CELANESE CHEMICAL COMPANY Che me el Plant Bishop, Texas
Laboratory Department Summary - March 1973 -
RGB 9-73
Distribution: Messrs.
J. H. Frick A. S. Baker
--
W. C. Beyer
T. N. Dowdy
H. A. Ducote
S. W. Fretwell
E. J. Heinz
L. D. Hinson
J. M. Hodges
M. A. John
C. C. Johnson
B. C. Kerr
M. Lantau
G. C. Lease
C. W. Lee
W. W. Massey
J. T. McMahon
W. O. McReynoids
R. G. Pongetti
R. H. Prinz
W. L. Sharp
B. F. Smith
O. Towery
P, A, Turek
R. H. Wile
C. H. Wilke r
K. A. Wolf
Bishop
Dr Dr Dr
F. T. Talbert J. W. Corley J. M. Ramey T. D. Hunt
-
-
-
-
W. H. Tuke
-
F. B. McAndrews -
F. Zitomer
-
W. E. Heinz
-
W. J. Humphrey -
W. T. McNair
-
D. R. Napier
-
W, E. Taylor
-
E. N. Wheeler
-
Central Files
-
Bay City Clear Lake NYCS Newark Terminal Pampa. Summit Summit CCCTC CCCTC CCCTC CCCTC CCCTC CCCTC CCCTC
002580
CELANESE CHEMICAL COMPANY Che me el Plant Bishop, Texas
To: Mr. L. L. Schweers From: R. G. Brandt
RGB 28-73
April 6, 1973
Laboratory Department Summary - March 1973 -
Status of Laboratory Department projects active during March are described below. Current priorities and department statistics are attached.
MO Support - Becker, Harris, Hunter
.Analytical support confirmed iron poisoning of MO IV catalyst at 350-430 ppm level (Reactors 4 and 7). Unusually high levels of nickel (75-90 ppm) were also observed. New catalyst is being installed to increase efficiencies and reduce heavy carbon make.
.ostable reaction in MO III was observed after introduction of methanol from the *eak formaldehyde recovery process (T-185 OH). The problems were believed
be caused by organic chlorides (10-190 ppm) and high methylal (10-15%) esent in T-185 OH. The stream has been switched to feed the absorber *314) and this appears to have solved the problems allowing the undesirable imfities to vent prior to recycle of the methanol. The organic chlorides are lieved to be introduced in the acetaldehyde feed to the PE Unit. Analysis of
III and IIIA spent catalyst confirmed the chloride contamination and showed ttU8ua-lly high levels of nickel (50-500 ppm), and copper (20-950 ppm). Iron *vels were high in some reactors (500 ppm).
ltybical support is being provided to the MO Task Force. Work is continuing ta,.a eftort to trace iron migration throughout the MS and MO systems. Pre-
l&ary results indicate that iron in the MS methanol can be reduced from about PPb to about 13 ppb by reducing the water recycle from MS T-280 to T-279 5?%.
V
Rasing the blowdown from MO III vaporizer from 2 to 5 gpm resulted in a *&cant decrease in entrained iron (reduced from 14 ppb to 4 ppb). This to be a significant change which should improve catalyst life.
002581
Mr. L. L. Schweers
-2-
April 6, 1973
Formalin Quality - Harris
i
Xn improved test method has been developed for measuring methocel (stabilizer) tontent of formalin. The method is now being used for routine verification of
bilizer levels throughout the plant.
ilytical- data show that the new Dow XFS-4048 ion exchange resin (used for maldehyde deacidification) does not affect methocel levels of finished formalin, eport will be issued.
raform Production Problems - Kerr, Prinz, Harris, Hunter
raform production was disrupted for about a week due to premature polymer tion in the second and third stage evaporators. The problems appeared to be lociated with the pH of the evaporators. A pH range of 3. 5-3. 7 appears to be isfactory for smooth operations. Acetic acid is being added to the unit feed to intain this pH range which corresponds to a third stage acidity of 0. 018-0. 025% HFo. In addition, both methanol and methocel have been added to the feed to ''licate VPO product. Methanol and methocel levels are slowly being reduced
.taXiialx minimum levels for optimum quality and cost.
uality - Harris
lems are being experienced in the Formcel Unit. Analytical work is 3 to define the cause.
tnit Start-up - Kerr
s provided during the start-up of the new propanol system. With the iception of the concentrated residual odor, the quality of the finished i good. Purity exceeds 99. 9% with total organic impurities below Concentrated residual odor is superior to Carbide's "Ipk Grade" but Eastman's and VPO propanol. Material balance studies are planned : losses so that unit efficiency may be improved.
Kerr
color bodies are formed as part of the neutralization of the reactor Che color is a function of the final pH of the neutralization. Neutrali. a stronger acid (formic) and a weaker acid (ethyl acetate) than the c acid normally used did not improve the color. The best color appears to
002582
v: Mr. L. L. Schweers
April 6, 1973
obtained by neutralizing to pH's below 5. 0. Due to the buffering effects in the 'stream, acetic acid is too weak to obtain pH's below 5. 0 economically. Work is
ontinuing on this project.
rraldehyde Competitive Product Evaluation
Ducote
Competitive product analyses of Carbide and Monsanto n-butyraldehyde show that ~elanese quality is superior.
odium Formate for Virginia Chemical Co. - Prinz
lb studies are continuing in an effort to remove sodium sulfate from PE "AML" substitution of SO2 hydrolysis for sulfuric hydrolysis. Current studies
dicate that the process may not achieve desired sulfate levels in the recovered odium formate.
_yandotte TMP Complaint - Brandt
v.
returned sample of TMP from Wyandotte- (Lot 7302 ET) turned out to be , `rly typical quality although on the low end of our purity range (98. 7%).
lection of higher purity material may be necessary to satisfy this account.
MP Debottlenecking - Castoro
-boratory studies are complete. Support will be provided when the unit attempts ^plement recommendations published in report of March 29, 1973 (CC 2-73, 107-73, RHP 3-73).
taldol Storage Stability - Hunter
Orage stability studies of crude aldol (T-219 residue) is in progress. Various *bperatures an(l materials of construction are being evaluated.
S^bdenum Promoted Nickel Catalyst - Jackson
..-.tybdenum promoted nickel catalyst ordered for a plant trial run in 1,3 BG Unit * been evaluated. The spot samples checked were acceptable for use. A . * will be issued.
^l*ab will continue to monitor the hydrogenation system in 1, 3 BG during the run. Future studies will include propionaldehyde hydrogenation.
002583
Mr. L. L. Schweers
-4-
April 6, 1973
Low Ethanol Methanol - Jackson
Analytical support was given to the Low Ethanol Methanol Unit startup. Initial [uality problems were encountered from purging the system with very crude nethanol on start-up. The system is now lined out producing good quality pro tect with about 1 ppm ethanol.
RTaste Treatment Studies - Me Reynolds
i*oaming and flocculation problems continued to plague the BOD Unit during the nonth with outfall quality running 150-300 ppm BOD and 150-800 ppm volatile nispended solids. The BOD content of the feed increased from 6,000 ppm to 12,000 ppm as a result of numerous paraform boil outs during the month. The lystem has been flushed with river water and feed is now restricted to Celcon >ressure column residue in an effort to achieve improved operations.
Lab studies are in progress evaluating various plant streams which will be added ,.ck to the BOD system one dt a time once good operation is achieved.
b studies using an anaerobic filter for pretreatment of Celcon sumps is in proass. These streams have been difficult to treat in bench scale aerobic oxifcion alone. Anaerobic pretreatment of a PE acrylate carbonate wash stream s discontinued after the anaerobic activity declined to essentially zero. No ther work is planned on this stream.
|*GB/bb ^Attachments: 2
R. G. Brandt
002584
CURRENT PROJECT PRIORITIES
Priority
Waste Treatment PE "AML" Sodium Formate Recovery TMP Debottlenecking Pentaerythritol Quality (Color) Pentaerythritol Debottlenecking and Efficiency Propanol Support Post Aldol T-135 Res. Recovery Molybdenum Promoted Nickel Catalyst Celcon Support Weak Formaldehyde Recovery Air Emissions MO Optimization
1 1 1 1 2 1 2 1 1 2 2 1
MS Steam SavingsNew Silver Catalyst Supplier Formalin Quality Sodium Formate lbs/gal Table Propyl Acetate Quality Aldol Storage Stability T-275 Residue Reuse
2 3 1 3 1 2 2
Chemist .
Me Reynolds Prinz Castoro Kerr Castoro, Prinz Kerr Kerr Jackson Gary Gary Jackson Becker, Harris, Hunter * Becker Hunter Harris Harris Lease-, Kerr Hunter Unassigned
002585
STATISTICS
Chemical Section Samples Instrument Section Samples Celcon Section Samples
Total
March
4, 515 1,928 1,684
8, 127
Sample Shipping - Domestic - Export - Celcon - Other
Total
191 1 8
25
225
YTD
13,170 6,349 4, 464
23,983
Prev. YTD
13,867 6,216 5,654
25, 737
502 15 52 78
647
500 13 12 41
566
Technicians Overtime - Hours Chemical Instrument Celcon Special Problems
Total
77 31 227
8
343
197 57
402 10
666
239 116 144 100
599
Shipments (No. of orders) . j?ekyed Shipments
Quality Waivers
*tme;r Complaints . u#tomer Complaints Accepted
675
4 0 2 2*
2,249 8 0 4 3
2, 157 4
13 7 7
Diamond Shamrock Para Lump Complaint. See Ray Ory's REO 73-57
March 12-73. Inmont Corp., Clifton, N. J. - Propyl Acetate - Cone. Residual Odor.
002586