Document 6w1k3em6OzGyDdXkvEDJzGM0m

Region 6 Enforcement and Compliance Assurance Division INSPECTION REPORT Inspection Date(s): Media: Regulatory Program(s) 10/08/2019 Water Brine - CWA Company Name: Facility Name: Facility Physical Location: (city, state, zip code) Mailing address: (city, state, zip code) County/Parish: Facility Contact: Chris Pillers Mattie Evans Tank Battery 36.311187, -95.996225 Sperry, Oklahoma 633 S. Javine St. Skiatook, Oklahoma 74070 Tulsa County Chris Pillers 918-698-2337 FRS Number: Identification/Permit Number: Media Number: NAICS: SIC: N/A N/A N/A 21111 1311 Personnel participating in inspection: Kent W. Sanborn 6ECDWE Environmental Engineer (918) 557 - 1615 EPA Lead Inspector Signature/Date Supervisor Signature/Date Kent W. Sanborn Digitally signed by Kent W. Sanborn DN: cn=Kent W. Sanborn, o, ou=6EN-WR, email=sanborn.kent@epa.gov, c=US Date: 2019.11.18 14:11:33 -06'00' Kent W. Sanborn GUY Digitally signed by GUY TIDMORE TIDMORE DN: c=US, o=U.S. Government, ou=Environmental Protection Agency, cn=GUY TIDMORE, 0.9.2342.19200300.100.1.1=68001003655426 Date: 2019.11.19 14:30:55 -06'00' Guy Tidmore Date 19 NOV 2019 Date 6ENFORM-019-R7 (2/15/2017) 1 Section I - INTRODUCTION Chris Pillers / Mattie Evans Tank Battery Inspection Date: 10/08/2019 PURPOSE OF THE INSPECTION EPA Region 6 inspector K.W. Sanborn visited the Chris Pillers oil and gas facility located at latitude 36.311187 and longitude -96.996225 near Sperry, Oklahoma on 10/08/2019 for an unannounced inspection. There were no representatives of Chris Pillers present for the inspection. The inspection was conducted by authority of the Clean Water Act and the Safe Drinking Water Act to determine compliance with the Environmental Protection Agency (EPA) regulations. FACILITY DESCRIPTION This facility is known as the Mattie Evans Lease. Section II - OBSERVATIONS I observed no secondary containment and overgrown vegetation around the tank battery. The salt water pump was leaking during the inspection. The facility did not have an identification sign. Section III - AREAS OF CONCERN The facility did not have a sign. There were no secondary containment berms. There was overgrown vegetation around the tank battery. Section IV - FOLLOW UP EPA water enforcement will refer this facility to EPA SPCC program. Section V - LIST OF APPENDICES N/A 2