Koppers Roof Systems 1978
preface
This manual contains recommended roofing specifications and proce dures which are based on the many years of Koppers experience and ac cepted good roofing practice. They are intended to provide the architect, engineer, general contractor, and roofer with the proper information to plan and construct the best roof sys tems with the most time-proven ma terials available today.
The availability of a Koppers surety bond or guarantee for roofing and flashing constructed according to the information contained in this manual under Koppers bond and guarantee procedure, and the publishing of these specifications and information shall not be construed as creating any warranty, expressed or implied, with regard to any roofing or flashing for which a bond or guarantee has not been issued.
This roofing manual supersedes all previous roofing manuals and litera ture published by Koppers.
The specifications and details con tained in this manual have been de termined to cover the proper proce dure for long lasting roofing systems for most areas of our country,
in certain locations, minor variations in details and specifications may be appropriate due to unusual local con ditions, such as wind, temperature, humidity, etc. To assure the best ap plication of the prooer specifications and details for your area we recom mend you consult your Koppers rep resentative.
Notice:
This roofing specification manual contains the latest and best available information as derived from Koppers long experience in the roofing Industry. Ths design criteria and details contained heroin have been compiled and are offered ns a guide for consideration to assist the architect, owner and roofer In an attempt to provide the best root possible for long, troublefree service. Responsibility, however, for design of any roofing system, remains with the architect or engineer and build ing owner. The contents of this manual are subject to change at the discretion of Koppers Company as future developments and experience are achieved.
INDEX
Coal Tar Discussion Coal Tar Bitumen Discussion Koppers 3uilt-Up Roofing
Material & System Discussion General Requirements & Special
Conditions Application: Roofing Built-up Roof Specifications
deck construction
Wood Plank/ Plywood
Poured Portland Camant Concrete Precast Structural Concrete Sections Gypsum (Poured and Plank) and Lightweight Insulating Concrete
Metal Decks (Insulated)
Water Cooled Roofs and Water Retaining Roofs
Wood Fiber
no. of plies
5 4
4 3
4 3
5 4
4 3
43
4 3
Roof Application over Dycon Concrete
ExelthermT'" Roof Insulation Koppers Multipurpose Membrane (KMM) Plashing Specifications Plashing Details Bonded & Guaranteed Roofing Program
5 4
(1) Also see Sweet's 7.1/Kop
PAGE NO.
3 3
4
5-4 7
basic spec. no.
1 2
5 7
10 11
12 13
17 18
. 23 24
27 28
12 13
8 9 10 11
12 13 14
15 16 18-19 20-21 22-25 26-27
VJ
2
KOPPERS 7.1/Ko
Architectural and
0 Construettoo Matanalt
l
-m *rJ J
>4 J
Tar is a very familiar word, however, it has different meanings for different people. To many it is any black liquid adhesive or plastic substance; how ever, it is much more than this. It is a hydrocarbon, meaning it is composed primarily of carbon and hydogen and is therefore an organic compound. Tar is obtained from the "destructive dis tillation" of coal, primarily bituminous. This means when coal is heated to
A very valuable tar derivative used in the Roofing/Waterproofing industry is Coal Tar Bitumen. Its value is found
in its superb water and corrosive re sistance qualities. Coal Tar Bitumen also performs-as an excellent adhe sive when used in adhering tarred roofing felts together in built-up roof ing. These qualities are due to the unique properties that are endowed to Coal Tar Roofing Bitumen by nature.
Coal Tar Bitumen systems are inher ently resistant to molecular penetra tion by water. Coal Tar Bitumen Built-Up Roofing Systems are nature's own balanced answer to waterproofing and chemical resistance, especially to water and water-borne chemicals.
very high temperatures without con tact with air (thus not allowing the combustion of coal and its deriva tives) the coal molecules in effect are "cracked" into small molecules (gas), medium molecules (tar), and coke. We see, therefore that the more proper term is coal tar.
Without going into a highly technical chemical analysis, it can be most sim ply stated that Coal Tar Bitumen is a balanced organic compound using the Ring Molecule as its major building block. This molecule is illustrated at the right, the atoms of the Ring Mole cule. Carbon (C) and Hydrogen (H)
Coal tar, through further distillation processes, is refined and separated into products of great commercial use fulness and value:
PITCHES OR BITUMENS-of vari
have a very strong molecular attrac tion or bond one to another which will not allow a water molecule to form and therefore be absorbed into the bitumen.
;)
ous consistencies such as roofing
material, waterproofing products,
protective coatings for metals,
c masonry, etc. CREOSOTE--for wood preserving. CHEMICAL OILS--for use in the
manufacture of drugs, dyes,
paints, varnishes, cosmetics, plas
tics. synthetic rubber, etc.
Coal tar is indeed a vital and valuable
product that produces materials for
many industries in our world of today.
V 3
Koppers Coal Tar Bitumen Built-Up Roofing
Materials and System Discussion
Tescr s!;on
Koppers Coal Tar Bitumen built-up roofing systems consist of alternate layers of Koppers Coal Tar Bitumen and Koppers tarred felt, surfaced with a heavy top pouring of Koppers Coal Tar Bitumen into which is embedded an aggregate.
Koppers Coal Tar Bitumen built-up roofing systems are used whenever a roof is exposed to water and/or cor rosion, and on all level or low sloped roofs where long, maintenance-free service is required.
-iivjras
Coal Tar Bitumen built-up roofing pro vides one of the most durable roofing systems known due to its inherent superior waterproofing and weather ing characteristics. This is THE time proven roofing system for level and low sloped roofs.
Coal Tar Bitumen provides numerous advantages to an owner, however, the superior performance of coal tar roof ing systems in the areas listed below make coal tar roofing systems unique in the roofing industry.
1. Coal Tar Bitumen has natural re sistance to water, air and water vapor penetration.
A tight molecular structure enables Coal Tar Bitumen to withstand water penetration and resist oxidation of the roof surface.
2. Another unique feature of coal tar roofing is its self-healing ability.
Alllgatoring and hairline cracks com mon to most materials, eventually cause damage to the roofing mem brane. Coal Tar Bitumen has a prop erty known as "cold flow" which automatically corrects these condi tions before serious damage takes place. This "cold flow" feature heals small mechanical fractures at normal temperatures.
3. Application improvements.
Because Koppers has expertise in the chemistry of aromatic coal tars. Coal Tar Bitumen was developed with the beneficial features of low fume evo lution at application temperatures,
thus reducing potential irritation dur ing application. These features represent significant improvements which are In consort with the aims of government, labor, and industry in the areas of reduced air pollution and improved worker conditions.
Jias
1. All `dead' level roofs. 2. All water cooled roofs. 3. Low sloped roofs with occasional
ponding. 4. Low sloped roofs with retarded
drainage. 5. All buildings with level or low sloped
roofs that are built for long service life.
Koppers recommends that the maxi mum roof slope be one-half (Vi) inch per foot for all built-up Coal Tar Bitu men roof systems. Koppers does, however, permit slopes up to two (2) inches per foot at flashings that in corporate tapered cants and for short run crickets or saddles for drainage, provided there is adequate back nail ing, and these crickets or saddles do not cover more than 15% of the roof area.
All felts must be backnailed on slopes one-half (Vi) inch per foot or more. For recommendations on roofing pro cedures for slopes over Vi inch per foot, consult your Koppers represen tative.
Vr i3r.v?i:a*s 1.--
Underwriters Laboratories, Inc. Build ing Materials Directory, Guide No. (360018) TFJK-Bullt-Up Roof Covering Materials Lists Koppers Coal Tar Bitu men and tarred felts for use in con struction of Class A and B built-up roof coverings. Additional References: Roof Deck Constructions are listed under U. L Guide No. (360 RO) TGKX. Roof deck construction materials, such as vapor barriers, insulations, and adhesives are listed under U. L. Guide No. (360 R13)TGYV.
3 ?^
Koppers Bonds/Guarantees are avail able for 5, 10, 15, and 20 year terms. Roof bonds/guarantees cover ONLY the built-up roofing and flashing mem brane.
For further details, please refer to Page 26 and 27 of this manual.
Coal Tar Bitumen
Property
Water
Specific Gravity 77/77 F (25/25C)
Softening Point (Cube-in-Water Method)
Rash Point (Cleveland Open Cup)
Total Bitumen Soluble In Carbon Disulfide, percent
Distillation Test Total Distillate by weight, given in percent: -- 0 to 315C (32 to 599F) -0 to 360C(32 to 680F)
Method of Test ASTM 0-95 ASTM D-70
ASTMD-61
ASTM D-92
ASTM D-4
ASTM D-20
Physical Properties Requirements -01.22 Min. 1.34 Max. 147F-162F
248F Min. (120C) 72 Min. 85 Max.
0.0 Max. 5.0 Max.
General Requirements and Special Conditions
KOPPERS 7.1/Ko Architectural and Construction Materials
*:: . ::.-5 3;i:cn
In any building the performance of the Built-Up Roofing will ba affactad to soma dagrea by all of tha parts of tha roof struc ture system as wall aa tha Insida and outsida atmospheric environment. Each com ponent should ba investigated for its com patibility with each of the others. Tha roof structure system may include any or all of the following:
Outside Air Conditions Roofing System Peripheral Details (Flashings) Insulation (if present) Vapor Barrier (If present) Structural Deck including sub
purlins (supportsi Structural Framing Air Space (if present) Ceiling (if present) Interior Air Conditions
You will find information in this manual pertaining to materials and application methods other than for built-up roofing. They are offered to assist the designer in establishing their normal position in tha roof structure system. They should not bo construed as part of the built-up roofing system, as endorsement, nor as part of the designated specifications other than to establish a suitable roofing base in the roof structure system.
The proper design, specification and posi tioning of tha various components of tha roof structure system is tha responsibility of the building owner or his designer. Any subsequent failures, due to either the in stallation or lack of installation will not ba Koppers responsibility.
The deck is the base over which tha builtup roofing, or insulation and built-up roof1 ing is applied. Where the term deck is used in this manual without reference to insula tion. it shall dasignate the surface over which roofing is to be applied. All decks shall be clean, smooth, dry, rigid and free of debris. Any deck defect shall ba cor rected before application of roofing. All decks shall be installed in accordance with the deck manufacturer's specifica tions and shall be in compliance with Koppers General Requirements.
In approving any deck as satisfactory to receive a Koppers roof, only the deck sur face is accepted. It is the responsibility of the building designer and the deck man ufacturer to provide for expansion and contraction in a manner that will provide a stable base for the roofing; for support of maximum anticipated loads: secure
attachments vertically and laterally, and the selection of the deck material and construction details including their ability to contain bitumens. (KOPPERS WILL NOTASSUME RESPONSI BILITY FOR DECK DEFECTS ON KOPPERS ROOFS. OR BITUMEN SEEPAGE.)
The placing of conduits, bolt heads, etc., above the roof deck and below the roofing membrane is not recommended.
All projections or openings in the deck should be completed prior to the applica tion of the roofing.
Optimum adhesion to the deck is neces sary for good roof performance. Where Koppers Bitumen or steep asphalt is used for adhesion, questionable decks may be tasted for dryness and adhesion by pouring one pint of tbe bitumen, heated to applica tion temperature, over a representative area or areas of the deck. The deck is not satisfactory If tha bitumen foams or bub bles, or upon cooling to ambient tempera ture may be stripped clean of the deck.
All surfaces must be dry, reasonably smooth, clean, rigid and free from debris, loose materials, projections and holas which might cause rupture of the membranee.
Metal Decks: Decks of this type must also be free from loose rust and oily sub stances. Deflection should not exceed 1/240 of the clear span and conform to Factory Mutual requirements.
Note: When applying insulation and roof ing over a perforated or acoustical type metal deck, it is recommended that a vapor barrier be installed prior to the application of the insulation or that a base sheet set in steep asphalt be utilized as the first ply of. Built-Up Roofing. This is to reduce the possibility of Bitumen drippage.
Poured Portland Cement Concrete, Pre cast Structural Concrete Sections, Poured Gypsum, Lightweight Insulating Concrete: Decks of these types with Inclines of onehalf (V4) inch per foot or more shall permit nailing, or treated nailing strips must be ` set in the deck and installed prior to roofing. Where insulation is specified, nailing strips may be secured to the deck surface of the insulation. These strips should be spaced not more than three (3) feet apart and placed up and down and not across the slope of the roof. Roof deck shall be properly graded to outlets.
Precast Decks: (concrete, gypsum, wood fiber) Decks of these types, whether grouted or not, shall be caulked with Koppers Flashing Cement which shall be applied so that the top surface is level and smooth. Felt stripping four (4) to six (6) inches wide set in a troweling of the cement is recommended to assist in level ing uneven joints and bridge the joint openings thus providing a better surface for the roofing materials.
Wood Plank/Plywood: Wood shall be well seasoned, dry and preferably treated. End joints shall have adequate bearing. Loose or void knot holes, large cracks, etc., shall be covered with sheet metal.
Lumber shall be a minimum of 1" nominal thickness.
Plywood shall be a minimum of Vi" thick ness.
Lightweight Insulating decks include light weight aggregate concrete (20 to 40 lbs. per Cu. It. oven dry density); foamed con crete, gypsum and thermosetting asphal tic decks. Except for Dycon Concrete, lightweight insulating deck systems must be capable of venting excess water vapor to the underside. Koppers will not acceot these lightweight Insulating decks to be placed over vapor barriers, poured con crete substrates, unvented metals, or any type of base which will not permit these materials to vent from the underside. It is necessary to prevent a water vapor pres sure build-up under the built-up roofing. Occasional, or spot vents through the roof ing as the only venting method are not satisfactory substitutes for underside or continuous vented systems.
In addition, lightweight insulating decks shall have sufficient cohesive strength to provide firm attachment of the roofing to the deck and framing to prevent wind uplift .damage or blow-offs. Nailable decks must be capable of developing at the very mini mum, a 40 pound nail pull-out or with drawal strength, if the materials do not achieve this value, additional fasteners will be required over and above those quantities described-in the ensuing speci fication (standard Js approximately 100 fasteners-per square) to achieve a mini mum attachment standard of 40 lb. per square foot Koppers will not be responsi ble for failure of the-insulating deck to remain Integral or tar disbonding of the roofing (sqm thqgurtace of the deck.
ProvisloriTOhouldbe made wherever pos sible to provide additional venting such as notched wood perimeter nailers, etc., in conjunction with the venting from the
5
underside of the deck. If board typa Insulatlon Is to ba applied over a lightweight insulating dack. provisions must ba made between the fill and the board insula* tlon to prevent fill moisture from affecting the insulation and roofing.
_.e'.3i -rsiscicn
It Is the responsibility of the roofing con* tractor to protect all roll roofing materials and roof Insulation from ground or con* struction moisture and weather before and during construction.
-'.tachment
Maximum adhesion or secure attachment of all components in the roofing assembly is necessary for satisfactory long tarm per formance of the roofing membrane. Ad hesive and/or fastener quantities specified by the manufacturer must be capable of passing a minimum uplift resistance of 40 pounds per square foot (psf).
When Building Code requirements dictate a higher uplift resistance than our mini mum requirement, additional fasteners or adhesive will be required over and above the quantities described in the ensuing specifications.
Solid mopping has been found to provide an uplift resistance in excess of 120 psf.
Strip mopping, as suggested in the speci fications in this manual, has been found to provide an uplift resistance in excess of
60 psf. When nails or fasteners are used, they must be nailed through flat tin disks or have sufficiently large heads to prevent fracture or puncture through the roofing felts.
The following are the names of some manufacturers who provide nail and/or fastening devices for use with built-up roofing:
E/ S Products, Inc. New Rochelle. NY Simplex Naif 4 Manufacturing Corp. Americus. GA Independent Nail Corp. Bridgewater. MA E. G. Building Fasteners Corp. New York, NY
Koppera will not be responsible tor any damage caused by or the result of unsatis factory attachment
For further Information contact your Koppers representative.
Expansion Joints (Building)
Since all materials axpand and contract due to temperature and/or moisture, the usa, location, and design of building ex pansion joints, especially in the roof struc ture system, should be taken into con sideration at the time of original building design.
Although provisions for adequate expan sion joints are the responsibility of the building designer, Koppera offers the fol lowing recommendations forlhe protection of the roofing system against splits caused by expansion and contraction of the build ing. Building expansion joints should be installed.
J. On large root areas at least 200 feet in each direction.
2. At all places where the structural sup ports and roof assembly change di rection.
3. Where type of adjoining deck materials change.
Where control or expansion-contraction joints are provided in the structural steel, deck material, or deck system, provisions must be made for continuation of this re lief through the built-up roofing system. Koppers realizes that in a climate controlad building there may ba little or no expansion AFTER the building is in use, however, building expansion joints are still recommended based upon the following
points: 1. During construction the'building will
not be under a steady state tempera ture/humidity condition so that thermal and moisture movement can be suffi cient to fracture the roofing.
2. If no building expansion joint is pro vided, the owner must keep the build ing at the steady state temperature and humidity condition at all times, as holi day shut-downs can fracture the roof ing due to the movement of the root system resulting from temperature/hu midity variation.
3. If the occupancy Is fairly larga, the sudden entrance on a rainy day ot many rain-soaked employees may cause moisture movement in the roof structure system which can fracture the roofing.
Water Stops (Temporary Protection)
Water stops consisting of two (2) plies of tarred felt and mopping of Coal Tar Bitu men for flat roofs or asphalt felt and asphalt for steep roofs extending onto the deck at least 6" and 4" on top of the insulation, shall be applied at the end of each day's work over exposed edges of insulation.
Theee Iswpoiwy protsctlw imsssii meat be removed cleanly when vorit is vosomsd io prevent blocking moisture vapor move ment to vented edge details.
' Cut Offs (Permanent Installation)
Venting of roof insulation at walla, curbs, eaves, etc. is recommended for all but a few special roof structures. Therefore, cut offs should not be installed at edges of insulation adjoining thasa areas for vent. ing purposes.
Cut-offs may be installed however, pro vided they are constructed to run in one - directioncontinuously to vented edgaa and provided no section of the roofing is iso lated or blocked from venting.
Koppers Steep Roofs
For detailed specifications regarding KMM Aluminum Roots, smooth surface asbestos roofs, or steep asphalt and gravsl, roofs, consult your Koppers representative or contact Koppers Company, Inc., Pitts burgh, PA.
Vapor Barrier
Vapor barriers are normally used where the heat flow direction and/or humidity within the building, during any climate or occupancy cycle, might cause the dew point or condensation to occur under the built-up rooting within the insulation cham ber. It Is important that the vapor barrier, when installed, provide a continuous seal, (including ventilators, skylights, peripheral walls, and other terminations) from the source ot the water vapor.
`nsuiation
insulations come in varying thicknesses and sizes. Should the manner of attach ment as suggested conflict with that speci fied by the individual insulation manufac turer. the insulation manufacturers spec ifications shall be followed and in addi tion, shall be in compliance with Koppers General Raquiramanta.
Good roofing practice dictates that the fol lowing points be considered when specify ing board typa roof Insulation.
1. The roofing insulation muatfte kept dry at all times. It must be of'a type ap proved by Koppers tor use with a Kop pers built-up root. It should only be applied over a dack complying with all of Koppan General Requirements.
2. If the deck slope is one-half (ft) inch per foot or more the insulation must be able to retain nails or wood nailers must be installed perpendicular ts the slope at each course of insulation.
Spacing of naitsrs must be such that the insulation fits snugly with the-rvi -^rs but must not be force fitted.
3. No more insulation shall be la
any
one time than can be protected oitu-
men and felt in case of sudden weather
changes.
4. Edges of insulation shall be brought closely together and shall not be forced into place. Where insulation joins ver tical surfacss, the insuietlon shall be cut in a neat manner'allowing approxImataiy one-half (ft) inch ciearanca.
5. When more than on# (1) layar ot insula tion is usad, joints in aach layar shall not coincide. All layers shall be parallel to preceding layers.
Wood Nailing Strips
All non-nailable decks require wood nail ing strips at aaves, edges, walla, roof openings, etc. for proper seeurement of metal flanges. Nailers must be securely and firmly attached to thtfffeck or through to its supporting members. Nailers shall extend not less than t" beyond the apron or flange.
Roofing felts fpr all decks having a slope of ft" per foot or more must be back nailed and therefore non-nailable decks must be furnished with treated wood nail ing stripe treated with a material com patible with bituminous roofing.
Cold Storage and Freezer Buildings
Koppers wilt not bond its built-up roofing over these structures if insulation or in sulation and vapor barrier is installed over the deck unless there Is an adequately ven tilated air space between the deck and insulated refrigerated area.
For procedures on non-bonded built-up roofing application* or KMM installation, consult a Koppers representative or Kop pers Company, Inc., Pittsburgh, PA.
Temporary Roofing
Temporary roofing specifications are avail able for all Koppers Coal Tar Bitumen Built-Up Roofing Systems. Consult your Koppers representative for recommended specifications over various type decks for temporary roof construction.
Application: Roofing
KOPPERS 7.1, Ko Architectural and Construction Materials
t'
Abdication of 3itumene Recommended Weights per 100 sq. ft. (for
varying widths of the edge laps. Fourply (4) roofing, for example, is achieved by
requirement for this aggregate are as fol lows:
estimating purposes only)
lapping each ply approximately twenty-
Total Passing,
seven and one-half (27%) inches.
Slava Sin
Percent
Koppers
Average Interpiy
Top Coating
Koppers felts are marked at the factory with lap lines for this purpose. Except as specifically provided for in Koppers speci
Vt"
100 90-100
4-70
Coal Tar Bitumen
25 lbs.
75 lbs.
fications, application of felt lapping meth ods other than shingle fashion will not be
No. 4 No. 8
0-15 0-5
Steep Asphalt
23 lbs.
60 lbs.
permitted.
Oust. max. pet.
0.5
Average interpiy weights are based on long years of experience in good roofing practice, and take into account a reason* able variation in the amount of bitumen absorbed in different substrates, and the type of specification. Moppings of bitu*
When beginning a membrane roofing in stallation, appropriate width starting strips of felt shall be used at the starting point to achieve the specification ply build-up at that point so that successive felt appli cations will produce the ply requirements.
Moisture, max. % crushed stone end gravel
Crushed roofing slag Unit weight (loose)
min. lb. per cubic ft.
0.5 5.0
60
men between lefts shall be continuous.
Overlap ends of all connecting plies of
Cz.i \V3s`'-2r -i-o-icatlon
Felt shall not touch felt. The top pouring is most important, it must be thorough and uniformly covered with specification
fait (end laps) not leas than 10 inches. End stripping or taping of these laps is not
permitted.
Whan roofing is applied at temperatures below 45' F. special precautions must be taken to insure the satisfactory perform
aggregate embedded into th* bitumen
Koppers recommends that aN felts be
ance of the finished roof. Before applying
While the Bitumen Is Stm HOT.
backnaUcd when the slope of the deck la
rasing, moisture, ice, snow, surface wa
Recommended Temperature Limitations:
Koppers Coal Tar Bitumen
Temp. *F Heated Application (max.) (min.) (recom.)
425 300 375
one-half (Vi) inch par foot or more.
Application of Koppers Bitumen and Aggregate Surface
The final application of Koppers Roofing is s triple weight application of Koppers Coal Tar Bitumen (approximately 75 lbs./
ter, etc., must be removed from the deck.
Hot applied bitumens tend to congeal rap idly in cold weather. Extra care must be taken to set insulation or roofing as quickly as possible while the bitumen is still hot.
Oo not heat bitumen* above the maximum temperature limit listed above to compen
Steep Asphalt 475 350 425
sq.) into which is distributed an approved
sate lor rapid chilling. Insulated contain
When roofing bitumens are overheeted their waterproofing qualities are greatly
aggregate while the Bitumen is still hot. Benefits of aggregate surfacing
ers along with carefully timed material delivery methods, must be employed.
(
reduced, and at the same time the volume of fuming is increased. In order to achieve
1. Protection from foot traffic of other trades during construction and after
3?2 Si-eel Alternate When substituted for the first ply <n a solid
the maximum benefits of low fuming and
wards for routine roof maintenance.
mop application specification, the Base
unequaled waterproofing performance, it is
2. Weight as additional protection for
Sheet shall be embedded in a solid mop
imperative that Koppers Coal Tar Bitumen
wind uplift.
ping of Koppers Steep Asphalt followed by
be heated within the temperature limits* tions listed above. Close supervision of heating is also good roofing practice for all bitumens.
If heat is desired during a holding period at the |0bsite while material is not being
3. Reduced surface temperature.
4. Evan flow of water to the drains. 5. Fire protection from burning brands. 6. Protect bitumen from the actinic rays
of the sun.
thorough brooming to eliminate air pock ets, wrinkles, fish mouth, buckles, etc. The remaining two (2) or three (3) plies of Tarred Feft shall be solid mopped with Coal Tar Bitumen in accordance with the specification.
drawn off and replenished as under nor mal usage, kettle temperature should be reduced and not permitted to exceed 3S0' F for Koppers Coal Tar Bitumen or 425*F
7. Moat Important--by using an aggregate surface, an additional 75 Ib./sq. of Coal Tar Bitumen (the waterproofing agent) is included in the installation.
When substituted in a nailing application specification, the Base Sheet may be used in lieu of the two nailed No. 15 tarred felts. When rosin sized or sheathing paper
for steep asphalt. The kettle should be The application oi Koppers Coal Tar Bitu
is a pert of the original specification it
full lid closed. These temperatures are
men and aggregate must be done at the
shall remain and be applied beneath the
applicable to job condition*- and do not time the felts are applied; except in pe
Base Sheet. Edge laps shall be 4" and end
apply to holding or storage in kettles in
riods of hot. dry weather when the top sur
laps shall be 6". The nailing pattern for
excess of 4 hours. If bitumen is not to be
facing may be delayed overnight.
the Base Sheet shall be 9" on center
used for periods over 4. hours, the kettle should be shut off.
When the specifier desires glaze coating and/or all work to be completed the same
through the lap and 2" from the edge lap and stagger-nailed down the center of
Koppers Coal Tar Bitumen may be con
working day. he shall be responsible to so
each sheet on 9* centers. (Note: This is
tained in 1000 gal. or greater capacity
state this requirement in his specifications.
approximately 100 nails per square.)
heated and automatically controlled closed vessel tankers at 375* F for perioda. not exceeding 96 hours.
The aggregate surfacing must be applied into the top pouring while the bitumen is still hot so that a uniform layer will be
When specifying.the Base Sheet alternate use of the designation be as a subscript to the specification number. For example,
A:=: oation ct Felt
embedded and adhered. The completed
when substituting base sheet in a roofing
Plies of felt must be laW shingle faehlaa.
Where a water flow direction exists, fetts should be applied so that the direction of flow is not against the laps. Broonuor press all plies of fait into the hot bitunren and lay without wrinkles, buckle* or kinks, so that the finished roof is free of pockets or blisters. Each felt p(y shall be com pletely covered with a complete mopping
roof assembly will have a uniforWLaggregate surface. Depending on slag weights in certain parts of the country 400 Ibt. of slag per square may be required. Occa sionally on well applied roofs, small black globes known as "raspberriss" or ``black- . berries" will form in the roof surfaces^ These are not detrimental to the roof.
Aggregate Surfacing
specification over Metal Deck--designate aerJ7wibe; .
Note:
If Koppers Asphalt 'Coated Base Sheet (ASTM 0-2626) is substituted for the first ply (plies) of the Coal Tar Bitumen roofing specifications, it must not be left exposed or ueed as a work surface prior to roofing completion. Good roofing practice dictates
of bitumen.
.
The aggregate to be used should meet the
that the total rooting membrane be com
The number of plies are controlled by
ASTM Specification D1863-64. The basic
plete the seme day.
7
Coal Tar Bitumen Built-up Roof Specifications
deck construction:
'' t
HW C (. M5 lr>. >W/
r'yv/cod
SLOPE See pg.4 SURFACE Aggregate
For recommendations on wood and wood treatment, contact: Koppors Company, Inc.. Forett Products Division, Lumbar Salsa Dept. 750 Koppara Bldg.. Pittsburgh, PA 15219
Spec. No. 1--5 piy Spec. No. 2--4 ply
Spec. No. 1 wi--4 piy Spec. No. 2 wi--3 ply wi: with board type insulation
Spec. No. 1 wiv--4 ply Spec. No. 2 wiv--3 piy wiv: with board type insulation and vapor barrier
Traatad wood should ba usad wham a vapor Parrtar is requlm***ee Paga 8.
Select clauses as required. Optional clauses in italic.
Hot Coal Tar Bitumen should navar ba applied directly to a wood dock. Sandwiched between the heat from above and the heat from below, such material finds its way through the boards Into the building. Qood practice demands tha cushioning snd blotting effect of a layer of
sheathing paper followed by layers of dry felt Shiplap and square edge boards should be avoided where possible. If the underside of tha roof deck is exposed to air prssaum created from open doors or windows, tongus-andgrooved lumber should be used.
Condition of Surface to Receive Roofing
See Page 5.
Material Quantity Requirements
Soo Paga 7.
Preparation Below insulation
1. Tha wood roof deck shall ba covered with one (1) layer of approved rosin-sized sheathing paper weighing approximately five (5) pounds per one hundred (100) square feet. The sheathing paper shall be lapped two (2) inches and secured to the deck by occasional nailing.
2. Two full thicknesses of Tarted Felt shall be laid over the entire surface, lapping each sheet nineteen (19) inches over the preceding sheet and nailing the sheets in place.
Application of Vapor Barrier Below Insulation
Note: When vapor barrier is required, use these procedures in addition to Prepa ration Below Insulation noted above.
Lay over tha entire surface two (2) full thicknesses cfKoppers Tarred Felt, lap ping each sheet nineteen (19) inches over the preceding sheet--mopping with Coal Tar Bitumen the full nineteen (19) inches so that in no place shall felt touch felt
Application of Insulation
1. Mop the entire surface with a uniform coating of Coal Tar Bitumen into which, while hot, firmly embed the Insulation.
i-ip. -:o.:
General Requirements on pages 5, S and 7 and DetaR Specifications on pages 20 through 29 are a part of this specHIcatton and must be adhered to where applicable.
8
r-
Specifications (continued)
anwl or Sltg Embedded In Pouring of Coil Ter Bitumen Altemcte layer* o Coel Tar Bitumen and Tarred Pelt Mogplng of Coel Tar Bitumen Inaulatlon Emoedded in Coal Tar Bitumen Two layer* of Coal Tar Bitumen and Tarred Pelta Poured Concrete
KOPPERS 71/ko Architectural and Construction Matenat*
deck construction:
Z.ir.ani Ccncrao
SLOPE See pg. 4 SURFACE Aggregate
Spec. No. 5--4 ply Spec. No. 7--3 ply
Spec. No. 5 wi--4 piy Spec. No. 7 wi--3 piy wi: with board type insulation
Spec. No. 5 wiv--4 piy
'\,!r
Spec. No. 7 wiv--3 plyreoa,r- reauir-
wivtwrth board type
insulation and vapor barrier
(
Poured concrete deck* sometime* cauae trou ble because the built-up roofing It laid before ttte deck is thoroughly dry. When this happens the result is s blistered and buckled membrane or, iust as serious, the Insulation curls and makes an unsatisfactory job. The roofing con tractor, backed by the architect should Insist
on a thoroughly dry deck before beginning work. He should also see to It that the deck Is tree of loose sand, frozen scale and other
foreign matter. Projections should be removed, low points filled with cement grout or other suitable material, and all cracks painted up.
Select clauses as required. Optional
clauses in italic.
- ; :*
r. '--0
5
Condition of Surface to Receive Hoofing
See Page 5. Material Quantity Requirement*
See Pag* 7.
Application of Vapor Barrier Below Insulation
1. Apply a uniform coating of Goal Tar Bitumen to the deck.
2. Lay over the entire surface two (2) full thicknesses of Koppers Tarred Pelt, lap ping each sheet nineteen (19) inchas over the preceding sheet--mopping with Coal Tar Bitumen the full nineteen (19) inches so that In no place shall fait touch felt
3. Extend all piles of felt up vertical sur faces and cut off at hefght of insulation.
Application of Insulation
Apply a uniform coating of Coal Tar Bitumen over the entire surface Into which, while hot, embed the insulation. If there are two (2) layers of insulation mop the entire surface of the first layer with Coal Tar Bitumen into which, while hot, embed the second layer of insulation.
-.2-?
General Requirements on pages 5,6 and 7 and Detafl Specifications on pages 20 through 2S are a part of this specification and must be adhered to where applicable.
9
Specifications (continued)
deck construction:
"rscast Structural Concrete Sections
SLOPE See pg. 4 SURFACE Aggregate
Spec. No. 10--4 ply Spec. No. 11--3 ply
Spec. No. 10 wl--4 ply Spec. No. 11 wl--3 ply wi: with board type insulation
Spec. No. lOwiv--4 ply Spec. No. 11 wiv--3 ply wiv: with board type
yeat.rs of .1servictvtpor barrier
Qrevai or Stag EmbMdad in Pouring of Coal Tar Bituman
Pracaai concrete structural aactlona demand tha sam* racommgndationa aa poured eoncreta daeka. although tha preacnea of moiature, dua to insutficiant drying tlma, ia not
likaly. If tha contractor finda on* or more slaba raatlng unavanly, with edgaa projaettng abova tha surlaca. this should Pa correctad by reaattlng or lavaiing off. Open-cell aggregtta Is not
aecaptabla for filling or lavaiing low areas. All
joints, groutsd or not. should ba caulkad with trowal-grada asphaltic plastic cement. Slab
sidaa and snds should ba square, rest firmly and svanly on supporting members. and ba inatallad to pravant lataral and vartical movamant.
Select clauses as required. Optional clauses in italic.
- ::: zs-z'e-z z. -.? -cof-ir
Condition of Surface to Receive Roofing See Page 5
Material Quantity Requirements
See Page 7.
Application of Vapor Barrier Below Insulation
1. On precast concrete slab or tile deck, strip mop with Coal Tar Bituman up to four (4) inches from the edge of each joint Not less than 30% of tha surface must be mopped, at a mm. rate of 10 lbs. per 100 square feet.
2. Lay over the entire surface two (2) full thicknesses of Koppers Tarred Felt lap ping each sheet nineteen (19) inches ovar ths preceding sheet--mopping with Coal Tar 8itumen the full nineteen (19) inches so that in no place shall felt touch felt
3. Extend all plies of felt up vertical sur faces and cut off at height of insulation.
Application of Insulation: Ovar Vapor Barrier. Apply a uniform
coaling of Coal Tar Bituman ovar the entire surface into which, while hot, embed the insulation. If there are two (2) layers of Insulation (e.g. as required for pre-stresses
concrete sections) mop the entire surface of the first layer with Coal Tar Bitumen into which, while hat, embed the second layer of Insulation.
Over Deck. On precast concrete slap or tile deck, strip mop with Coal Tar Bitumen up to four (4) Inches from the edge of each joint. Not less than 30% of the surface must be mopped, at a minimum of 10 lbs. per 100 square feet. While hot, embed the insulation. If there are two (2) layers of insulation (a.g. as required for pre-atressed concrete sections) mop the entire surface of the first layer with Coal Tar Bituman into which, while hot, embed the second layer of Insulation.
-sj aron 's 'c-.v -ccss-;-.
'.'s'jr's j
*C"C'3I8 --3 " *`3
=aca 5.
iapUcation of Roofing Materials
1st. E S:C
r-3 scat
i~'Z
2nd. Spec. No. *0 -"/ c-.ar ;-a a-t.-a s.-a:.3
-i,
*..an**.-as,5. a-- ~ ~r-~ a `
--"es.
"zz s;'.c'y zs'neer aazr
/. Ccsi Tar Bitumen sc zrz.' 'a:: tcucr `ait.
--` sc - "c : a:a
2na. Spec. No. 11
Ap: , z.er :be inis szf'zze --te h
dies of Koppers Ta-ec r; = zz. % ; as
ar.i `.wc-'^rzs 2--':
a?
`,!cp soliS y between :.rs
s:
Eca; 7a- z'j.-en sc :r.e; r. -c z.szs s.-.m
Si! -z^zr a.:.
._r'= ~.ze
s
'.
c- ;ar ;:: ."c-e i~z '~s ~sz- zs -- "
-z *= a--:-; sac' z- .zze' szzs
t3Ci 2--e: zn ?. -3>. ~.t z` '
2- ;3-:a-5. V.-a-a z?'- ::-f
zg--.: ?. t '2
=: :=
i-j 'aa 3": a?.-' =--*. '3 : a
jzzs-eczs 3: szzzrz- ;s=.
-z:.z- z1 -3 a.-s.
3.-d. z-.g- --a a*:..`r s-
z:`rz -*.a'-;-3rs 3
Zza, ~z- E'-.-ar
.- :* 1 *:*
g-zsz -c: ass --5.-
sz
cc^-cs :* c'E.a -- -=
pc-.":s :-ac asc- :*a - .-zsz ::
szj.gre -ast.
General Requirements on pages S, 3 and
7 and OetaB Specifications on pages 20 through 23 are a part of this specification and muat bo adhered to where applicable.
10
Specifications (continued)
amt and gypsum metal bound planks. All unavan slabs should bs rtsat or lavalad olf so that tha roof will ba laid on a flat and avsn surfaca. trsa from proiactlons and low araaa. Bacausa thasa slabs are precast tha possi bility of a high moisture contant baing prasant is more ramota than in tha poured gypsum roof or lighlwaight insulating conereta roof dack. Poured gypsum docks somatimas causa troubla bacausa tha built-up roofing is laid bsfore
brans, or, just as sarfous, insulation curls and makss an unsatisfactory job. Tha roofing con
tractor, backad by tha architact must insist on a thoroughly dry dock bsfore baginning work.
Ha should also sao to it that tha dack is free of looss sand, frozen seals and othar foreign mattsr. Proiactlons should bs removad, low points flllad with camant grout or othar suitabla matarlal. and all cracks pointed up.
KOPPERS 7.1/Ko Architectural and Construction Matanals
deck construction:
Pcursd Gypsum Precast Gypsum
Lightweight Insulating Concrete
SLOPE a See pg. 4 SURFACE a Aggregate
Spec. No. 12--5 ply Spec. No. 13--4 ply
Spec. No. 12 wi--4 ply Spec. No. 13 wi--3 ply wi: with board type insulation
Spac. No. 12 wiv--4 ply Spac. No. 13 wiv--3 ply wiv: with board type insulation and vapor barriar
Saa page 5 for Lightweight Insulating Packs
Nets: Thermosetting Asphaltic Concrete Pood Establishment Application*
Baa# Sheet mutt ba used aa tha first pfy--See Page 7
PROCEDURE
Select clauses as required. Optional clauses in italic. Zo:/ " oc.-cr denctes bm'!-jp 'oofins s:eci.ca:cr.
Condition ot Surface to Receive Roofing See Page 5.
Material Quantity Requirements Sae Page 7.
Application of Membrane Below insulation
1. Apply over entire surface one (1) ply of Koppers coated baee sheet, lapping each sheet tour (4) Inches over preceding sheet and nailing et lap no me then nine (9) inches and stagger nailed down center ot each sheet on eighteen (18) Inch centers.
2. Extend plies up vertical surfaces and cut off at height of inauiation.
Por vapor barrier provisions contact your Koppers Representative.
Application of Inauiation Over Membrane (or Deck)
Apply a uniform coating of Coal Tar Bitumen over the entire surface into which, while hot, embed the insulation. If there
are two (2) layers of insulation mop the
entire surface of the firat layer with Coal
Tar Bituman into which, whila hot, embed
the second layer of insulation.
For application of roo'oc m.aterais eve'
insulation fo
Appicstion of =cofmg
Vateriais procedure `s' ppu'sp eo-c-ate
Page 3.
Application of Roofing Materials to Deck
1st Instaii two <2`- ores of Koocer3 Tarred Fe-t over ent-re solace 'a;ced nineteen <l3i meres witn acp'cveo -=: =. Nail or eignt and one-naif .3';. cs-tirs ore it) inch iron eoge 'ao. tflcte: T.-vs s approximately ICC naiis per ICC- sq. tt.j.
Alternate: -top:y p.er ar-.'-e surfaca one '") of Keepers ccateo esse snset. 'seeing seer, sresi icur .nefes ova- p-eced'ng s~eet zr.z `*3*- mc 31 :sp *?o *3s .vrsn r.ins .3. -nc~.es arc dagger -a.ied ccr. earner ot eacn s.'sef on eighteen .'2, inch centers.
2nd. Spec. No. 12
Apo'v free '3 p' as of Kcppe'S Tarras
:sit. .ecp r.g ; ,gs aen*>-'pur and two-
thircs -2r:: ~cr.es. .V-e-e s sea of ces'"
s cne-ra-'
r.c.n per *cst o- ~ore r.s''
eacn sees: of `eit s.x '6, ncres "or- ;.ne
Pscy
zn %vsz**ytc~* 2^ ~zm
`575. * SCS S"i
""ZZZ-Z
;r-'ds
.-:`-es so ;~.a: - n: caps
sr.a. 'a : ep.cn 'e :.
2nd. Soec. No. 13
Ac: y two 2 C es
r -a*:
:e`t. ecp,r,g p.,es n r^:sa~ }
`t\ arfl 5.ZZ2 "Z* - i " * 5 - ^ T * ~ J 1
scuare *3e:.
General Requirements on pages 5,6 and 7 and befall. Specification* on pages 20 through 29 are a part of this specification and must be adhered to where applicable.
11
Specifications (continued)
deck construction:
stai Z<3C'.<3 (Insulation Required)
SLOPE See pg. 4 SURFACE Aggregate
Spec. No. 17 wi--4 ply Spec. No. 18 wi--3 ply wi: with board type insulation
Spec. No. 17 wiv--4 ply Spec. No. 18 wiv--3 ply wiv: with board type insulation and vapor barrier
,, Gravel or Slag Emoaddad m Pouring of Coat Tar Bituman
Alternate Layers of Coal Tar and Tarred Fait Bitumen
Mopping of Coal Tar Bitumen
Insulation Adhered to Vaoor Barrier
Detail of Specification No. 17 wiv
It is absolutely nscsssary to install board type insulation on a matal dack before the built-up roofinq is applied. A metal deck must be cleen. smooth, and property inehored to the steel purlins and all joints correctly lapped and fastened. Type of metal deck, flute opening and various other (actors determine the type and thickness
of insulation required. Consult your Koppers representative for recommendations.
Metal roof dacks shall be designed so that they will not have a deflection exceeding 1/240 of clear span under all types of loads (live & dead). Oestgner should take into ac count roof traffic conditions including mscnan. ieal equipment used for roof application.
Select clauses as required. Optional clauses in italic.
Condition of Surface to Receive Roofing See Page 5
Material Quantity Requirement* See Page 7
Application of Vapor Barrier Below Insulation
A. Fait Type Coat the rtbs of the metal deck with Steep Asphalt and then install two (2) full thicknesses of Koppers No. IS Asphalt Pelt, lapping each sheet nineteen (19) inches over the preceding sheet, mopping with Steep Asphalt the full width of the nineteen 09) inch lap. Extend all felt up vertical surfaces and cutoff at height of insulation.
Application of Insulation and Roofing Matariala
1st s. install insulation in steep asphalt applied to deck at rate of 12 to 15 lbs. per
100 sq. ft and place insulation white steep asphalt is still molten to provide good ad hesion. See Attachment Page 6.
b. If slope of deck is one-half (Vi) inch per foot or more, insulation must be able to retain nails and, in addition to being set in steep asphalt, insulation must be fast ened to the metal deck with approved mapbanicaitasteners placed at all four (4) corners and the center of each sheet. It two layers of insulation ara specified, top layer joints shall not coincide with joints of bottom layer. Fasteners shall be dnven after the top layer of insulation is installed.
e. If U.L. and F.M. requirements ara a factor for insurance rating, insulation must be listed and approved in accordance with their current data.
3rd. 3oec. Nc. '7 ;!
3r,2. Sssc. .vs. .3 * i
General Requirements on pages 5,6 and 7 and Detail Specification* on pages 20 through 23 are a part of this specification and muet be adhered to where applicable.
12
Specifications (continued)
Two Uyen of Gravel or Slag Effltwddod in two (2) Pouring* of Coil Tr Bitumen
Alternate Layer* of Coal Tar Blluman and Tarred Fait
Mooping of Coal Tar Bitumen
Pounng Concrete, Gypeum or Precait Concrete Slab Deck
Detail of
Specification Mo. 23
.va'== ZZZ.zZ -0Z- Water Is daaigned to be contained on the roof at all time* at a conatant level by mean* of a drainage syatam and a water source. (See not* on cold weather conditions.) Water Cooled Roof* alao Include spray pond roofs where the roof is constantly sprayed with water but not neceasarily kept at a conatant level. Water Cooled Roofs should be applied over poured concrete, gypsum or pre-cast concrete decks. IT IS MANDATORY THAT THE WATER COOL ING SYSTEM BE CLOSED DOWN AND THE
ROOF DRAINED PRIOR TO COLD WEATHER. Neither roofing nor the structure will withstand the expansion caused by ice formation.
Water from manufacturing process,
cooling towers, etc. that regularly daliver
water across the roof for normal drainage.
z2~--Zz.Z Z=a-.a:-=
Drains are
sized to deliver a controlled amount of water
to the storm system and thus regularly neces
sitate heavy watar ponding.
KOPPERS 7.1/Ko Architectural and Construction Materials
deck construction: Poured Concrete
* Poured Gypsum * Precast Concrete
V-'aisr Cooled Reefs
* Spray. Syeteme * Ponded Syetams
Y/ater Retaining Roofs
e Proceta Water
Retarded Drainage System
* Controlled new SLOPE Seepg.4 SURFACE Double Aggregate (with double pour)
Spe. No. 23-4 ply--on deck Spec. No. 24--3 ply--on deck Spac. No. 23 wi--4 ply Spc. No. 24 wi--3 ply wi: with board typa insulation
Spac. No. 23 wiv--4 ply Spec. No. 24 wiv--3 ply wiv: with board typa insulation and vapor barrier
Note: The beee sheet eltemate shall not be used.
i .--CCE3URS
V. Select clauses as required. Optional
specifications used shall ba as follows:
c/ausas in italic.
Zzz. - zs :* zs.'zss zza: ' zz: ci
'zz'~z
Water Cooled Roofs--Koppers Flashing Specification No. 110 only shall be used. See Pg. 21.
Water Retaining Roofs--Either Koppers
Condition of Surface to Receive Roofing Se Page 5.
Flashing Specifications No. 108, No. 710 or No. 110 shall be used. See Pg. 20 4.21.
d. Insulation and vapor barrier, if used,
Material Quantity Requirements
shall be applied according to procedures
See Page 7.
found in basic specifications 5 4 7 (Pg. 9), 10 4 11 (Pg. 10), 12 4 13 (Pg. 11).
A--.icatlsn 3ui!:-*'jc coc:'*ig
a. Specifications 23 and 24 may be ap
"si.
5 . s-
zsz-
a-.- Cos: Tar
plied over wood deck (Pg. 8) or metal decks (Pg. 12) only if used as Water Re taining Roofs. Insulation and vapor barrier,
S.ic. Scsc. No. 23
if used shall be applied according to pro
-:z . Z.g' --r i^Z'S SU"`aa `ZZ' .J.
cedures found with these specifications.
: 9= ; ' zzzvz ~=rsz ; ^zz -z z S3
v. a- --r zr<s--s:i -27': -z~ss.
"zz zz
ziZ'.ssr. sszr 27"; r.zr
- Zzi
z '.men so zni:
asr^
3'i t
2nd. Sosc. No. 24
-zz . z s' s~: s s.-`izs :r.-ss 3-
z - ; -zzz; ; ~:--gz -g -zz ~z z ss
-~z -zs Zz-. -zss.
:z zz z . zg" aaz- z~::
a:
= "a
i!-:: - ~z : szs
: i
- '? : .a ; -z ~z gss
v .i-'r.:. z--;zgs.
..3..rd... _i_. ..5 , 9-- a =.-s:a r :*=
Czz ~z- = :..-=n r-~ziz r-z' s-s
:c.-
* a a"
Note:
a. At point* where water pressure from the spray may be excessive, the roof surface should be protected with treated board platforms or other suitable construc tion to break the force of the water. Theta platforms should ba laid on top of the roof surface and not fastened to the deck.
b. insulation under a Water Cooled Roof should be of a type which is rigid, dimen sionally stable with high compressive strength and of a sealed cellular structure such as Foamglas.
c. At all points where roofing membrane meats a vertical surface the flashing
f. Roof Structure design live loads for specifications 23 and 24 shall be a mini mum of 50 psf and deflection shall not exceed 1/360 of the span, both in addition to the anticipated weight- of the water. Insulation joints must be taped. Vapor barriers must ba two ply, solid mopped. Use staep asphalt over matsl decks. Wood must ba treated to prevent warping (see "wood nailing strips").
Oanaral Requirement* on pages 5.8 and 7 and Data* Specification* on page* 20 through 25 are a part of this apeelficatlon and must ba adhered to where applicabia.
13
Specifications (continued)
deck construction:
Wood Fiber
SLOPE See pg. 4 SURFACE Aggregate
Spec. No. 27--4 piy Spec. No. 28--3 ply
Spec. No. 27 wi--4 ply Spec. No. 28 wi--3 ply wi: with board type insulation
Spec. No. 27 wiv--4 piy Spec. No. 28 wiv--3 ply wiv: with board type insulation and vapor barrier
AM decking mu*t be installed in strict accord* anea with tha particular dack manufacturer's
recommendations for installation. Dack ma terial must ba protected during shipment job site storage and prior to roofing application. No planks which have become structurally weakened due to moisture, fractures or muti
lated edges may ba used. All joints must be level and preferably grouted full and level with plank surfaces are recommended by the deck manufacturer. All planks must be well
anchored to supporting members to resist movement in a fashion recommended by tha deck manufacturer. Any planks which bow or deflect or do not seat securely must ba replaced. Responsibility for the selection of a particular type of wood fiber deck, its installa tion. provision for expansion and contraction, its suitability to job requirements, and its ability to support anticipated loade in its en vironment rests with the designer and dack manufacturer.
z~ZZzZ - nE
Select clauses as required. Optional clauses In italic.
Condition of Surface to Receive Roofing See Page 5.
Material Quantity Requirement* See Page 7.
2. Insulation with Vapor Barrier. Install two (2) plies of No. 15 asphalt fait lapped nineteen (19) inches in Type III steep as phalt aa par- 1st paragraph of this specifi cation. Plies shall be mopped solidly so that In no place shall felt touch fait. Install insulation in solid mopping ot steep as phalt. Roofing over insulation is to be in accordance with the details of the specifi cations below with base sheet mopped solidly to the insulation.
Insulation and Vapor Barrier
1. Insulation without Vapor Barrier. In stall insulation in a uniform coating of Type III steep asphalt. Nailable insulation not exceeding one (1) inch thick may be installed using 1% inch Simplex Tube-Cok nails at all four corners and at canter of board. Installation of roofing over insula tion shall be as par specification outlined below with base sheet mopped solidly to the insulation in steep asphalt
Por bonded roofing applications, fast eners, other than Tube-Lok nails, must be acceptable to Koppers. Fasteners shall be applied at the minimum rate of one (1) per square foot as recommended by the Struc tural Wood Fiber Products Association.
14
General Requirements on pages 5, Band 7 and OetaB Specifications on pages 20 through 25 am a part of this specification and must be adhered to where applicable.
r
DYCON* CONCRETE ROOF DECKS
BUILT-UP ROOFING SPECIFICATIONS
DECK CONSTRUCTION:
KOPPERS 7.1/Ko
Architectural and Construction Material*
Substrata: Steel Centering
Substrata: Structural Concrete
(Monolithic Procast or Vapor Barriers)
lubstrate: Formboard nd 3u!b Tees
SLOPE See pg. 4 SURFACE Aggregate
The following specifications apply only to approved Dycon* concrete formulations. The general requirements of Koppers cur rent built-up roofing manual are part of thia specification and must be adhered to where applicable.
PROCEDURE
Select clause* aa required. Optional clauses in italic.
rc.-i-bcard Sulb Tees
Acc.'y a .-.form :ca*.:r.g of oe i'l
S.:-e;
.-.e 5-:.-i = -to
which. whiie hot. emceo tne .~3u.at.cn. !f
:re-e are two 2' ayers of nsciaticn moD
the en*i-e surface of tne f'rst' i=>er .vith
Tyoe hi Sfsep Ascns.t
.vn:cn. white
hot embea :.-.e seccnc '2;e' ;f '.-.sulat.c.n,
*.Vhpn a memo.'ane is iistaH'ed uicer
tr.c -rSw-it . 1 -2
-SO''S I
OS .r! * f "2!1 nfj " .'ST a
.-.plies:;!-! of RcCi-g s`s-!3,s Over Rigid Board insui.v.cn
iced.' ;*
Th* general requirements of Koppers cur rent built-up roofing manual are part of this specification and must be adhered to where applicable.
Condition of Surfaca to Receive Roofing See Page 5.
Material Quantity Requirement* See Page 7.
ico-co ::
D'ane 3a!sw Rigid
I;;'-: ..'.s..2t:on
- ; -. ; '7-, Z'it Ms'nsrane : T :1Z
. z: Ccfc'rte
C5"i6r-^9
Dycon concrete it a cementitioue lightweight insulating mat*rial, mixed and pumped on fob site end is mad* from expanded polystyrene aggregate and cement according to Koppers specification.
15
EXELTHERM Roof insulations
ExelthermTM Urethane insulation board combines a core of rigid, closed-cell urethane foam with integrally bonded, asphalt-saturated felt skins. A low "k" factor combined with high moisture re sistance and moisture vapor resistance derived from the asphalt-saturated skins provide high insulating efficiency and long life. It is approved by Factory Mutual (or use above noncombustible roof decks and as a Class II material on metal decks.
Sizes Available: 36" x 4*', 48" x 9*", 36" x 46", longer sizes available upon request
THERMAL CONDUCTANCE AND HANDLING DATA
Thickness' "C" Value "R" Value (Nominal)
0.19 5.26 0.1 S 6.67 0.12 8.33 0.10 10.00 0.09 11.11 0.06 12.50 0.07 14.30 0.06 16.66 0.05 20.00 0.04 25.00
'Includes both membranes 'Stock eixas
.8" r** 1.2"" 1.4"** 1.5" 1.75" 2* *
2.25" 2.5" 3"
Pieces/ Bundle
8 8 6 6 6 5 4 4 3 3
Square Ft. Per Bundle
96 96 72 72 72 60 48 48 36 36
Aoprox. L=i Per Bundle
39 51 44 48 46 42 36 ' 40 26 33
Flute Soanability
2%" 2%" 3" 3%" 3%" 3%" 3%" 3H" 3H" 3H"
ExelthermTM Composite combines two time-proven building products, urathane roof insulation and perlite board. This unique combination provides a commer cially acceptable urathane insulation with both Factory Mutual approval for Class I construction and Underwriters' Labora tories approval for use in Construction I and Construction II.
Sizes Available: 36" x 46", 36" x 42".
16
THERMAL CONDUCTANCE AND HANDLING DATA
"C" Value
0.15 0.13 0.10 0.08 0.07 0.06 0.05
"R" Value
6.67 7.69 10.00 12.50 14 30 16.66 20.00
Thickness (Nominal)
1.5" 1.6" 1.75" 2.0" 2.5" 2.75" 3.0"
Pieces/ Bundle
6 6 5 4 3 3 3
Square Ft. Per Bundle
72 72 60 48 36 38 36
Approx. Lbs. Per Bundle .
70 70 65 56 44 46 48
Flute Soanability
2H" 2%" 2tt" 3H" 3*6" 3*" 3H"
IYSTEMS
aluminum KMM
luminum KMM membrane ie a ftveyer laminate composed of a thick, exible plastic core which is pro* icted on each side with a layer of odifled bitumen. The top surface of laminum KMM is a heavy, embossed luminum foil, and the bottepi surface i atilm at polyethylene. '
loth versions of KMM membrane are'
upplied In the form of compact,
sady-to-apply rolls.
`'
Use
Both KMM membranes are designed for use In various roofing and water proofing applications.
Standard KMM membrane is normally used in roofing systems which incor porate an aggregate surface of where protection from the atmospheric ele ments is afforded to the KMM surface by other means. Standard KMM is ap propriate for use in vertically as well as horizontally applied waterproofing systems where surface protection is specified.
Aluminum KMM membrane is ideally used in roofing systems in which the roof slope is too steep to permit aggregate surfacing. Aluminum KMM is also employed in flashing systems.
KMM membrane has good elongation properties to withstand normal struc tural movement when recommended architectural practices are followed. It is suitable for application over most decks and commonly used insulating materials which provide continuous support for the KMM membrane.
KMM membrane is a prefabricated sheet which is simple to install. It results in a completely waterproof system impervious to air, water vapor and gases. Since KMM membrane is factory-madp, it provides a factoryassured quality membrane of uniform thickness aftd material composition.
The function of the bitumen covering is to protect the central plastic core from damage during installation, to provide the basis for the heat fusion between the sheets and t&add to the water resistance of the laminate.
The adhesion of the bitumen to the central core is positive and allows enough flexibility for the complex to give a floating membrane "effect in service. In addition, KMM membrane has good elongation properties so there is virtualiyno possibility of dam age from normal structural movement or minor substrate cracking.
The Koppers method can allow con tractors to install roofing on new buildings at a much earlier stage than with conventional processes, and therefore proceed with other stages of construction.
KOPPERS 7.1/Ko
Architectural and Construction MatanaIs
Application
Easy Modification
STANDARD KMM MEMBRANE
ALUMINUM KMM MEMBRANE
and Repair
Standard KMM membrane is applied without adhesive in a quick and simple manner. The KMM membrane is un rolled directly onto the roof deck or insulation with 4" end and side laps. The laps provide a joint which is sub sequently sealed by heating with a standard propane torch. When com plete, the KMM membrane sealed roof is covered with a protective topping.
Aluminum KMM membrane is solidly adhered using a cold adhesive, and does not require a separate topping. It also may be applied to vertical walls and parapets. Heat fusion of the laps and terminal edges complete the in stallation.
KMM Adhesive
Package Size: 5 gal. containers.
KMM membrane readily accommo dates in-progress design changes such as the addition of unplanned rooftop projections, as well as any later additions or modifications to the building. In the event that KMM mem
brane sustains physical damage, it is a simple procedure to repair, requir ing only a torch and appropriately sized pieces of KMM membrane.
Top Surfacing Several topping systems are rec ommended for use with Standard KMM membrane. Please contact your Koppers representative for details.
Weight: Approx. 55 lbs. (includes con tainer weight)
Membrane Coverage:
a. Roofing and Flashing Applications: 1 to 1 Vz gal. per square.
Guarantee A 5 year renewable guarantee is .
available for KMM membrane roofing installations. Consult your Koppers representative for details.
Note: For additional information
Loose Aggregate Topping
b. Vertical and Plaza Deck Water and complete details see the KMM
a. Aggregate: Either gravel or stone,
proofing: 2 to 3 gal. per square.
specification manual (Sweets Catalog File No. 7.1/Kop
__ graded to %" nominal size (S.P. No. Color Coatings for KMM Aluminum
f
57--U.S. Department of Commerce
Membrane
Simplified Practice Recommendation Field applied coatings for KMM Alumi
R-163).
num are available in 14 colors. For
The quantity to be used is 1200 lbs. color selection, consult Koppers Mas
per square (approximately ^Yz" thick ter Color Selection Chart 560-L under
ness of loose stone).
Koppers Acrylic Emulsions, Numbers
NOTE 1: If smooth gravel is not avail 600 and 610.
able, a fiber glass' batting must be Recommended Slopes for KMM
used as a cushioning for sharp edged Roof Systems
crushed aggregate.
Koppers recommends that the maxi
mum roof slope for loose stone top
b. Fiber Glass Batting: Fiber glass ping systems be one inch per foot and
batting shall be unfaced and of 1" that the maximum slope for the emul
minimum thickness. Either sheet or sion aggregate system be one and
roil form is acceptable. Aggregate ap one-half inch per foot There is no
plication by gravel buggy is recom maximum slope for the KMM Alumi
mended.
num roofing system.
NOTE 2: Slag is not a permissible ag gregate for the KMM Roofing System.
KMM Membrane
Bituminous Aggregate Topping (BAT) BAT consists of a combination of graded Vt" gravel and asphalt emul sion. The recommended quantity is 650 to 700 lbs. per square (approxi mately %" to 1" thickness).
Rolf Size Thickness (nominal)
Standard KMM 43" x 33 L.F. 118 sq. ft. 107 sq. ft. coverage
160 mils
Aluminum KMM 43"x33 L.F. 118 sq.ft. 107 sq.ft, coverage
120 mils
Weight (nominal)
120lbs./roil (includes packaging Score)
95 lbs./roll (includes packaging
Score) -
19
Built-up Flashing Specifications
" 5.*s'ai
Flashings are the terminal closures of a roofing system which perform a waterproofing, and in some systems, a decorative function. Flashings must be installed at all intersections formed by vertical surfaces. Their im* portance cannot be stressed too strongly. Water entering the roofing system through flashings can result m water vapor forces which will de stroy the effectiveness of the roofing.
Koppers flashings are an integral part of a Koppers roof. Designed for flexibility so that slight movements do not dislodge them and fastened securely to the wall, they give many years of service.
It is particularly important that the top edge of the flashing be protected by counter flashing, which will insure a diversion of the water away from any opening which might develop be tween flashing and wall.' In any case where the design or anchoring system of metal counter flashing is difficult, the top of the flashing system should be double stripped with Koppers Glasfab 4" wide set in Koppers tar
base cement for Specification 110 or Koppers flashing cement in Specifi
cation 108. Metal work is only useful for dec
orative, water shedding, or protection against mechanical damage, and is not a waterproofing part of the flash ing system. Because of the high co efficient of expansion of sheet metals and the large temperature changes experienced on a roof, sheet metal or exposed metal components must be isolated from the waterproofing com ponents of the roofing and flashing system as efficiently as possible to prevent the metal from splitting the membrane.
Flashing should be installed as roofing progresses to prevent water damage to insulation or deck under the roofing. If this is not possible water cut-off's must be installed and later removed when flashing is in stalled. Metal counter flashing or a top seal of Glasfab and flashing ce ment must be installed as flashing
progresses. The basic Koppers flashings re
quire a metal cap flashing to be in serted in the raggle immediately upon
completion of base flashing. The cap flashing is to extend into the raggle not less than two (2) inches and is to have not less than a four (4) inch exposed apron extending down over the base flashing. Completely fill rag gle with Koppers flashing cement.
NOTE:
1. If bonded flashing is required, it must be installed in conjunction with a Koppers bonded roof and can be bonded for standard periods up to but not greater than the period for which the roofing is bonded. To be bonded, flashings must be set at least 7Vi" above the roofing base.
2. Metal Cap flashings are not bondable and are not included under any flashing bond.
3. Metal work of any description used as flashing or a part of a flashing sys tem is not bondable and is not in cluded under any flashing bond. Note: Termination of flashing may be accomplished without metal counter flashing. Consult specification =710 on this page for specific details.
.. - - io. 7': (KMMAluminum)
Application Detail Specification No. 710
This specification is applicable for use with any KMM membrane or builtup membrane roofing system where its terminal closure intersects a verti cal surface, such as a parapet wall.
' METAL CAP** PRIMER ADHESIVE KMM ALUMINUM MEMBRANE
Koppers Flashing Specification 710 consists of an aluminum clad KMM membrane applied to waterproof the 1 terminal closure of the roofing system. ; The Aluminum KMM forms a water' proof flashing system by total adhesion to its substrate and through the use of joint heat fusion, a unique . process whereby all contiguous joints ; are affixed together to develop a , monolithic waterproof flashing system.
: Application
This specification system shall use : Aluminum Grade KMM as the main - flashing membrane.
Each course of Aluminum KMM ' shall be unrolled and cut to appropri ate size prior to setting in place.
Apply acoat of KMM Adhesive at a ! rate of 1 to 1 Vi gal. per square to the
completed roofing membrane and parapet wall.
While the adhesive is still tacky, set a layer of Aluminum KMM into place extending above the top of the roofing membrane a minimum of 7Vi" and out ontg the completed roofing membrane a minimum of 4 to 6". Ad jacent pieces shall be side lapped a minimum of 4".
Rub or brush thoroughly to obtain proper adhesion and to remove all entrapped air out from under the flashing membrane.
Heat-fuse all terminations, as well as side and end laps.
The contractor shall thoroughly in spect completed flashing system at the end of each day's work.
A high quality varnish-base alumi num paint may be applied to -any ex posed streaks or seams of bitumen.
Note: Terminations of flashing spe cification -710 may be accomplished without a sheet metal counter flash ing. For additional deta -s see Kop pers KMM specification manual or your Koppers representative.
20
KOPPERS 7.1/Ko
Architectural and
Construction Materials
Specification No. 1C3 (reinforced asbestos)
Application Detail
,<* Matte Ceiewer
tiaM
P/J`
1 fteaoan Me l S Atanw*
-ii--;'jVil
IWmNyUmSAMtarntttKeelMre*iCt imM
1 !IH "*--"*--*--t n `r"*----
--Cane Vr*o-' OAideeSetHmeSRtuetw* eh*iimiet*Soeneinuemr *ee>
Specification No. 108
Recommended where sunlight Is the predominant exposure. Should be used for all high flashing.
METAL CAP ASBESTOS 8ASE(1 -1) COATED SURFACE
Application
Extend plies of roofing (alts and bitumen moppings up all walls, parapets and curbs for a distanca of two (2) inches abovs cant strip.
A raggle not less than Sevan and onehalf (7'/j) inches or more than twelve (12) inches above the roof deck is to be pro vided except where capped nailers are used.
Prime all masonry walls from top of roof ing felts to raggle with Koppers Asphalt Primer. Allow to dry thoroughly.
In a uniform coating of Koppers Flashing Cement.* install pne (1) ply of Koppers No. 15 Asphalt saturated asbestos felt extending from the raggle to not less than four (4) inches from the base of the cant onto the roof. On top of this apply a second uniform coat of Koppers Flashing Cement into which embed one (1) ply of Koppers reinforced asbestos base flashing (rein forced fabric side down.. Nail with one and one-halt (114) inch masonry rooting nails through flat tin discs along upper edge eight (8) inches o.c. maximum into mortar joints. For concrete construction, nail to treated wood nailing strips set in
flush with the surface with appropriate nail through flat tin discs.
End laps for the two (2) plies shall be not less than three (3) inches and staggered not less than twenty-four (24) inches. End laps of reinforcad base shall be nailed vertically a minimum of once into the wall at uppar edge and once into the cant at a point not lower than the mid point ot the cam.
End laps of reinforced base after nailing shall be covered with a strip of Koppers asbestos felt not less than four (4) inches wide set in a coating of Koppers Flashing Cement
Coat entire surface of flashing with Koppers Flashing Cement or Koppers Asphalt Roof Coating No. 4S4 (including nail caps along top edge of flashing as wall as top edges of felts to seal at wall.)
Interply and top coatings shall be trow eled uniformly, full height and continuously approximately one-eighth (V) inch thick. Piles must be laid in smoothly with no pockets, wrinkles or buckles.
Install mstal cap flashing.
'NOTE: Hot applied steep asphalt may be used as an alternate to the two (2) interply trowelings of asphaltic plastic cement. One (1) ply of No. 15 asphalt felt may Oe used in lieu of the one ply underlayment sheet of No. 15 asphalt asbestos felt when required. All other requirements of this specification must be adhered to.
:. t :...ca;;cr! No. 723 (For water cooled roofs)
Recommended with water-cooled roofs, water-retaining roofs and retarded drain age systems.
METAL CAP KMM ADHESIVE KMM ALUMINUM MEMBRANE
Specification No. 720
Application
Cant strips shall be Installed at the angle between the roof deck and the parapet wall or any other similar perpendicular surfaces.
Extend plies of roofing felts and bitu men moppings up ail walls for a distance of two (2) inches above cant strip.
A raggle of not less than ten (10) inches above the roof deck is to be provided for water cooled roofs and water retain roofs.
Prime all masonry walls from top ot roofing felts to raggle with high pene trating asphalt primar. Allow to dry thor oughly.
Apply a coat of KMM Adhesive at a rate of 1 to 1% gal. per square to the completed roofing membrane and para pet wall.
While the adhesive is still tacky, set a layer of standard KMM membrane into place extending above the top of the
roofing membrane a minimum ot 8" ana out onto the completed roofing mem brane a minimum of 4". Adjacent pieces shall be side lapped a minimum of 4".
Rub or brush thoroughly to obtain proper adhesion and to remove all en trapped air out from under the membrane.
Heat-fuse all terminations, as well as
side and end laps. Apply a top coat of KMM Adhesive at a
rate of 1 to 1% gal. per square to the cushion layer.
While the adhesive is still tacky, set a layer of Aluminum KMM into place ex tending above the top of the roofing mem brane a minimum of TVi" and out onto the completed roofing membrane a mini mum of 6". Adjacent pieces shall be side lapped a minimum of 4".
Rub or brush thoroughly to ^obtain
proper adhesion and to remove all en trapped air out from under the flashing
membrane. Heat-fuse all terminations, as well as
side and end laps. The contractor shall thoroughly inspect
completed flashing system at the end of each day's work.
A high quality varnish-base aluminum paint may be applied to any exposed streaks or seams of bitumen.
21
Flashing Details
1 GENERAL INFORMATION
\ Thera ara numerous flashing details that have
1 bean proven by experience over the years* There I are normally a number of acceptable construction i details for accomplishing one purpose. The archi tect should select a detail that best serves the j purpose under the various and different condi' tions concerned with the specific job at hand. In j certain cases, slight modifications are necessary j to adjust a proven detail to job conditions or one ' method may serve better than another.
The details shown in this manual are some sugj gestions baaednon experience. Space limitations prohibit listing many others. ] Design or selection is a responsibility of the ! architect. I Koppers representatives are available to review | flashing details to assist the architect in providing rite best details for specific Jobs.
7.4 Parapet/Precast or Poured Concrete
1 I
FtscCeaCsatnocrfRwot*urso
Seated Wood Na*t#r
Vote fVsif o* Pr*oer*c ro
CxmiAMg water Penetration 3OOt>f- Concrete ?0Unde<w3*ct
7.5 Parapat/Mata! Curtain Wail
Treeaed"mo**#*fssasMwOk* -
wooeCaet* *4
. 7.3 Equipment Support
2 Plies oft fMembrane in
I -- Setmm
Fleashing Cement Turned Down / *
Over Edge
/ y Neooren* Pad
FMenfSeec. *10 *710 or *U0
__. Sheet Metal
Koppers Roofing df
Cant 4" a 4*
Treated wood Nailers
22
Flashing Details (continued)
7.7 Tapered Cant
KOPPERS 7.1 /Ko
Architectural and Constructxxi Materials
7.3 Tapered Cant
F(ng* width 4* minimum
MewGft** Stop Set m *ooo*n Fitsnmg Cement
Fftgn iwee
N*n spaced l- from edfaot metat unp and 3- apart m treated wood
naumesmo TlW> ,** * frt
eer Flangem CoatTar BdMmn or Tv Base Cement
Tapered Cant rneime 2~ oer toot
Rooting Memorane
Flange width 4" minimum
C'arei Stoo Mmimgm t Hfignt
Nans spaced t' tromadgeotmetai stno ano 3" aoan m treated wood
over Flange >n Coat Tar Bitumen or Tar BaieCament
Taoeraa Cant nenne 2*'per >oot
Roofing M#mo/ane
Treated Wood N^ter
7.9 Hanging Gutter
Koopers RooAng
Appropriate NeiH and Uftfff For Maximum Ancftorapt
Metal Gravet Stop
W<ttt 4" Flange
Baddad m Koppare Fiaanmg Cament
Treated Wood Nailer
7.10 Vented Edge
Flange Set m Aoooers Fiasning Cament
F<t enmopj*
v Gravel Stop nailed 1" trom >nnar edge of Flangeand 3*OC -- Flange wuBft 4- minimum -Aoopers Rooting Two Ate of Fed Fearnered Over Flang* m Coal Tv Bttumen or Tar Base Cement Tapered Cam Maximum neime-2-oer loot
insulation vaoor Barrier Treated Wood Naner t vent hoi#Openings 18" to 24- 0 C.
Vent Pipes, Stacks, Flagpoles, and Other Projections 7.11 7.12
l_TaoMtStti(*S in Bttuman mar Laid Flans*
Maul Band loltad On
Macal Ottoman Oam --t Sat in Iowan Fiaanm* Camant
` ' I 'bLUMnata* SSihmumiaann COaamm I1
Sat ai Korean Flaafun* Camant
All vent pip#*, stacks, flagpole*. or other prajoctions penetrat ing tli# built-up roofing, whether indicated on drawing* or not, must hav# a proper metal sleeve flashing with flang#, pan flash ing with flang# or othr flanged flashing installed.
Behind metal sleeves and beneeth the roofing membrane next to deck install a metal bitumea dam aa shown in detail. The sheet
metal flange must be cemented to the surface of the felt with a mopping of hot Coal Tar Bitumen. Over flange apply, with alternate moppings, two (2) reinforcing plies of fait so that the first extends not less then three (3) inches beyond the outer edge of the flange and the second not less than six (6) inches.
23
7.13 7.14
Cant' /
Traatad Wood Nailar Surrounding Column
Stub Column Attacnod to Structural Framing
At all locations where stub or futura columns, sign supports and angle irons are to penetrate built-up rooting, Koppers recom mends wooden curbed base units with cant strips to be installed to accept standard built-up composition-flashing system. Where structural steel section extends beyond "stub" height, metal cap
flashings with tight fit to the structural section must be fabricated and continuously welded to the projection to assure a watertight metal cap.
For pitch pocket design consult your local Koppers sales representative.
7.15 7.16
; Curb expansion joints areslo be -flashed in accordance with Koppers specifications for parapet walls and must provide nailing
. to hold metal cap and flashing' membrane in place. Metal cap must be designed to expand so as not to disturb flashing. It is the responsibility of the designer of the building to provide
; for adequate expansion joints. For the protection of the roofing system against spllta caused
by expansion and contraction, Koppers recommends that an ; expansion joint be installed: (1) on large roof areas at least every ; 200 feet in each direction, (2) at all places where the structural : supports and roof assembly change direction, (3) where type of ! adjoining deck materials change.
! Where control, expansion, or contraction joints are provided | in structural steel, deck material, or deck system, provisions I must be made for continuation through the roofing system, i See (Expansion Joints) Page 8.
All roof drains shall be provided wititflnetai roof drain flashing -
Danger which extend a*- least 12" beyond drain opening, and shall be stripped with felt in accordance with drain detail. All drains should be provided with expansion joint sleeves.
The sheermetal flange furnished with the dralaanust be ce mented to the surface of the felt with hot Cool rSe-bitumen or
flashing cement. Over the flange apply, with alternate moppings or trowelinga, two (2) reinforcing plies of felt so that the first ex tends not less than three (3) inches beyond thejjuter edge of the flange,^and the second not less than six (6) inches.
Roof, drains must be of a type provided with a, wide lead or copper flange. Strainerconstniction should provide adjustment for meeting variations la roof level or slope. -
To obtain proper drainage^ root drains should be located at pcrints of lowest expected dslfetfon in roof deck. Special care must be taken to^svent bitumen migration into drain
openings.-
24
.* SSr.iTQ D3*3i'.'3 (CC ued)
7.17 c: Vent
i
KOPPERSj 71/Ko
Architectural and
I
Construction Mattests I
7.18
.5oc:<st
I Loom Insulation
Koppers doss not recommend ocessionsl or spot vsnts through ; the roof ss the only vsnting msthod or a substitute for undsrsids
or continuous vsntsd systems. There may be certain instances ! where spot or mushroom type vents might be deemed advisable
by the designer for a new building (eg. at expansion joints for vent relief on long run underside continuous venting systems, etc.
Although controversial, the "Pitch Pocket" is one of the most 1 frequently used design details.
The sheet metal flange must be cemented to the surface of the
felt with hot coal-tar-bitumen or flashing cement. Over the flange apply, with alternate mopping*, two (2) reinforcing plies of tarred felt so that the first extend* not less than three (3) inches beyond the outer edge of the flange and the second no less than six (6) inches.
Pill metal pan with hot coal-tar-bitumen or flashing cement. Paint exposed sections of all reinforcing rods with dampproofing paint.
7.19 V vays (Treated Wood Walkway)
Trttttd WOOMfl TrMMdPl8MlWhsMy Roohrtf MtmOr*Ptu
7.20 Traffic Pad
*ft6oo0f0m*c9
CftrwnGr8ouw ACfrH*'*
7.21 Poof Opening
Curbs extending a nominal 8 inches to 12 inches above root surface shall be provided at all openings for skylights, ventilators, expansion joints, etc., to pro vide for installation of adequate base flashing.
Skylight
Condensate Gutter
--Ventilator
Flashing Nailed 10" O.C.
Flashing Specs. #108 #710 or #110 Koppers Roofing
Wood Cant 4" x 4" Treated Wood Nailers
25
Koppers Coal Tar Bitumen
i
i i
Bonds and Guarantees are available for listed specifications in this man ual. To qualify for a Koppers Roofing Bond or Guarantee, roofing and flashing must be constructed in ac cordance with Koppers Specifica tions. with Koppers materials, and by a roofing contractor approved by
Koppers.
=.CCF
==CG=AM
l. Description
Koppers bonds are available for 10, 15 or 20 year terms, and only cover built-up roofing and flashings where approved.
Koppers will issue a standard roof bond for Coal Tar Bitumen flat or low slope roofing and will include such'
Koppers steep asphalt roofing as re quired in conjunction with the flat or
low slope roofing, provided, the steep roofing does not exceed 25% of the total roofing to be bonded. All roofing
to be bonded must be constructed in conformance with Koppers specifi cations.
Koppers bonds are not available for residential roofing.
Koppers bonds are. transferrable upon timely written notice of change of property ownership.*
NOTE: Koppers roof bonds provide for repairs of leaks to the roofing not occasioned by defects in the building, abuse or extreme weather conditions during the term of the bond up to the monetary limit specified in the bond.
II. Coverage A. Roof bonds provide for the fol
lowing general benefits: 1. Use of quality materials. 2. Use of time proven specifica
tions.
3. Roof application by a roofer knowledgeable in 'the* application techniques of Koppers products.
4. Discussion of specifications during the planning stages and during construction.
5. Assistance to the owner as nec essary for items such as leaks to the roofing not occasioned by building defects or additional roof projections, etc. which relate to the performance of the roofing.
6. Flashing membranes covered on request only.
B. Roof Bonds DO NOT cover the repair, installation, or replacement cost of the following:
1. Decking Materials
2. Vapor barriers
3. Insulation Products 4. Metal Work
5. Products in the roof assembly furnished by others.
6. Damage to the bonded roofing or flashing caused by the use of the products listed in 1 through 5 above, their installation or attachment.
7. Vandalism or owner abuse.
8. All other items presented in the sample bond presented above:
C. Koppers bonds are available within the Continental United States in all cases except those areas where Koppers does not presently provide inspection service.
D. Built-up flashing may be bonded for terms up to but not exceeding the term for which the roof is bonded.
E Charges for the roofing bonds are made on a per square (100 sq. ft.) .basis of the- roofing membrane.
F. Koppers reserves the right to cancel the bond if the roof is damaged due to causes not covered by the bond if it is determined its satisfactory per formance for the remaining term of the bond is impaired. Cancellation due to damage of this type does not provide for any refund of the original charge.
Koppers Bonds/Guarantees
r-
KOPPERS 7.1/Ko Architectural and Construction Materials
1 j i i
!
C|
ROOF GUARANTEE PROGRAM
Koppers offers the following Built-Up Roofing Guarantees:
10 year guarantee with a 10 year re newal option -- for 4 ply Coal Tar Bitumen roofs only.
5 year guarantee with a 5 year renewal option -- for 4 ply Coal Tar Bitumen roofs only.
KMM GUARANTEE FOR KMM MEMBRANE INSTALLATION
For further information contact your Kop* para representative.