Document 6nyzKq30Y9rvpB5o44jRMOo3

/ ETHYL CORPORATION INTER-OFFICE To Mr. W. D. Gottwald Address Richmond From Subject C. E. Daviet Nichols Construction Corporation Contract for Installation of Wet EDC Storage Facilities Address Baton Rouge Date January 17, 1967 Enclosed is the signed original of a contract dated December 13, 1966, with Nichols Construction Corporation for the installa tion of wet EDO storage facilities. /si Enel. cc: Mr. R. H. Cowlishaw Mr. C. A. Kyle Mr. G. S. Roberts AB.cc . Jg to* C. E. Daviet E--09466 INTRAPLANT MEMORANDUM TO T- ^ _______ FROM '~^7' eTC <*?s^S SUBJECT / &S'fer> ^e>^/--^j*fcj~DATE ^ ^ ______ /f/'.'/'?c/r/dr> Z - (Td?r'cTS S^ts/Zy- mffe?;v'<2r`/? Cv *"7"/^ ^cr /v'c//<><ls &/*?/" C& . -- yy'if'r <?~0c rrs?c;c/r>f<z~-r ft 488 REV. 4/84 E-09467 C ONSTRU CTION CORPORATION 2864 AIRLINE HIGHWAY / POST OFFICE BOX 27S0 BATON ROUGE, LOUISIANA 70821 AREA CODE 504 356-1305 December 20, 1966 Mr. J. R. McClellan, Superintendent Construction Coordination Ethyl Corporation P. O. Box 341 Baton Rouge, Louisiana Wet EDC Storage Facilities Our Job 1199______________ Dear Mr. McClellan: Enclosed are the two signed copies of the contract agreement for the above mentioned project requested in your letter of December 13, 1966. We certainly appreciate your awarding us this work. Very truly yours, BST/mh attachments Bert S. Turner President E--09468 Agreement TO TERSTALL FACILITIES for WET EDC STORAGE 'THIS AGREEMENT made this &.<***(* S3, by and between Nichols Construction Corporation, General Contractor, herein represented byMr. Bert S. Turner, its President, (hereinafter called the "Contractor"), and Ethyl Corporation, A Virginia Corporation, herein represented by G.S. Roberts, its Chief Engineer, (hereinafter called the "Owner"). WMTNESSETH 'That the Contractor and the Owner for the consideration hereinafter named agree as follows: ARTICLE I. SCOPE OF WORK The Contractor shall furnish all labor, supervision, materials, equip ment, and supplies to perform all work per his proposal No. 883 dated December 1, 1966, Ethyl Corporation General Conditions (dated 5-9-66), and Ethyl drawings, specifications, and stipulations mentioned in Ethyl's letter of inquiry dated 11-21-66 and letter dated 11-22-66. All work shall be done in a good and workmanlike manner and to the satisfaction of the Owner. F. B. Kramer shall be the Owner's Construction Coordinator until such time other representatives as the Owner shall at any time hereafter designate by written notice to the Contractor. The said work is to be performed at the Baton Rouge Manufacturing Plant of Ethyl Corporation. E-09469 2. ARTICLE II. TIME OF COMPLETION ' The work to be performed under this contract shall begin within ' 5 days after receipt of order and shall be completed as soon as practical on a straight time basis, tinless requested otherwise with conditions being mutually agreed upon in writing. ARTICLE III. CONTRACT PRICE The Owner shall pay the Contractor a lump sum of Sixty-four Thousand Five hundred and Fifty Dollars ($6U,550). ARTICLE IV. ADDITIONS TO AND DEDUCTIONS FROM CONTRACT Additions to and deductions from contract shall be made in accordance with the General Conditions. Any changed not covered by the proposal will be negotiated at the time they occur. ARTICLE V. ACCEPTANCE AND FINAL PAYMENT Upon written notice from the Contractor that the work is completed, the Owner's Engineer-in-Charge shall make the final inspection, and upon find ing the work acceptable shall promptly issue a signed written certificate verifying the said completion and acceptance of work. Final payment shall be thirty (30) days after the Owner accepts the work, subject to stipulations in the General Conditions. ARTICLE VI. INSURANCE The Contractor shall comply with the insurance requirements as de fined. in the General Conditions. ARTICLE VII. ARBITRATION Any dispute or controversy arising between the parties hereto with respect to the performance hereunder of either shall be determined by arbitration E--09470 3 as provided in the General Conditions of the Specifications except where such dispute or controversy may concern liability for injury or death of any person or persons or liability for damage to or destruction of property (including the loss of use thereof). ARTICLE VIII. ' Contractor will maintain cost records for the work covered by the proposal and comply with the breakdown of costs as shown on the attached Form L-3^0 "Contractor" Final Cost Breakdown". Contractor shall furnish cost break down when requested by the Owner. ARTICLE IX. This Agreement shall supersede and cancel any and all previous agree ments, whether oral or written, between the parties hereto, in connection with the subject matter of the Agreement. . IN WITNESS WHEREOF, the parties hereto have executed this Agreement in multiple originals the day and year first above written. Witnessed: fa* Cl f <sc- Witnessed: U*eSdf?//i2VU^erv^ ETHYL CORPORATION By. G.S. Roberts, Chief Engineer NICHOLS CONSTRUCTION CORPORATION 'Bert S. Turner, President E--09471 1 -s' CONTRACTOR FINAL COST BREAKDOWN REASONABLE ESTIMATES WILL SUFFICE I. For Each Individual Structure (Bldg. Nos.) as follows: A. Building Structure 1. Substructure: (excluding, ground floor slab) 2. Superstructure: (including ground floor slab) Total B. Plumbing 1. Piping - Above ground 2. . Piping - Below ground *3- Equipment (number of lavatories, toilets, urinals, etc. giving purchase price and description) $ Total C. Heating and Ventilation 1. Piping 2. Ductwork *3- Equipment (unit heaters, raidators, fans. etc. to be listed separately giving purchase price and description of each item) $ - Total D. Air Conditioning 1. Piping 2. Ductwork *3- Equipment (list equipment items separately giving purchase price and description of each item) $ - E. lighting Total " * 1; ' Conduit Wiring . . *2. Equipment'.(number of fixtures^ p>anels. emergency units, et'cv giving ..-.purchase price and des cription of each item \ $ ' Fonn L-3^0 Page 1 Total E--09472 Total Installed Cost 4L $ * $ * $ $ $ $ V Final Cost Breakdown Contd. *F. Machinery and Equipment Total Installed Cost (list each unit (grouping identical items) giving purchase price and description of each item or group of items $ G. Equipment Foundations Total 4L H. Power Wiring I. Instruments J. Process & Utility Piping GRAND TOTAL BUILDING II. Outside (Yard) Facilities as follows; *A. Machinery and Equipment (list each unit (grouping identical items) giving purchase price and description of each item or group of items v $ Total 4 B. Equipment Foundations * C. Outside Process Piping 1. Above ground 2. Below ground D._ Outside Pipe Supports Total E. Outside Utility (air, steam, etc. - separately) Piping $. 4 4 4 1. Above ground 2. Below ground $ t; Total F. Outside Electric Lines 1. Overhead 2. Underground . Form L-3^0 Page 2 . -*. .... ... Total 4C_Z ... *** .. ____ E- 09473 Pinal Cost Breakdown Contd. G. Roads, Sidewalks, Surface Drains, Storm Sewers, Sanitary Sewers, etc. (separate for each type facility). CONTRACT SUB TOTAL Total Installed Cost III. Non-Capital Costs - Permanent Removals of Existing Equipment, Relocations of Existing Equipment, Plant -Start-Up CONTRACT GRAND TOTAL $ This outline is intended as a guide only. Upon request by Contractor near completion of Job a more complete detail will be submitted. Total installed cost includes all direct costs plus a prorate of general costs. Engineering will furnish the Contractor a rough plot plan showing individual building numbers (-units) to be used in this report, and a drawing index showing the building number for each building. For large tanks separate costs are required for the tank, tank foundation, dykes, and firewalls. *No breakdown by items of equipment is required for Ethyl purchased items. This then covers total cost of equipment installation only in each Building (Unit). Form Ir>340 Revised 10-11-66 Page 3 I E--09474