwater from onsite catch basins into a drainage swale along the Facility's south boundary. Stormwater is conveyed from upgradient catch basins that are in the loading/unloading area.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 14 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description
Additional view of the headwall and outlet structure shown in Photograph DSCN5080. There were no visible pollutants.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 15 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description
Additional view of the headwall and outlet structure as shown in Photographs DSCN5080 and DSCN5081.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 16 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description
Two (2) additional PCV pipes that convey stormwater from the adjacent catch basins that convey stormwater from areas with loading/unloading activities and materials storage. One pipe conveys stormwater directly into the observed drainage swale. The other conveys stormwater into the adjacent woods.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 17 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Closer view of the outlet pipe as shown in Photograph DSCN5083.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 18 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Truck scale in the southwest corner of the Facility.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 19 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Closer view of the truck scale shown in Photograph DSCN5085.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 20 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Manufacturing buildings in the southwest portion of the Facility.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 21 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Outlet pipe leading from upgradient catch basins.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 22 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Upgradient view of the drainage swale along the Facility's south boundary. Note the estimated stormwater flow direction. There appeared to be dark discoloration in the swale.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 23 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Downgradient view of the drainage swale along the Facility's south boundary.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 24 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description
Upgradient view of steel rebar materials stored outdoors along the Facility's west fence line. Note the estimated stormwater flow direction.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 25 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description View of the Facility's southwest corner fence where the drainage swale discharges offsite into a drainage ditch. The drainage ditch connects to an unnamed tributary to Williams Run.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 26 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description
Upgradient view of steel rebar materials stored outdoors along the Facility's west fence line. Note the estimated stormwater flow direction.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 27 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Sediment and debris near the Facility's southwest corner fence line and offsite towards the drainage ditch. The drainage ditch connects to an unnamed tributary to Williams Run.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 28 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description
Upgradient view of outdoor steel rebar materials storage along the Facility's west fence line. Note the estimated stormwater flow direction.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 29 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description
Upgradient view of the drainage swale along the Facility's south boundary. A head cut was forming at the swale's western end.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 30 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Drainage ditch
Description
Channelized area at the southwest corner of the Facility adjacent to the drainage ditch that conveys Facility storm water to an unnamed tributary to Williams Run. Note the dotted lines showing the estimated flow path from the Facility towards the drainage ditch located offsite.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 31 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description
Channelized area at the southwest corner of the Facility adjacent to the drainage ditch that conveys Facility storm water to an unnamed tributary to Williams Run. Note the dotted lines showing the estimated flow path from the Facility towards the drainage ditch located offsite.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 32 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description
Channelized area at the southwest corner of the Facility adjacent to the drainage ditch that conveys Facility storm water to an unnamed tributary to Williams Run. Note the dotted lines showing the estimated flow path from the Facility towards the drainage ditch located offsite.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 33 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Sediment and debris
Description Sediment and debris near the Facility's southwest corner fence line and offsite towards the drainage ditch that conveys Facility storm water to an unnamed tributary to Williams Run.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 34 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description View of the estimated flow path towards the Facility's southwest corner. Rill erosion was observed in this area.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 35 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description
Upgradient view of materials stored outdoors in the southwest corner of the Facility. Note the estimated stormwater flow path.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 36 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Drainage ditch
Description View of the southwest corner of the Facility. Note the sediment and materials (e.g., rebar) near the fence line. Also note the adjacent drainage ditch and the eroded drainage swale.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 37 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description
Downgradient view of steel rebar materials stored outdoors along the Facility's west fence line. Note the estimated stormwater flow direction.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 38 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description View of the observed drainage ditch, adjacent to the Facility along the west boundary.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 39 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description View of the Facility's west boundary fence line. Note the drainage ditch offsite to the west.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 40 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description View of loading/unloading areas south of one of the Facility's manufacturing buildings.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 41 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Sediment and debris
Description View of evidence of previous flow by the Facility's west boundary fence line.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 42 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Drainage ditch adjacent to the Facility's west boundary fence line.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 43 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description View of a metal materials storage area in the east area of the Facility. Note some of the materials are stored outside the overhead cover.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 44 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Downgradient view of the estimated stormwater flow path by the Facility's west boundary fence line.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 45 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Headwall outlet structure and drainage ditch. This structure conveys stormwater from onsite catch basins in Photograph DSCN5120 and DSCN5121.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 46 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Headwall outlet structure and drainage ditch shown in Photograph DSCN5112.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 47 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Closer view of the headwall outlet structure and drainage ditch shown in Photographs DSCN5112 and DSCN5113.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 48 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Observed estimated stormwater flow path from the outdoor materials storage towards the west boundary fence line and drainage ditch.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 49 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description
Estimated stormwater flow path from the outdoor materials storage are shown in Photograph DSCN5115 towards the west boundary fence line and drainage ditch. Materials stored outdoors in this area were on blocks to minimize contact with surface runoff.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 50 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Observed estimated stormwater flow path from the outdoor materials storage towards the Facility's west boundary fence line and drainage ditch.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 51 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Outdoor uncovered steel and steel rebar materials storage area in the west portion of the Facility.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 52 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description
Catch basin, that according to the Facility representative, convey stormwater towards the headwall shown in Photograph DSCN5114. There was no observed inlet protection. Industrial activities in this area included materials storage and loading/unloading activities.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 53 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Additional view of the catch basin shown in Photograph DSCN5120.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 54 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description
An additional catch basin, different from the one in Photograph DSCN5120, that according to the Facility representative, conveys stormwater towards the headwall as shown in Photograph DSCN5114.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 55 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Five (5) penetron admix buckets stored outside without cover or containment. Penetron is added during concrete batching to protect the concrete against water penetration.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 56 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Area between two of the manufacturing buildings. It was not clear what was contained in the silos.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 57 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Catch basin upgradient to those in Photographs DSCN5120 and DSCN5121.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 58 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Approximate 275-gallon tote of accelerating admixture being stored outside without cover or containment. Note the staining on the adjacent ground.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 59 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Closer view of the approximate 275-gallon tote of accelerating admixture (as shown in Photograph DSCN5125) being stored outside without cover or containment.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 60 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Inside one of the Facility's manufacturing buildings.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 61 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Inside one of the Facility's manufacturing buildings.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 62 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description
Wash area with a drain inside one of the manufacturing buildings. The Facility representative stated the drain is connected to an underground storage basin that is pumped out regularly by a contractor.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 63 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Wash area inside one of the manufacturing buildings as shown in Photograph DSCN5129.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 64 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Catch basin that conveys stormwater to an adjacent drainage swale.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 65 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Catch basin shown in Photograph DSCN5131.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 66 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Headwall outlet structure that conveys stormwater from the catch basin shown in Photograph DSCN5132 to the observed drainage swale.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 67 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Drainage swale in the middle area of the Facility.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 68 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description
Headwall outlet structure to the drainage swale shown in Photograph DSCN5133. The black corrugated plastic pipe is connected to the adjacent building's roof drain.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 69 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description
Closer view of the headwall outlet structure to the drainage swale shown in Photographs DSCN5133 and DSCN5135.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 70 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Three (3) covered trash dumpsters in the middle area of the Facility.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 71 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Wood and unknown metal materials stored outside in the middle area of the Facility.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 72 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Continuation of the onsite drainage swale shown in Photograph DSCN5134.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 73 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description
Three (3) double-walled aboveground storage tanks (ASTs) with volumes of approximately 500 gallons of kerosene, 500 gallons of diesel, and 300 gallons of gasoline. There was no spill kit observed in the area.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 74 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Closer view of the ASTs shown in Photograph DSCN5140.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 75 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description View of the Facility's conveyer that transfers well water from a sump for manufacturing.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 76 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Additional view of the Facility's conveyer shown in Photograph DSCN5142.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 77 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Concrete waste storage area in the west area of the Facility.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 78 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description
Stormwater flow path containing debris and sediment towards the Facility's west boundary fence line and drainage ditch. Though unconfirmed, it appeared that et concrete had once been washed out in this area and left to dry.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 79 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Closer view of the headwall shown in Photograph DSCN5146.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 80 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description
Concrete forms and a dumpster stored outside in the west area of the Facility. Forms were stacked on pallets to minimize contact with stormwater.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 81 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description PVC pipe materials stored outside in the west area of the Facility.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 82 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description
Facility's French drain system to capture stormwater runoff from the adjacent areas. The Facility representative did not know if this connected to the local sewer system.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 83 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Facility's French drain system to capture stormwater runoff from the adjacent areas.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 84 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Used, empty 55-gallon drums stored on pallets in the west area of the Facility.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 85 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Three (3)-tiered earthen concrete washout area.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 86 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Three (3)-tiered earthen concrete washout area.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 87 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description
Three (3)-tiered earthen concrete washout area. Once the lowest tier fills, the Facility will dig out the washout materials and dispose offsite.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 88 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Headwall outlet structure in the north area of the Facility. The Facility representative was unsure where stormwater was conveyed from.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 89 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Catch basin in the north area of the Facility. It was unclear where this connected.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 90 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description PVC pipe that had an unknown connection.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 91 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Floor drains inside the fleet maintenance shop.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 92 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Waste oil containers being stored on top of the floor drains in fleet maintenance shop.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 93 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Waste oil containers being stored on top of the floor drains in fleet maintenance shop.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 94 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Materials being stored on top of the floor drains in fleet maintenance shop.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 95 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Waste oil containers being stored on top of the floor drains in the fleet maintenance shop.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 96 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Waste oil containers being stored on top of the floor drains in fleet maintenance shop.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 97 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Waste oil and coolant containers stored on top of the floor drains in fleet maintenance shop without secondary containment.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 98 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Unlabeled and unidentified canister placed over a floor drain in the fleet maintenance shop.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 99 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Waste oil and coolant containers stored on top of the floor drains in fleet maintenance shop.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 100 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Small petroleum stains on the floor in fleet maintenance shop.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 101 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description
Additional floor drain in fleet maintenance shop. Note the chemical tote with no secondary containment.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 102 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Infiltration area adjacent to the fleet maintenance shop.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 103 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description
Catch basin in the north area of the Facility. It was unclear where the catch basin connects or discharges to.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 104 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Storm sewer manhole in the north area of the Facility.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 105 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description
Detention basin in the northwest area of the Facility that receives stormwater runoff from the adjacent building roofs and pervious areas.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 106 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description
Headwall inlet structure in the detention basin shown in Photograph DSCN5172. Note the sparse riprap.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 107 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Inside the concrete riser structure located in the detention basin shown in Photograph DSCN5172.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 108 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Concrete riser structure located in the detention basin shown in Photograph DSCN5174.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 109 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Headwall outlet structure that conveys stormwater runoff from the adjacent building roofs and areas. This area receives stormwater overflow through the concrete riser from the upgradient basin.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 110 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Unnamed tributary to Williams Run
Description
Unnamed tributary to Williams Run adjacent to the northwest part of the Facility. Excess stormwater runoff from the adjacent basin could be conveyed towards the unnamed tributary to Williams Run. It was unconfirmed if this is connected to the drainage ditch observed along the west Facility perimeter (refer to Photographs DSCN5092, DSCN5097, and DSCN5105).
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 111 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Unnamed tributary to Williams Run adjacent to the Facility shown in Photograph DSCN5177.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 112 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description
Upgradient view of the detention basin in the northwest area of the Facility adjacent to the unnamed tributary to Williams Run.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 113 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Unnamed tributary to Williams Run adjacent to the Facility, shown in Photograph DSCN5177.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 114 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Upgradient view of the headwall outlet structures from the detention basin in the northwest area of the Facility adjacent to the unnamed tributary to Williams Run.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 115 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Unnamed tributary to Williams Run adjacent to the Facility, shown in Photograph DSCN5177.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 116 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Truck using the concrete washout in the northwest area of the Facility during the inspection.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 117 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description
Floor drain inside a manufacturing building. The Facility representative was unsure where the drain discharged to.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 118 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine
Description Diesel tank for an onsite generator (unknown quantity). It was unclear if the diesel tank was double walled. Note the lack of secondary containment or spill kit nearby.
Appendix B. Photograph Log Multi-Sector General Permit Non-Filer Inspection Dutchland, Inc.
Page 119 of 119
Dutchland, Inc. Inspection Date: February 7, 2023 Photographs taken by Taylor Fontaine