E. E. Stewart, W. G. Krumtorlch Plant August 28, 1974 ' PCB CONTROL
TO Mr. Bill Engmac Mr .'"Ar\_LfcAey^
Our present goals and timing with regard to PCD control In 1974 are as follows:
Department losses Dept. 246 Incinerator
<l#/day
Other plant losses
0#/day
EDC
1/1/75
You are essentially on target for control of depart ment losses. I do not know status of "other plant losses" exclusive of background.
Paul Helsler will Issue a status memo related to the overall PCB plans as outlined in the memo Helsler/ Bratsch, 2/26/74.
As I mentioned before, we at WGK will probably be subject to visits from our customers and the EPA. Although we are below lf/day known losses, we may be able to Improve a little bit more. Perhaps a renewed departmental program to further control losses will not only permit a further reduction. It will also bettar prepare the department for any surprise visits from our customers on the EPA.
I can think of a few Items In no particular order of lmpoitance.
1. Be sure all pumps (except water) have drip pans under them and drain pipe to container.
2. Upgrade containers for collecting leaks from drip pans, drain spots, sampling lines, etc. Some con tainers are colored and discolored plastic, buckets, coffee cans, etc. If they were all uniform it would look bettar.
MONS 029510
Messrs. Bill Engaan/Art Leiay PCB CONTROL
Page 2 8/28/7* VGK
3. You may vast to copy Ideas.froa the attached "Pyranol Handling Instructions." I do not know the degree to which the Instructions were followed, hut I obtained this at G.E.'s Pittsfield plant.
4. Extra effort by aaintenance and department to repair steaa and condensate leaks. (He have been telling our customers how "bone dry" we are able to keep our facilities.)
5. Upgrade sampling station. Box needs painted or re placed. Chart Is dated 7/23. Get Instruments measuring and recording what they were designed to do.
8. Review again with all operators the reasons for and why we must contain and control PCB's within the department. This Is especially true If you have new operators. All operators should have correct answers and attitude If questioned by visitors.
. Any "gimmick" you can think of to get the operators more involved and concerned will be of value. A SPOT THE LOSS CONTEST, or TAC THE LEAK or etc., etc., etc.
7. Does the PCB detector Instrument In the north settling baaln function properly so as to alarm in the event of a major spill in this area?
8. Are the off-gas valves on the 236 high line functioning properly to prevent drowning 246 off-gas at 2367 Are proper Instrument signals being recorded In 2*6 control room from 236 high line?
9. Large tank west of fl mix tank looks like It either overflowed slightly, or there la a slight drip at tank vent or gage board opening. In any event, PCB's should be wiped froa side of tank. The ground area would Indicate there was no loss to the sewer, but the tank straight side looks unsightly and could detract from all the good effort that has been put forth to contain and* control departmental losses.
HONS 029511
Messrs. Bill Engaan/Art Lelay PCB CONTROL
Page 3 8/28/74 WGK
10. Gary Johnson, Virgil Brawley and Ton Carrico can probably
think of nany other ways to Improve Just a little bit
aore.
*
These are ay thoughts. Will assist wherever you need help.
E. E. Stewart
/tn