Document 6kdbav0RazRwK0DZdrrLzp61
Monsanto
.rCM IMAM! DATI .
TO .
R. M. McCutohan, Krummrich
July 3, 1970
"
Status of Aroclor Pollution Control Month of June
r
Mr. W. B. Papageorge General Offices
a. Buckley
B. Corlew
w. Er.gman
p. Hodges-C.O. F. McDonald-Newport J, Savage-0.0. H. Wi lllams-Anniston B. Young
Current PCB Levels
The estimated Aroolor losses from the production department remain at 65///day. Sampling by the Pollution Control Croup of the waste stream leaving the Sauget village treatment plant indicates a Iobs to the river of 45#/day. This is a concentration of about 200 - 250 pph. Sampling of the river [indicates a definite increase in PCB's below the WGK discharge into the river. For a summary of all analytical data to date, see TSP report 91341:9000, //3, to be issued by 7/W70.
During July sampling techniques will be refined, the sampling program revised, and analysis for PCB's begun in the WOK laboratory. For the comprehensive plans please refer to W. C. Engman's memo to you on 6/25/70.
In the future this monthly Aroclor pollution control report will tie prepared by the Technical Services Department.
Losses to Sewer in June
JOther than the routine Aroclor production losses estimated
above losses were as follows:
ept. 275 - Est. 10 gallons; did not go to sewer. ept. 242 - Est. 10 gallons. ept. 251 - Est. 5 gallons.
PCB Pjolect Work
A. Completed
1. Blow Tank Piping A_l_terations
Pro,). No. 1493 - completed on 3/16/70 $5400 expense, -0- capital Prevents major losses from continuous blow tank.
HONS 09903i
Mr. W, B. Papageorge Statue of Aroclor Pollution Control Month of June
Pago 2 7/3/70 WOK
2. Pff-OaB Piping Alterations
ProJ. No. 19^8 - completed on 5/l**/70 $550 expense, $2100 capital This project allows HC1 Bewered in Dept. 2^6 from the chlorinators to go through the off gas condenser and demister.
3. In Progress
3. Absorber Rupture Disc Alterations
ProJ. No. 1512 - EDO 7/10 (moved back from 7/1/70) $1500 expense, $1(500 capital Will prevent losses from four rupture disc discharge lines.
((. Install Aroclor Settling Basin
ProJ. No. 1795 - EDO 8/1/70 (moved up from 9/1/70) $7000 expense, $7000 capital Will trap Aroclors In production department scv;ers.
5- Blow Tank Demister
ProJ. No. 2031 - Estimate issued on 6/10, design work In progress. Installation EEC 10/1/70 This project will remove 250///day of Aroclor currently being drained from the blow tank JICl header, and will also remove an estimated 50 60///day currently being sewered at the drowning Jet.
R. M. McCutchan
md