Document 6w4a7pNKGLepJv54ZRVge3w99

Monsanto FROM iNAMt & L W. C. Engman - WGK 7- &~C C/ 2 ' DATE SUBJECT * REFERENCE TO January 5* 1971 STATUS OF PROGRAM FOR AROCLOR POLLUTION CONTROL Mr. J. R. Savage - G.O Messrs. G. L. Bratsch C. F. Buckley/to. R. Foresman B. W. Corlewu^^ P. E. Heisler P. B. Hodges - G.O. D. W. Jackson W. A. Krull R. M. McCutchan F. McDonald - Newport A. L. Rasmussen W. R. Richard - G.O. J. Corder - Anniston B. Young This is the January 1, 1971 status of PCB pollution control program. 1/7 I. PCB Levels in Sewer: A. Aroclor losses from the Aroclor Department averaged about 0.6 lbs/day and ranged from about 0.2 to 1.4 lbs/day. Losses from the treatment plant for the period 11/17-12/17 averaged 54 lbs/day (177 ppb). Range for 7 samples was 9 to 55 lbs/day (47-280 ppb). Samples taken during the 5 day neutralization test (12/15-12/17) are not included. Average for this period was 27 lbs/day. B. Program to monitor the various plant sewers was begun the last week of December. Plans are to composite samples twice per week for analysis. . C. Sewer samples were taken from the effluents of the other industrial plants. These included: Midwest Rubber American Zinc Cerro Copper & Brass Mobil Oil Dead Creek Village 9 PPb 6 ppb 9 ppb 54 ppb 18 ppb 2110 ppb The only significant quantity is the PCB's from the Village sewer. This amounts to about 2 to 5 lbs/day. Probable source is Aroclor trailer washes at Rogers Terminal. II. Projects to Reduce Sewered PCB's from Aroclor Department A. Design package for project to pave and trench loading areas is 95$ complete and will be Issued by 1/15/71. DSW 297283 STLCOPCB4067192 Mr. J. R. Savage - G.O. Status of Program for Aroclor Pollution Control Page 2 1/5/71 WGK III. Program to Eliminate Sewered PCB's from Using Departments Jerry Bratsch has requested by memo that all General Superin tendents proceed at once to change out all therminol units to non-Aroclor heat transfer fluids. IV. Removal of Soluble PCB's from Sewer Stream (Reach 10 ppb) A 3 day test was run l'2/l5-12/l7 in which the entire plant effluent was neutralized with lime. Results indicated no change in the average level of PCB's in either the influent or the effluent at the treatment plant at the 90$ confidence level. At this point, it appears possible to reach the goal of 10 ppb without secondary or tertiary treatment by doing the following: 1. Change out of all plant therminol units to nonAroclor fluids. 2. Continue control of losses at the Aroclor Depart ment at less than 1.5 lbs/day. 3. Clean all contaminated sewers and sewer boxes. 4. Monitor and control Rogers Terminal. V. PCB Levels in the Atmosphere A project premise and estimate for $6,000 were prepared to replace the nitrogen purge with a nitrogen blanket at the mix tanks and to reroute the chlorinator rupture disc lines to the pad. A sampling station will be shared with the chlorine department to monitor PCB content of air downwind from the Aroclor Department. Samples will be taken every other week starting the week of 1/11/71. VI. PCB Rework Project (Est. 2095) Project package Is essentially complete and will be issued the week of 1/4/71. . /br Technical Services Dept, . DSW 297284 STLCOPCB4067193